0% found this document useful (0 votes)
135 views1 page

Substation Area

This document compares the space requirements for a package power station versus a utility electricity substation. A package power station with 9 modules, each with 4 generators of 11MVA capacity, would occupy 360,000 square meters and provide 396MVA of power. In contrast, a utility electricity substation with a single 600MVA capacity would require only 42,000 square meters of space.

Uploaded by

Namki Lee
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
135 views1 page

Substation Area

This document compares the space requirements for a package power station versus a utility electricity substation. A package power station with 9 modules, each with 4 generators of 11MVA capacity, would occupy 360,000 square meters and provide 396MVA of power. In contrast, a utility electricity substation with a single 600MVA capacity would require only 42,000 square meters of space.

Uploaded by

Namki Lee
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Power Generation / Substation Area Comparison

Package Power Station Utility Electricity

11MVA 11MVA 11MVA 11MVA 10,000sqm 600MVA 12,000sqm

11MVA 11MVA 11MVA 11MVA

11MVA 11MVA 11MVA 11MVA 200MVA 10,000sqm

11MVA 11MVA 11MVA 11MVA 200MVA

11MVA 11MVA 11MVA 11MVA 200MVA

11MVA 11MVA 11MVA 11MVA

11MVA 11MVA 11MVA 11MVA

11MVA 11MVA 11MVA 11MVA

11MVA 11MVA 11MVA 11MVA

11MVA * 9 * 4 = 396 MVA 600 MVA

10,000 * 9 * 4 = 360,000 sqm 12,000 + 30,000 = 42,000 sqm