SIPOC Diagram For E Library Project
SIPOC Diagram For E Library Project
PROCESS
INFRASTRUCTU CONTENT LIBRARY
RE SET UP ACQUISITION MANAGEMENT
OUTPUT CUSTOMER AND CUSTOMER
REQUIREMENTS
A ready to go computer system Stakeholdersand Organizers of the
for hosting the e library library, the content acquistion team.
The disk space should be enough to
hold the current content and near
future possible needs
All the possible material relevant Library Management team.
to the discipline of operations The content should be easily be
management and the sub divisible into streams of operations like
disciplines SCM, PM, SOM, TQM etc.
Placement of tags for each unit Deployement Team. A full fledged
material in appropriate folder. portable digital library
Completely prepared Central
Database with each material
appropriately tagged
PROCESS
DEPLOYMENT MAINTENANCE