NHPC PPT Final

NHPC Ltd is India's largest hydro power company, incorporated in 1975. It has developed 14 power stations with a total installed capacity of 5,295 MW. The company has 4.6 GW of capacity under construction and plans to increase capacity by 80% to 9.4 GW by 2013. NHPC is headquartered in Faridabad, Haryana with various plants located across India. It has over 5,000 employees and is led by a Chairman and Managing Director along with other Directors. Key success factors include achieving high standards in project execution and operations while being environmentally and socially responsible.

Uploaded by

kapil_kaif
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views

NHPC PPT Final

NHPC Ltd is India's largest hydro power company, incorporated in 1975. It has developed 14 power stations with a total installed capacity of 5,295 MW. The company has 4.6 GW of capacity under construction and plans to increase capacity by 80% to 9.4 GW by 2013. NHPC is headquartered in Faridabad, Haryana with various plants located across India. It has over 5,000 employees and is led by a Chairman and Managing Director along with other Directors. Key success factors include achieving high standards in project execution and operations while being environmentally and socially responsible.

Uploaded by

kapil_kaif
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 15

Highlights

Company Name
NHPC Limited
SUBMITTED BY :
KAPIL SHARMA
MBA - M&S

1
Table of contents
 Executive Summary  Operational Profile
Highlights  Background  Products /Services /Solutions
 History, Year of Incorporation  Business Lines
& other details  Awards and Ratings
 Evolution of Edelweiss
 Behind the LOGO  Financial Summary
 Demographics
 Location, Branches, Employee  Key Success Factors
details  Company Initiatives & Strategy
 Legal structure
 Corporate Structure
 Organizational Structure
 Leadership, Organizational
chart

2
Executive summary
NHPC Ltd has been incorporated in 1975 and is the largest hydro power
company in INDIA.
Highlights
It has developed and constructed 14 power stations and its total current
installed capacity is 5295 MW.

Established track record in implementing hydro electric projects

The company has 4.6 GW capacity under construction

NHPC is set to increase capacity by80 percent from 5.1 GW in 09 to 9.4


GW by 2013.

3
Background
Year of Incorporation & Other details
NHPC was Incorporated in 1975.

NHPC Limited, formerly known as National Hydroelectric Power


Highlights Corporation Ltd has been confered as MINI RATNA Category-I by
Government of India in 2008-09.

1985 - 86 Hydro Power Training Institute set up at the Baira Siul


hydroelectric project to train operators and supervisory staff

1987 - 88 Establishment of a satellite telecommunication network


taken up to link various projects of our Company

1994 - 95 Awarded the lining work of Jawahar Tunnel in Jammu &


Kashmir

2000 – 01 NHPC and the government of Madhya Pradesh entered into


an MoU to exploit the hydro electric potential of the Narmada basin by
completing the Indira Sagar and Omkareshwar projects .

2009-10 Incorporation of a joint venture company, National High


Power Test Laboratory Private Limited, along with NTPC, Powergrid
4 Corporation of India Limited and Damodar Valley Corporation.
Demographics
Location, Branches, Employee details
Registered & Corporate Office :

Highlights NHPC Office Complex Sector-33 Faridabad – 121003 Haryana - India


Phone : 2278421 Fax : 2277941
Email : [email protected]

Factory/plant

Teesta-V Plant: P.O. Singtam, East Sikkim - Sikkim – India

Dhauliganga-I Plant: Post Box No.1, Tapovan, Dharchula,


Dist. Pithoragarh - Uttaranchal – India

Chamera-II Plant: Karian Dist. Chamba - 176310


Himachal Pradesh - India

5
EMPLOYEE DETAILS
Name Current Position
Highlights

A.B.L Srivastava Executive Chairman of the Board, Finance


Director, Managing Director

D.K RAY Chief Executive Officer of LDHCL

VIJAY GUPTA Compliance Officer, Company Secretary

D. P. Bhargava Director - Technical, Executive Director

R. S. Mina Director - Personnel, Executive Director

J. K. Sharma Director - Projects, Executive Director

6 6
Organizational Structure
Leadership

Shri S.K. Garg, (DIN : 00055651) 59 years, is our Chairman and


Managing Director.
Highlights
Shri A.B.L. Srivastava, (DIN : 01601682) 55 years, is our Director
(Finance).

Shri D.P. Bhargava, (DIN : 01277269) 53 years, is our Director


(Technical).

Shri J.K. Sharma, (DIN : 00387785) 52 years, is our Director


(Projects).

Shri R.S. Mina, (DIN : 00149956) 53 years, is our Director (Personnel).

Shri Rakesh Jain, (DIN : 02682574) (Official part time Director).

Shri Sudhir Kumar (DIN : 02669103) (Official part time Director)

Smt. Komal Anand, (DIN : 01909263) (Independent Director),

7
Operational Profile
Major Products/ Business Lines

Highlights

Power Station State Capacity (MW) Year ofCommission

Baira Siul Himachal Pradesh 180 1981

Loktak Manipur 105 1983

Tanakpur Uttarakhand 120 1992

Dulhasti Jammu & Kashmir 390 2007

Indira Sagar Madhya Pradesh 1000 2005

8
Financial Summary
Financial Year ends at March 31
Highlights
Qtry Fin 06/09 09/09 12/09 03/10

Revenue 1060 1195 1213 750

PAT 502 617 582 390

EPS 0.4 0.5 0.5 0.3

All figures in Rs. crores except for per share data


Qtry fig. shows standalone results

9 Source:
• FINANCIAL 2009-10 2008-09 2007-08 2006-07

Highlights
• Sales ** 4218.90 2671.85 2243.73 1754.12

• Miscellaneous 673.19 589.64 911.77 433.38

• PBIT , 3892.41 2201.76 2201.93 1610.04


depreciation & tax

• PAT & 2402.08 1178.34 1146.65 1087.74


depreciation

• Dividend 676.54 325.00 300.00 278.00

• Reserves 10972.45 6798.13 6093.34 5367.05

10 & surplus (cumulative) 10


Key Success Factors
Achieve International standards of excellence in all aspect of hydro power.
Highlights
Execute and operate projects in a cost effective, environment friendly and
socio economic responsive manner

Adopt best practise of corporate governance.

Maximize creation of wealth through generation of internal funds and


effective management of resources.

By fostering competent, trained and multiple disciplinary human capital.

11
Key Risk
Highlights
• Execution Delay: Hydro-power projects typically require a long
gestation period and substantial capital outlays before completion

or before positive cash flows can be generated .

• Border Disputes with China

12 12
Company Initiatives & Strategy 

Highlights
NHPC is set to increase its global footprint through successful
consultancy assignments, including project execution

This achievement is an outcome of NHPC performance


in all aspects:-
• planning,
•consultancy or human resources.
• enhanced IT capabilities and
•network.

NHPC continuous process of growth in performance has enabled them


to enhance our business leadership. Even as NHPC meet targets for
better performance, NHPC never lose sight of our commitment to ethics
and betterment of society

13
Corporate Social Responsibility 

Highlights

Provide Employment.

Provide electricity in rural areas.

Plant more trees .

Provide basic education system in rural areas.

Special measure for tribals

Development of public health centre, school, community centre etc

14
Highlights

Thank You

15 15