Software Testing Quiz Questions and Answers
Software Testing Quiz Questions and Answers
a) Functional Testing
b) Stress/Load Testing
c) Recovery Testing
d) Integration Testing
Show Answer
55) Maintenance Plan predicts the maintenance requirements of the
system, maintenance costs and effort required
a) True
b) False
Show Answer
56) Beta testing will be done by
a) Developer
b) User
c) Tester
Show Answer
57) Validation plan describes the approach ,resources and schedule used
for system validation
a) True
b) False
Show Answer
58) Integration, It will come under
a) CMM Level 1
b) CMM Level 3
c) CMM Level 2
d) None
Show Answer
59) Types of quality tools are Problem Identification
Tools and Problem Analysis Tools.
a) True
b) False
Show Answer
60) Which Software Development Life cycle model will require to start
Testing Activities when starting development activities itself
a) Water falls model
b) Spiral Model
c) V-model
d) Linear model
Show Answer
61) A metric used to measure the characteristic of the methods,
Techniques and tools employed in developing, implementing and
maintaining the software system called as
a) Process metric
b) Product Metric
c) Test metrics
Show Answer
62) Check Sheet(Checklist) is considered a simple , but powerful
statistical tool because it differentiates between two extremes.
a) True
b) False
Show Answer
63) Application should be stable. Clear Design and Flow of the application
is needed for Automation testing.
a) False
b) True
Show Answer
64) Quality plan describes the quality procedures and standards that will
be used in a project.
a) False
b) True
Show Answer
65) How severely the bug is effecting the application is called as
a) Severity
b) Priority
c) Fix ability
d) Traceability
Show Answer
66) Project Risk affects The Schedule or Resources.
a) True
b) False
Show Answer
67) The name of the testing which is done to make sure the existing
features are not affected by new changes
a) Recursive testing
b) Whitebox testing
c) Unit testing
d) Regression testing
Show Answer
68) Management and Measurement, It will come under
a) CMM Level 1
b) CMM Level 3
c) CMM Level 4
d) CMM Level 2
Show Answer
69) AdHoc testing is a part of
a) Unit Testing
b) Regression Tesing
c) Exploratory Testing
d) Performance Testing
Show Answer
70) Cost of Production = Right The First time cost(RTF) + Cost of
Quality.
a) True
b) False
Show Answer
71) ------------- means under what test environment(Hardware, software set
up) the application will run smoothly
a) Test Bed
b) Checkpoint
c) Code Walk through
d) Checklist
Show Answer
72) TQM represents
a) Tool Quality Management
b) Test Quality Manager
c) Total Quality Management
d) Total Quality Manager
Show Answer
73) Optimization, Defect Prevention, and Quality Control. Its come under
the
a) CMM Level 2
b) CMM Level 3
c) CMM Level 4
d) CMM Level5
Show Answer
74) Unit Testing will be done by
a) Testers
b) End Users
c) Customer
d) Developers
Show Answer
75) Beta testing will be done at
a) User place
b) Developers place
Show Answer
76) A Plan to overcome the risk called as
a) Migration Plan
b) Master plan
c) Maintenance plan
d) Mitigation Plan
Show Answer
77) Splitting project into tasks and estimate time and resources required to
complete each task called as Project Scheduling
a) True
b) False
Show Answer
Answers
(10)
(1) d (2) b (3) a (4) b (5) a (6) a (7) b (8) a (9) b
d
(11) (12) (13) (14) (15) (16) (17) (18) (19) (20)
a b c c a b a b a c
(21) (22) (23) (24) (25) (26) (27) (28) (29) (30)
a c b a a a a d d a
(31) (32) (33) (34) (35) (36) (37) (38) (39) (40)
b c c a a a a b a b
(41) (42) (43) (44) (45) (46) (47) (48) (49) (50)
a c c b a b a c a b
(51) (52) (53) (54) (55) (56) (57) (58) (59) (60)
a d b b a b a b a c
(61) (62) (63) (64) (65) (66) (67) (68) (69) (70)
a a b b a a d c c a
(71) (72) (73) (74) (75) (76) (77)
a c d d a d a