Student Logbook Manual
Student Logbook Manual
Objective:
The main objective of using this project log book is to identify and develop student
learning processes, and to keep a record of his/her effort and results related to the final
year project (FYP) planning and tasks undertaken. The information in which student
include into the log book should reflect the objectives of the FYP, i.e. this log book is not
solely a record but is a means of securing action and planning forward.
Logbook Preparation:
i. Each student doing final year project is required to have and to use a dark color hard
cover type book of minimum size of 30 x 20cm. There is no limitation on the number of
pages but it is advised that a 200-400 pages notebook should be suffice to cover both
FYP I and FYP II.
ii. On the front cover of the logbook, student are required to paste a standard FYP Cover
Form (refer Form A). Students are encouraged to use a plastic laminate/film to protect
their logbook front and back cover.
iii. Paste Form B at the backside of the logbook front cover. Paste Form C to Form F
and FYP Flowchart(s) to the subsequent pages of the logbook. Leave a blank page after
FYP I Flowchart iStudents are encouraged to paste the 2010-2011 Calendar and FYP
Monthly Planner(s) in their respective logbook. This will help them in terms of
organizing their FYP (I and II) tasks.
iv. Students are required to fill Form G1-G14 (compulsory) for every weekly meeting
with their respective FYP supervisor(s). Failure to comply will leads to Logbook marks
reduction. Each Form G(s) should be endorsed according to allocated week. For
example; Form G1 must be endorsed by the supervisor within Week 1 of the academic
semester. It is advised that the students paste the Form G immediately after obtaining the
supervisor’s signature to avoid any inconveniences (lost form, conflict of information
jotted in the following weeks, etc).
v. At the end of FYP I Week 8 and Week 16, students must submit the required Progress
Report(s) to their respective supervisor in the given format (refer Form H1 and H2). For
FYP II Week 7 and Week 14, students must submit the required Progress Report to their
respective supervisor in the given format (refer Form I1 and I2).
vi. Students are also required to present their logbook to the examiners during FYP
seminar. Failure to comply will lead to further Logbook & Examiner(s) marks reduction
General Expectations:
i. Students are encouraged to jot down at least 5-6 pages of thoughtful entries per week in
support of a quality design/work process.
ii. A project log book is a complete record of everything that a student has done for
his/her project which includes:
Record the date on each page. Start each day on a new page. Keep a record of the
time you spend on each step of your project. One easy way to do this is to note the
time you started and the time you finished each activity in your log book.
Label each entry and record this in a table of contents (reserve 3-4 pages at start).
Use ink. Do not erase. Delete an entry by neatly drawing a single line through it.
Avoid backfilling. If you realize later that you left something out, or just want to
summarize something, go ahead and write it in, noting that it’s after-the-fact.
Include everything that contributes to the progress of the FYP tasks… good, bad,
and ugly.
An internet search What key information did I find? How does it help
achieve the project objectives?
Are there other sources that should be pursued?
What new questions were generated?
-FORM A-
This final year project (FYP) logbook will record the progress of the
student, from the commencement of research until completion of the
project.
The supervisor and student are required to retain logbooks and record
each meeting regarding the progress of research.
The logbook is an official record of contacts between the student and the
supervisor(s). It must be produced at end of each seminar presentations as
proof of work done and must be available for review at any stage during
the year as appropriate.
________________________________________________________________________________________________
________________________________________________________________________________________________
FINAL YEAR PROJECT GANTT CHART
(PROJECT TITLE)
Example of Gantt Chart of FYP Activities (Please modify according to your own preferences)
2
3
4
5
-FORM D-
6
No. Planned Milestone Planned Achieved Actual
Milestone *(Yes/No) Completion
Date Date
(month/year)
M1
M2
M3
M4
-FORM E-
M5
M2
M3
M4
M5
Coordination
Literature Review Meeting for
Focused Group Interview Literature Review
& Questionnaire
Development
Development of
Instruments
Coordination with
CDC & Test Item
Questionnaire
Writers
Literacy Tests
Numeracy Test
Review of Instruments
Assess Content & Construct Validity of Instruments
Coordination Meeting
for Sampling & Logistics
Sampling Pertaining to Pilot Study
Pilot Study
Data Analysis
Assess Reliability & Construct Validity of Instruments
Coordination Meeting
Revision of Items for Revision of
(Tests and Questionnaire) Instruments, Conduct of
Main Study, and Data
Analysis
Main Study
Coordination Meeting
Data Analysis for Reporting of
Results &
Dissemination of
Findings
Report Writing & Dissemination of Findings
-CALENDER-
YEAR 2011
S M T W T F S S M T W T F S S M T W T F S S M T W T F S
JANUARY 1 FEBRUARY MARCH APRIL
2 3 4 5 6 7 8 1 2 3 4 5 1 2 3 4 5 1 2
9 10 11 12 13 14 15 6 7 8 9 10 11 12 6 7 8 9 10 11 12 3 4 5 6 7 8 9
16 17 18 19 20 21 22 13 14 15 16 17 18 19 13 14 15 16 17 18 19 10 11 12 13 14 15 16
23 24 25 26 27 28 29 20 21 22 23 24 25 26 20 21 22 23 24 25 26 17 18 19 20 21 22 23
30 31 27 28 27 28 29 30 31 24 25 26 27 28 29 30
Start FYP 1
WK 1 to WK 8 WK 1 to WK 2
Student prepare Proposal Student FYP 1 Briefing
draft to Supervisor by FYP COD
WK 8 WK 9 to WK 12
WK 11
Student submit Complete Supervisor assess proposal
Supervisor submit 20%
Proposal to Supervisor & P.R 1 & P.R 1. Evaluate 20%
marks to FYP COD
Marks
WK 11 to WK 17 WK 10 to WK 12
Student start Preliminary Supervisor return
Results/Data work & corrected proposal and
Update Proposal declare marks to student
WK 14 to WK 16 WK 14 to WK 15
Student submit to WK 14 to WK 15
FYP COD present Students
Supervisor FYP 1 Report Supervisor to approve
P.R 1 marks & FYP 1 Examiner
draft student FYP Seminar List + Schedule to FYP COMM
eligibility to FYP COMM
WK 16
Student submit Final FYP 1 Report WK 15 to WK 16
& P.R 2 to Supervisor. FYP COD publish FYP 1
Student submit Final Report to FYP Examiners List & Schedule
Examiners to Student
WK 17 to WK 21
WK 17 to WK 21
Supervisor (60%) and
FYP 1 Seminar
Examiners (40%) submit FYP 1
marks to FYP COD
WK 18 to WK 21
FYP COD present student
100% marks to FYP COMM.
Moderation of marks
WK 21 to WK 22
End FYP 1 FYP COD submit FYP 1 marks
to SERENDIT/Faculty
Abbreviations:
FYP COD - Final Year Project Coordinator WK - Week
FYP COMM - Final Year Project Committees P.R - Progress Report
-FYP FLOWCHART-
Start FYP II
WK 1 to WK 7 WK 1 to WK 2
Student continues/perform task according Student FYP II Briefing
to stated methodologies & start by FYP COD
FYP II Report writing according to given
format
WK 7
WK 8 to WK 10 WK 11
Student submit P.R 1
Supervisor assess P.R 1. Supervisor submit 20%
to Supervisor
Evaluate 20% Marks marks to FYP COD
WK 8 to WK 14 WK 11
Student finalizing FYP II Supervisor declare
work (obtain result, analyze, marks to student
interpret & conclude)
WK 12 to WK 13
FYP COD present Students
WK 10 to WK 13 WK 12 to WK 13
P.R 1 marks & FYP 1 Examiner
Student submit to Supervisor to approve
List + Schedule to FYP COMM
Supervisor FYP II Full student FYP II Seminar
Report draft eligibility to FYP COMM
WK 14
WK 14
FYP COD publish FYP II
Student submit Final FYP II Report Examiners List & Schedule
& P.R 2 to Supervisor. to Student
Student submit Final FYP II Report
to FYP Examiners
WK 15 to WK 19
WK 15 to WK 19
FYP II Seminar
WK 17 to WK 22 Supervisor (60%) and
Student to submit hard cover Examiners (40%) submit
bound FYP II Report + CD to FYP II marks to FYP COD
FYP COD
WK 16 to WK 20
FYP COD present student
100% marks to FYP COMM.
Moderation of marks
WK 21 to WK 22
End FYP II FYP COD submit FYP II marks
to SERENDIT/Faculty
Abbreviations:
FYP COD - Final Year Project Coordinator WK - Week
FYP COMM - Final Year Project Committees P.R - Progress Report
July 2010 FYP I Planner
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
-FYP PLANNER-
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
January 2011 FYP II Planner
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
-FORM G1-
WEEK 1 MEETINGS
DATE:
MATERIAL SUBMITTED:
Supervisor’s Date:
Signature & Chop:
-FORM G2-
WEEK 2 MEETINGS
DATE:
MATERIAL SUBMITTED:
Supervisor’s Date:
Signature & Chop:
-FORM G3-
WEEK 3 MEETINGS
DATE:
MATERIAL SUBMITTED:
Supervisor’s Date:
Signature & Chop:
-FORM G4-
WEEK 4 MEETINGS
DATE:
MATERIAL SUBMITTED:
Supervisor’s Date:
-FORM G5-
Signature & Chop:
WEEK 5 MEETINGS
DATE:
PROGRESS SINCE LAST MEETING:
MATERIAL SUBMITTED:
Supervisor’s Date:
Signature & Chop: -FORM G6-
WEEK 6 MEETINGS
DATE:
Supervisor’s Date:
Signature & Chop: -FORM G7-
WEEK 7 MEETINGS
DATE:
Supervisor’s Date:
Signature & Chop:
-FORM H1-
WEEK 8 MEETINGS
DATE:
MATERIAL SUBMITTED:
Supervisor’s Date:
Signature & Chop:
-FORM G9-
WEEK 10 MEETINGS
DATE:
MATERIAL SUBMITTED:
Supervisor’s Date:
Signature & Chop:
-FORM G10-
WEEK 11 MEETINGS
DATE:
PROGRESS SINCE LAST MEETING:
MATERIAL SUBMITTED:
Supervisor’s Date:
-FORM G11-
Signature & Chop:
WEEK 12 MEETINGS
DATE:
Supervisor’s Date:
Signature & Chop:
-FORM G12-
WEEK 13 MEETINGS
DATE:
Supervisor’s Date:
-FORM G13-
Signature & Chop:
WEEK 14 MEETINGS
DATE:
Supervisor’s Date:
-FORM G14-
Signature & Chop:
WEEK 15 MEETINGS
DATE:
Supervisor’s Date:
Signature & Chop:
-FORM H2-
WEEK 1 MEETINGS
DATE:
MATERIAL SUBMITTED:
Supervisor’s Date:
Signature & Chop:
-FORM G2-
WEEK 2 MEETINGS
DATE:
MATERIAL SUBMITTED:
Supervisor’s Date:
Signature & Chop:
-FORM G3-
WEEK 3 MEETINGS
DATE:
MATERIAL SUBMITTED:
Supervisor’s Date:
Signature & Chop:
-FORM G4-
WEEK 4 MEETINGS
DATE:
MATERIAL SUBMITTED:
Supervisor’s Date:
-FORM G5-
Signature & Chop:
WEEK 5 MEETINGS
DATE:
PROGRESS SINCE LAST MEETING:
MATERIAL SUBMITTED:
Supervisor’s Date:
Signature & Chop:
-FORM G6-
WEEK 6 MEETINGS
DATE:
PROGRESS SINCE LAST MEETING:
MATERIAL SUBMITTED:
Supervisor’s Date:
Signature & Chop: -FORM G7-
WEEK 7 MEETINGS
DATE:
Supervisor’s Date:
Signature & Chop:
-FORM H1-
1. PERFORMANCE DETAILS
WEEK 8 MEETINGS
DATE:
MATERIAL SUBMITTED:
Supervisor’s Date:
Signature & Chop:
-FORM G9-
WEEK 10 MEETINGS
DATE:
MATERIAL SUBMITTED:
Supervisor’s Date:
Signature & Chop:
-FORM G10-
WEEK 11 MEETINGS
DATE:
PROGRESS SINCE LAST MEETING:
MATERIAL SUBMITTED:
Supervisor’s Date:
-FORM G11-
Signature & Chop:
WEEK 12 MEETINGS
DATE:
Supervisor’s Date:
Signature & Chop:
-FORM G12-
WEEK 13 MEETINGS
DATE:
Supervisor’s Date:
-FORM G13-
Signature & Chop:
WEEK 14 MEETINGS
DATE:
Supervisor’s Date:
-FORM G14-
Signature & Chop:
WEEK 15 MEETINGS
DATE:
Supervisor’s Date:
Signature & Chop:
-FORM H2-
1. PERFORMANCE DETAILS
Work Done/Action Status Comments/Justifications/Remarks/Things
(%) Learned
1. Results
2. Analysis
3. Engineering
Calculations
4. .......................
5. Conclusion
-FORM H2-