Control Charts
Control Charts
14
12
10
0
1 2 3 4 5
Need for Control Charts
Time
Need for Control Charts (contd.)
Time
Stability
Time
Stability and Capability
Time
Definitions
Sampling method
Subgroup Size
Subgroup Frequency
Number of Subgroups
Data types and Control Charts
Data type Control Chart
LCL= X A2 R
Carry out homogenisation
Plot the range and the average pair for each subgroup
46.986
46.984
46.982
46.98
46.978
46.976
46.974
46.972
46.97
46.968
46.966
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Av erage Chart
46.9800
UCL
46.9780
Mean
46.9760
LCL
46.9740
Range Chart
46.9720
0.01
0.009
UCL
0.008
0.007
0.006
0.005
Mean
0.004
0.003
0.002
0.001
LCL
0
10
12
13
17
18
19
14
15
16
11
1
Sample number
Out of control patterns
UCL
UCL
CL
A run of 7 points above
or below mean
LCL
Out of control patterns (contd.)
UCL
7 Points increasing or
CL
decreasing
LCL
UCL
CL
Non- random pattern
LCL
Pre- Control Chart
NOMINAL Traditional:
LSL PC LINE PC LINE USL 1. Establish pre-control
limits from the nominal and
specification limits, by
dividing the tolerance into 4
equal bands
Red Yellow Green Green Yellow Red
.07 .86 .07
Note: When the Cpk = 1,
approximately 86% of the
values will fall within 1/2 of
1/2
TOLERANCE the tolerance.
TOLERANCE
Pre-Control Rules
2. Determine Process Capability by taking 5 consecutive parts ( 2 units each). All
must fall within the green zone to decide the process is capable, in control and
“qualified”
6
Process variation is
equal to design
tolerance (6 = T)
Process variation is
less than design
tolerance (6 < T)
(Cpk)
USL X X LSL
Cpk Minimum of ,
3 3
Control chart - Defectives
Shift Date Shift Qty. Produced cracked
S No.(i) ni di
1 8/16/95 A 5000 48
2 8/16/95 B 4000 35
3 8/16/95 C 4000 18
4 8/17/95 A 4500 20
5 8/17/95 B 4000 27
6 8/17/95 C 3500 25
7 8/18/95 A 4100 37
8 8/18/95 B 3900 32
9 8/18/95 C 4000 21
10 8/19/95 A 4500 13
11 8/19/95 B 4500 43
12 8/19/95 C 4000 28
13 8/21/95 A 4700 46
14 8/21/95 B 4700 33
15 8/21/95 C 4600 51
16 8/22/95 A 4000 57
17 8/22/95 B 4500 28
18 8/22/95 C 4500 27
19 8/23/95 A 4300 44
20 8/23/95 B 4700 47
21 8/23/95 C 4000 33
22 8/24/95 A 4300 31
23 8/24/95 B 4600 38
24 8/24/95 C 4600 37
total 103500 819
‘p’ chart calculations
p (1 p )
LCL p 3
n1
0.0079(1 0.0079)
0.0079 3
5000
0.00415
p (1 p )
UCL p 3
n1
0.0079(1 0.0079)
0.0079 3
5000
0.0116
Date Shift ni di pi LCL UCL
8/16/95 A 5000 48 0.00960 0.00415 0.01167
8/16/95 B 4000 35 0.00875 0.00371 0.01212
8/16/95 C 4000 18 0.00450 0.00371 0.01212
8/17/95 A 4500 20 0.00444 0.00395 0.01188
8/17/95 B 4000 27 0.00675 0.00371 0.01212
8/17/95 C 3500 25 0.00714 0.00342 0.01241
8/18/95 A 4100 37 0.00902 0.00376 0.01206
8/18/95 B 3900 32 0.00821 0.00366 0.01217
8/18/95 C 4000 21 0.00525 0.00371 0.01212
8/19/95 A 4500 13 0.00289 0.00395 0.01188
8/19/95 B 4500 43 0.00956 0.00395 0.01188
8/19/95 C 4000 28 0.00700 0.00371 0.01212
8/21/95 A 4700 46 0.00979 0.00404 0.01179
8/21/95 B 4700 33 0.00702 0.00404 0.01179
8/21/95 C 4600 51 0.01109 0.00399 0.01183
8/22/95 A 4000 57 0.01425 0.00371 0.01212
8/22/95 B 4500 28 0.00622 0.00395 0.01188
8/22/95 C 4500 27 0.00600 0.00395 0.01188
8/23/95 A 4300 44 0.01023 0.00386 0.01197
8/23/95 B 4700 47 0.01000 0.00404 0.01179
8/23/95 C 4000 33 0.00825 0.00371 0.01212
8/24/95 A 4300 31 0.00721 0.00386 0.01197
8/24/95 B 4600 38 0.00826 0.00399 0.01183
8/24/95 C 4600 37 0.00804 0.00399 0.01183
‘p’ chart
0.01600
0.01400
UCL
0.01200
0.01000
0.00800
p ave.
0.00600
0.00400
LCL
0.00200
0.00000
A B C A B C A B C A B C A B C A B C A B C A B C
8/16/95
8/16/95
8/16/95
8/17/95
8/17/95
8/17/95
8/18/95
8/18/95
8/18/95
8/19/95
8/19/95
8/19/95
8/21/95
8/21/95
8/21/95
8/22/95
8/22/95
8/22/95
8/23/95
8/23/95
8/23/95
8/24/95
8/24/95
8/24/95
Control chart formulae
Chart Central Line LCL UCL
X-R
R R D3 R D4 R
X X X A2 R X A2 R
‘np’ np np 3 np 1 p np 3 np 1 p
‘p’ p p 1 p p 1 p
p 3 p3
n n
c
‘c’ c 3 c c 3 c
‘u’ u u u
u 3 u 3
ni ni