Tutorial - 5 and 6
Tutorial - 5 and 6
(On 21/02/2011)
1. Develop a simulation model in ARENA for a Bank with a single teller and customers
arriving with an interarrival time uniformly distributed between 1 and 8 minutes. The
service time of the teller is uniformly distributed between 1 and 6 minutes. Simulate
for 500, 1000, 1500, 2500, and 5000 customers and note down the performance
measures. Assume that the server works for 8 hours a day and 6 days a week. Take 5
replications.
2. What is the effect on the above model if the interarrival time changes to U (1, 10) and
service time changes to U (1, 8)? Note the performance measures with the same run
parameters.
3. Analyse the effect on the system in Question 1 if the management decides to install
two tellers at a time and
Based on the simulation results, which type of queue gives better performance?
(On 22/02/2011)
Run the simulation for 20,000 minutes to observe the average and maximum number
of times a part is processed, the average number of parts in the machine queue and the
average part cycle time (time from a part’s entry to the system to its exit after
however many passes through the machine system are required).
(a) Create a simulation model, with animation (including the travel time from
entrance to check-in) of this system.
(b) Run the simulation for 16 hours to determine the average time in system,
number of passengers completing check-in and the average length of the
check-in queue.
3. Using the input analyzer, open a new window. Generate a new data file (use file –
Data file- Generate new) containing 50 points for an erlang distribution with
parameters: Exp. mean 12, k equal to 3 and offset equal to 5. Once you have the data
file, perform a Fit All function to find the best fit from among the available
distributions. Repeat the process for 500, 5000 and 25000 data points, using the same
erlang parameters. Compare the results of the Fit All for the four different sample
sizes.