Field Inspection & Test Plan

This document outlines an inspection and test plan for pipeline construction with 12 steps. Key steps include inspecting materials for quality, verifying welder qualifications and procedures, non-destructive testing of welds, pressure testing pipelines, and final inspections of installed components and painting. The plan assigns responsibility for inspections to the client representative, third party inspector, and contractor's quality control personnel at various hold points, witness points, and surveillance inspections.

Uploaded by

Egbert A. Ogolo
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
324 views2 pages

Field Inspection & Test Plan

This document outlines an inspection and test plan for pipeline construction with 12 steps. Key steps include inspecting materials for quality, verifying welder qualifications and procedures, non-destructive testing of welds, pressure testing pipelines, and final inspections of installed components and painting. The plan assigns responsibility for inspections to the client representative, third party inspector, and contractor's quality control personnel at various hold points, witness points, and surveillance inspections.

Uploaded by

Egbert A. Ogolo
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

INSPECTION AND TEST PLAN

Activity Activity Description Inspection/Test Requirements Reference Document Contract QC. 3rd Party Client Remark
No. Rep. Rep.
1.0 Inspection of Materials
• Visual and dimensional checks of pipes
H S

and fittings (diameters, Joints beveling as


applicable), to ensure materials procured for
flowline works are of Specific standard
2.0 Verify welder qualified, and correct WPSs used
• Check welder qualification I.D. against qualified H S

welder list

• Check weld procedure table


3.0 Weld Joint Preparation
• Verify as per approved WPS. H S

4.0 Welding of Pipes and fittings


• Visual inspection of completed welds P S

5.0 NDE. (RT) of Joints


• Verify NDE as per spec. W P R

6.0 Tie-in welds of section carried out


• Verify Joint alignment, fitup and pre-heat as P W

applicable.

• Verify welder Qualification and WPS


• Verify Inspect completed weld joints
7.0 NDE of Tie-in Joints Completed Verify NDE as per spec. W P R
8.0 Pressure Testing Verify Pressure testing as per spec. W P W
9.0 Inspection of excess materials Check materials and documentation. Return excess P W
materials to ware house
10.0 Installation of Spool Pieces Check for correct alignment of items installed P W
11.0 Installation of Valves Check for correct alignment of Valves P W
12.0 Painting of Pipes & others Verify Painting as per SPEC P W

Legend: S= Surveillance Inspection W= Witness Inspection Point H= Mandatory Hold Point for Inspection R= Record Review P= Perform