100% found this document useful (1 vote)
902 views

Resume Example

This resume is for Muhammad Fadly Bin Abdul Ghapor, a Malaysian male who holds qualifications and certifications in mechanical engineering, welding inspection, non-destructive testing, and pressure vessel inspection. He has over 5 years of experience performing inspections in Malaysia's oil, gas, and petrochemical industries. His experience includes API 510 inspections, plant turnarounds, and training other inspectors. Currently he works as a Third Party Supervisor conducting inspections during plant turnarounds.

Uploaded by

Tazi Rafa
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
902 views

Resume Example

This resume is for Muhammad Fadly Bin Abdul Ghapor, a Malaysian male who holds qualifications and certifications in mechanical engineering, welding inspection, non-destructive testing, and pressure vessel inspection. He has over 5 years of experience performing inspections in Malaysia's oil, gas, and petrochemical industries. His experience includes API 510 inspections, plant turnarounds, and training other inspectors. Currently he works as a Third Party Supervisor conducting inspections during plant turnarounds.

Uploaded by

Tazi Rafa
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 9

RESUME

1. PERSONAL PARTICULARS

Name : MUHAMMAD FADLY BIN ABDUL GHAPOR


NRIC No. : 800414-10-5933
Passport No. : A18847819
Nationality : Malaysian
Date of Birth : 14 April 1980
Age : 29 old
Marital Status : Married
Sex : Male
Contact No. : +6019-6640407
Email Address : [email protected]
Home Address : Lot 1, Jalan 28, Kampung Cheras Baru,
56100 Wilayah Persekutuan Kuala Lumpur, Malaysia.

2. HIGHER EDUCATION AND QUALIFICATION

Academic : Degree in Mechanical Engineering


KUiTTHO (now known as UTHM)
-year 1998 until 2003-

Technical : Authorized API 510 Pressure Vessel Inspector


(Cert No. 28683)
-year 2006-

PCN Level II Welding Inspector


(Cert No. 211851)
-year 2004-

ASNT Level II MT/PT/UT


-year 2004-

Page 1 of 9
3. PROFESSIONAL TRAINING AND COURSE ATTEND

7-11 July 2008:


Attent course ASNT Level III Refresher Course at TWI Sungai Buloh, Selangor,
Malaysia, instructed by Mr. Prem Shajaahan. Topic included Basic NDE method,
Welding Metallurgy and SNT-TC-1A knowledge.

22 May 2008:
Attent Positive Material Identification (PMI) course at ITC Skill Development Sdn
Bhd, Puchong Selangor, Malaysia. Conducted by ZL Tech, Jerman.

5 – 16 May 2008:
Attend Eddy Current Testing (ECT) course MLVK Level II conducted by Agency
Nuclear Malaysia, Bangi, Malaysia.

24 - 28 March 2008:
Attend Train The Trainer course at Perbadanan Sumber Manusia Berhad,
Damansara, Selangor, Malaysia conducted by SHEQ Consultancy Trainer. This
course objective is to train how to be a good trainer and managing the good trainer
preparation.

23 - 27 July 2007:
Attend Radiography Interpreter (RI) course MLVK Level II conducted by Agency
Nuclear Malaysia, Bangi, Malaysia.

18 – 19 March 2006:
Attend Authorized Entrant & Standby Person for Confined Space as per
05/12/AESP/2006/3 Course Code at ITC Skill Development Sdn Bhd, Puchong
conducted by NIOSH Trainer.

9 – 17 May 2005:
A.P.I 510 Pressure Vessel Inspections Certification Preparation Course accordance
to ASME II, ASME V, ASME VIII, and ASME IX at Concorde Hotel, Shah Alam,
Selangor, Malaysia, conducted by Authorised A.P.I Instructor from IRC, U.K.

14-15 July 2004:


Confined Space Training for Authorized Entrant at Gas Processing Plant Complex
A, Kertih, Terengganu, Malaysia.

June 2004:
NIOSH PETRONAS SAFETY PASSPORT COURSE at NIOSH East Coast Branch,
Kertih Terengganu, Malaysia.

CIDB Safety Course conducted by qualified Construction Industry Development


Board Malaysia Instructor at Intestmal Corporation Training Room.

7-18 March 2004:


PCN WELD INSPECTOR LEVEL II (General) (RTO/QA7) Course at RuaneTATI,
Kemasik, Kemaman, Terengganu, Malaysia.

Page 2 of 9
Jan 2004 to present :
In-house training for ASNT Level II course in Ultrasonic Testing, Magnetic Particle,
Dye Penetrant Testing, Radiography Testing, at Intestmal Corporation Training
Room, Puchong Selangor, Malaysia, conducted by qualified Level III and Senior
Inspector.

4. EXPERIENCE SUMMARY

Over 5 years plus professional inspection experience in the petroleum refining,


petroleum gas, chemical process and electrical power generation industries.
Extensive experience performing API 510 inspections on pressure vessels, boiler,
furnace, reactor, tank, piping, welding and structural, including data reports, re-rates,
hydrostatic test, pneumatic test, PQR's, WPS's, welder qualification, NDE (ultrasonic,
magnetic particle, dye penetrant, holiday testing, hardness testing, vacuum box
testing, and etc), fabrication, installation and repairs as per relevant code and standard
(ASME, API, AWS or PTS).

Other inspection experience includes vendor surveillance, plant corrosion survey, RBI
inspections, smallbore inspection program, piping corrosion survey and etc which
along with being computer literate- report writing, report reviewing and data input.
Also, familiar with plant shutdown, preparation/planner plant turnaround and plant
maintenance. Involved in repair activity with approved procedure.

Local (Malaysian Plant):


Petronas Penapisan (Melaka) Sdn. Bhd. (PPMSB), Petronas Penapisan (Terengganu)
Sdn. Bhd. (PPTSB), Petronas Fertilizer (Kedah) Sdn. Bhd. (PFKSB), MTBE Sdn.
Bhd., PDH Sdn. Bhd., BASF Sdn. Bhd., Toray Sdn. Bhd., Vinyl Chloride Malaysia
Sdn. Bhd. (VCMSB), Optimal Chemical Sdn. Bhd., Ethelyne Sdn. Bhd., MCOT Sdn.
Bhd., ESSO Malaysia Berhad Port Dickson Refinary, TNB Janamanjung Sdn. Bhd.
and Malaysia LNG Sdn. Bhd. (MLNG).

International Plant:
Bharat Petroleum Corporation Limited, Mumbai India.

5. WORKING EXPERIENCES

Date : 11 May 2009 until present


Company : CARE ION TECHNOLOGIST SDN. BHD.
Kerteh, Terengganu.
Position : Third Party Supervisor (TPS)
Scope work : Seconded to Optimal Chemical Sdn. Bhd. as Third Party
Supervisor (TPS) during Turnaround 2009. To supervise
and review all inspection activity such as visual inspection,
NDT and advance NDT. Also to comply a dosshier
documentation that related to this turnaround.

Page 3 of 9
Date : 22 April 2009 – 05 May 2009
Company : S.E.M INSPECTION SDN. BHD.
Seremban, Negeri Sembilan.
Position : Authorized Static Equipment Inspector (API 510)
Scope work : Seconded to Malaysia LNG Sdn. Bhd. as an Static Equipment
Inspector to perform visual inspection during Module 8
Shutdown 2009.

Date : 04 March 2009 – 02 April 2009


Company : ESP (ASIA) PVT.LTD.
CBD Belapur, Mumbai, India.
Position : Authorized Static Equipment Inspector (API 510)
Scope work : Seconded to Bharat Petroleum Corporation Limited, Mumbai
India as an inspector to perform visual inspection during RMP
Plant Shutdown 2009.

Company : iTC SKILLS DEVELOPMENT SDN BHD


Date join : 21 February 2008 until 28 February 2009
Position : Trainer / Facilitator cum Technical Executive

Scope of work :
• As a trainer for company to conduct several course/training organized by ITC.
• Prepared facilities such as computer, course note, multimedia, and souvenir and
also do reservation for room training if conducted outside, such as hotel and etc.
• Prepared a material for course/training notes organized by ITC
• Prepared a material for practical training and examination such as sample/test
piece (pipe, plate and etc).
• Prepared a material for assessment such as quiz, tutorial and examination that
comply with a standard or certificate organization.
• Managing the marketing of courses/training organized by ITC and creates a
related brochure.
• Attend course/training for upgrading personal competency.
• Revision a courses/training notes, slide presentation and assessment.
• To organise all type of courses to fulfil requirements of the oil, gas and
Petrochemical industries related to engineering inspection and maintenance
activities.

Course/Training organized or conducted:

19-24 January 2009


Conducted a Liquid Penetrant Testing Level I course for new trainees that was held at
ITC training room, Puchong, Selangor.

8-12 September 2008


Organized the ASME VIII New Vessel Construction Code course that was held at Concorde Hotel
Shah Alam, Selangor.

Page 4 of 9
1-5 September 2008
Organized the API RP 579 Fitness For Services course that was held at Concorde
Hotel Shah Alam, Selangor.

4-10 August 2008


Organized the API 653 Aboveground Storage Tank Inspection and Design course that
was held at Concorde Hotel Shah Alam, Selangor.

10-14 March 2008


Conducted a Magnetic Particle Testing Level I and Level II course that was held at
ITC training room, Puchong, Selangor

25-29 February 2008


Conducted a Liquid Penetrant Testing Level I and Level II course that was held at
ITC training room, Puchong, Selangor

Technical Project Involved:

February 2009
Seconded to Petronas Fertilizer (Kedah) Sdn. Bhd. As Authorized Static Equipment
Inspector (API 510) during fabrication column repair. To perform visual inspection,
monitor welding and fabrication activity, witnessed Non-Destructive Testing and
making/reviewed report accordingly.

January – February 2009


Seconded to MTBE Sdn. Bhd. Gebeng Kuantan as Authorized Static Equipment
Inspector (API 510) during emergency shutdown. To perform visual inspection on
vessel, heat exchanger, drum and filter. Also monitored welding activity during repair
work as per approved procedure.

December 2008 – January 2009


Seconded to Petronas Fertilizer (Kedah) Sdn Bhd as Authorized Static Equipment
Inspector (API 510). To perform visual inspection on plant corrosion survey for plant
Ammonia, Urea, Utility and Urea Export Terminal.

October - November 2008


Seconded to BASF Chemical Sdn. Bhd. as Authorized Static Equipment Inspector
(API 510) during TORAY Shutdown 2008. To perform visual inspection and review
all report (NDT and visual inspection).

October 2008
Seconded to Petronas Fertilizer (Kedah) Sdn Bhd as Authorized Static Equipment
Inspector (API 510) during emergency shutdown.

June 2008
Seconded to Vinyl Chloride Malaysia Sdn Bhd as Authorized Static Equipment
Inspector (API 510) during VCMSB Reactor Shutdown 2008. To perform visual
inspection on external and internal reactor and monitor repair activity.

Page 5 of 9
April 2008
Seconded to Petronas Fertilizer (Kedah) Sdn Bhd as Authorized Static Equipment
Inspector (API 510) during April Emergency Shutdown 2008. To perform visual
inspection and witness leak test (pneumatic & hydrotest).

Company : INTESTMAL CORPORATION SDN BHD


Date join : 12 Jan 2004 until 20 February 2008
Position : Technical Executive / Plant Inspector

Scope of work :
• To performed NDT activities such as Ultrasonic Flaw Detection Testing,
Ultrasonic Thickness Measurement, Magnetic Particle Inspection, Red Dye
Penetrant Inspection, Videoscopic Inspection and Hardness Testing for various
assignment.
• Assigned as Welding Inspector to monitor all welding activities before, during and
after welding for several projects involved.
• To witness welder test (WQT), hydro testing, leak testing, post weld heat
treatment (PWHT) and material verification.
• To participate on preparation of final documentation, welding summary and filing
of close-up reports in accordance to client reporting and documentation system.
• To perform report presentation session to client representative upon completion of
works and brief on inspection finding and raise of technical recommendation.
• To perform visual inspection on pressure vessel, piping, boiler, furnace, heater,
reactor and etc as Authorized Inspector.
• To perform plant survey / corrosion survey including painting maintenance.

Project Involved:

February 2007- February 2008


Seconded to Petronas Penapisan (Melaka) Sdn Bhd as Visual Inspector cum Plant
Inspector (API 510) during Smallbore Inspection and Risk Based inspection Project.

January 2007
Seconded to Petronas Penapisan Melaka Sdn Bhd as Static Equipment Inspector
(API 510) during PSR-1 PPMSB Turnaround 2007.

July - December 2006


Seconded to Petronas Penapisan (Melaka) Sdn Bhd as Visual Inspector cum Plant
Inspector (API 510) during Smallbore Inspection and Risk Based inspection Project.

June 2006
Seconded to Vinyl Chloride Malaysia Sdn Bhd as Static Equipment Inspector (API
510) during VCMSB Turnaround 2006.

February – May 2006


Seconded to Petronas Penapisan (Melaka) Sdn Bhd as Visual Inspector cum Plant Inspector during
Smallbore Inspection and Risk Based inspection Project.

Page 6 of 9
January 2006
Seconded to Petronas Penapisan (Melaka) Sdn Bhd as NDT Technician. To
performed Boroscope Inspection activities.

Seconded to Esso Malaysia Berhad as NDT Technician. To perform Dye Penetrant


Inspection activities at Port Dickson Refinery.

Dec 2005
Seconded to Petronas Penapisan (Melaka) Sdn Bhd as Static Equipment Inspector
cum Visual Inspector during Small Bore Project.

Nov 2005
Seconded to Syarikat Bersaudara Lutong as NDT Technician. To perform Vacuum
Box Testing at Miri Crude Oil Terminal (MCOT).

Sept – Nov 2005


Seconded to Esso Malaysia Berhad as NDT Technician. To perform Magnetic
Particle Inspection, Dye Penetrant Inspection and UT Thickness Measurement
activities at Port Dickson Refinery (PDR).

August 2005
Seconded to Petronas Penapisan (Melaka) Sdn Bhd as Static Equipment Inspector
cum Visual Inspector during Small Bore Project.

July 2005
Seconded to Petronas Fertilizer (Kedah) Sdn Bhd as Static Equipment Inspector
during PFKSB Turnaround 2005, Gurun, Kedah. To perform internal and external
inspection activities on static equipment and others related equipment.

June – July 2005


Seconded to Optimal Chemical (M) Sdn Bhd as Plant/Static Equipment Inspector
during Optimal Emergency Shutdown. To perform internal and external inspection
on static equipment and other related equipment.

June – July 2005


Seconded to Optimal Chemical (M) Sdn Bhd as Plant/Static Equipment Inspector
during Optimal Emergency Shutdown. To perform internal and external inspection
on static equipment and furnace box

April – May 2005


Seconded to Petronas Penapisan (Terengganu) Sdn Bhd as Static Equipment
Inspector during PP(T)SB Turnaround 2005. To perform internal and external
inspection on static equipment and other related equipment.

March 2005 to April 2005


Seconded to MTBE (M) Sdn Bhd as NDT Technician during MTBE Turnaround
2005. To perform Dye Penetrant Inspection activities as per client request during
turnaround.

Page 7 of 9
Jan – March 2005
Seconded to Petronas Penapisan (Melaka) Sdn Bhd as NDT Technician during
maintenance work at PPMSB Plant. To perform Magnetic Particle Inspection, Dye
Penetrant Inspection and UT Thickness Gauging.

Dec 2004 to Jan 2005


Seconded to MTBE (M) Sdn Bhd as NDT Technician during Mini Shutdown 2004.
To perform Dye Penetrant Inspection activities as per client request.

Sept – Dec 2004


Seconded to Esso Malaysia Berhad as NDT Technician during Esso Turnaround
2004. To perform Magnetic Particle Inspection, Dye Penetrant Inspection
and UT Thickness Measurement activities at Port Dickson Refinery
(PDR).

Seconded to Nam Fatt Fabricate as NDT Technician during project CIQ Passenger
Hall Phase I. To perform Magnetic Particle Inspection and Hardness Test activities.

Seconded to Petronas Fertilizer Kedah Sdn Bhd as NDT Technician during PFK
July 2004 Shutdown. To perform Dye Penetrant Inspection activities at PFK Gurun
Plant.

Seconded to Nam Fatt Fabricate as NDT Technician during project CIQ Roof
Structure. To perform Magnetic Particle Inspection and Dye Penetrant Inspection
activities.

August to September 2004


Seconded to Petronas Methanol Labuan as QC/Welding Inspector during PML
Turnaround 2004. To perform inspection activities and to monitor
welding activities on static equipment and other related associate pipings
at PML Plant, Labuan.

July 2004
Seconded to Perwaja Steel Sdn Bhd as Static Equipment Inspector during SMS
Annual Shutdown 2004. To perform internal and external visual
inspection activities on piping, static equipment and other related
equipment.

June 2004
Seconded to Mets One Sdn Bhd as NDT Technician during Boiler repair at Plantani
Food Supp. Sdn Bhd. To perform UT Thickness Measurement activities
and collecting thickness measurement data.

Seconded to TMM Engineering Sdn Bhd as NDT Technician during Serdang Lateral
Pipeline project. To perform Magnetic Particle Inspection activities at
Putrajaya.

May 2004
Seconded to TNB Jana Manjung as Static Equipment Inspection during Equipment
Inspection for RBI Project. To perform external and internal inspection activities on
static equipment and other related equipment as per client request.

Page 8 of 9
April 2004
Seconded to Petronas Penapisan Melaka Sdn Bhd as NDT Inspector during PPMSB
Phase 3 Turnaround 2004.

5. REFERENCE

Tuan Haji Huzeir Bin Abdul Halim


Managing Director
iTC Skills Development Sdn.Bhd.
Tel: +6013-483 3005

Tuan Haji Bahari Bin Abdul Hamid


Managing Director
Intestmal Corporation Sdn.Bhd.
Tel: +6013-391 6005; Office: +603-80624181
No.12 Jalan Utama 1/14
Taman Perindustrian Puchong Utama
47140 Puchong Selangor, Malaysia

Page 9 of 9

You might also like