Brochure
Brochure
BUILT UP
APPROXIMATE PT
S.No PROJECT NAME AREA STRUCTURAL DISCRIPTION
COST (Rs)
(Sq.ft)
COMMERCIAL BUILDINGS:
BUILT UP
APPROXIMATE PT
S.No PROJECT NAME AREA STRUCTURAL DISCRIPTION
COST (Rs)
(Sq.ft)
BUILT UP
APPROXIMATE PT
S.No PROJECT NAME AREA STRUCTURAL DISCRIPTION
COST (Rs)
(Sq.ft)
BUILT UP
APPROXIMATE PT
S.No PROJECT NAME AREA STRUCTURAL DISCRIPTION
COST (Rs)
(Sq.ft)
BUILT UP
APPROXIMATE PT
S.No PROJECT NAME AREA STRUCTURAL DISCRIPTION
COST (Rs)
(Sq.ft)
INDUSTRIAL BUILDINGS:
BUILT UP
APPROXIMATE PT
S.No PROJECT NAME AREA STRUCTURAL DISCRIPTION
COST (Rs)
(Sq.ft)
BUILT UP
APPROXIMATE PT
S.No PROJECT NAME AREA STRUCTURAL DISCRIPTION
COST (Rs)
(Sq.ft)
Cellar+Ground+4Floors
66 DOLLFINE ESTATES 1,50,000 Max. Span 30'-0" both ways 50 lakhs
for Kalyani Constructions Flat Plate System
2 2
Miyapur, HYDERABAD LL: 2 kN/m SDL: 2.5 kN/m
BUILT UP
APPROXIMATE PT
S.No PROJECT NAME AREA STRUCTURAL DISCRIPTION
COST (Rs)
(Sq.ft)
BUILT UP APPROXIMATE
S.No PROJECT NAME STRUCTURAL DISCRIPTION
AREA (Sq.ft) PT COST (Rs)
3 BASEMENTS + E-DECK
Proposed Car park basements and e-deck 20,00,000 Max. Span 35'-0"
3 for LANCO HILLS, MANI KONDA Flat Slab System 12 cr
at HYDERABAD LL: 5 kN/m2 SDL: 2 kN/m2
2
LL: 30 kN/m for e-deck
Proposed 15 storey office Building at Hitech City 2,50,000 3 Basements + Ground+ 15 Floors
6 for Mahavir Constructions. Max. Span 35'-0" 1.1 cr
at HYDERABAD Beam Slab System
LL: 4 kN/m2 SDL: 2 kN/m2
BUILT UP APPROXIMATE
S.No PROJECT NAME STRUCTURAL DISCRIPTION
AREA (Sq.ft) PT COST (Rs)
BUILT UP APPROXIMATE
S.No PROJECT NAME STRUCTURAL DISCRIPTION
AREA (Sq.ft) PT COST (Rs)
BUILT UP APPROXIMATE
S.No PROJECT NAME STRUCTURAL DISCRIPTION
AREA (Sq.ft) PT COST (Rs)
INSTITUTIONAL BUILDINGS:
BUILT UP APPROXIMATE
S.No PROJECT NAME STRUCTURAL DISCRIPTION
AREA (Sq.ft) PT COST (Rs)
INDUSTRIAL BUILDINGS:
RESIDENTIAL BUILDINGS: