0% found this document useful (0 votes)
175 views

Template Process FMEA

This document is a potential failure mode and effects analysis (FMEA) for an unnamed process. It lists a potential failure mode of copper tubes blocking due to burrs. The potential effect is the compressor may blast, which is critical. A possible cause is lack of blade sharpening at fixed intervals for deburring. It provides columns to track the severity, occurrence, detection rating, recommended actions and completion dates to address any failure modes.

Uploaded by

Bittu
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
175 views

Template Process FMEA

This document is a potential failure mode and effects analysis (FMEA) for an unnamed process. It lists a potential failure mode of copper tubes blocking due to burrs. The potential effect is the compressor may blast, which is critical. A possible cause is lack of blade sharpening at fixed intervals for deburring. It provides columns to track the severity, occurrence, detection rating, recommended actions and completion dates to address any failure modes.

Uploaded by

Bittu
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

POTENTIAL

FAILURE MODE AND EFFECT ANALYSIS


(PROCESS FMEA)

FMEA No. : FMEA/


Process
Item : : Page : of
responsibility

Model year(s) / : Prepared by : Approved by :

Core Team : Key date : FMEA Date (Orig.) : Rev. :

C O D Action Results
Process Potential Responsibility
S L c e R.
number / Potential Potential Effect(s) of Causes(s) / and Target
e A c Current Process Control t P. Recommended Action(s) S O D R.
functions / Failure Mode Failure Mechanism (s) of Completion
v S u e N. Actions Taken e c e P.
Requirements Failure Date
S r c v c t N.

14
Automated m/c Automated m/c 10 2 7
0
Compressor may
Copper tube may Crit 7
burr 10 blast
block ical Blade sharpening req at fixed
interval

deburring

You might also like