Flowchart - Item Master

Drawing is pushed into the documentum by draftsmen and marked as complete. If approved, the drawing is viewable to those with access to documentum. If rejected, the draftsmen are notified with rejection reasons. Approved drawings have item codes created in MRPII, linking the drawing to BOMs, sales orders, and the production planning system.

Uploaded by

Ramdas Bhujbal
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
341 views

Flowchart - Item Master

Drawing is pushed into the documentum by draftsmen and marked as complete. If approved, the drawing is viewable to those with access to documentum. If rejected, the draftsmen are notified with rejection reasons. Approved drawings have item codes created in MRPII, linking the drawing to BOMs, sales orders, and the production planning system.

Uploaded by

Ramdas Bhujbal
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

START

Drawing is pushed into the


documentum by draftsmen and
drawing marked as complete.

DOCUMENTUM

Notification is generated in the


inbox of the approver

Notification is sent to the N Drawing


respective draftsmen with
remarks stating the reason approve
for rejection d?

Y
Drawing is viewable to all who
have an access to documentum

MRPII Item codes are created for


Chk in Y all GA & component
MRPII if drawing no. BOM is
Item created in MRPII based on
code GA the parent code
exists

N
Once the BOM is exploded
into the MRPII, as per the
N SO, all the items are
N
Is drawing Drawing linked to the SO and the
present in details BOM is prepared on the
Documentu not in MRP system.
m MRPII

Y
Y BOM once created is
checked , BOM is then
released to planning and
production
Check with IT team and Creation of Item Code for
resolve component, parts and GA

END