This document provides guidelines for students' final year project logbooks. Students are required to keep a logbook to document their planning, tasks, meetings with supervisors, progress reports, and other details related to their final year project. The logbook should be a hardcover notebook of at least 200 pages. It must include cover sheets with project details, forms to record weekly supervisor meetings, progress reports to submit after certain weeks, and a Gantt chart laying out the project plan and timeline. Students are expected to make thorough weekly entries in the logbook and present it during seminars and to examiners.

Uploaded by

Mohd Irfan
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (6 votes)
5K views

Student Logbook Manual

This document provides guidelines for students' final year project logbooks. Students are required to keep a logbook to document their planning, tasks, meetings with supervisors, progress reports, and other details related to their final year project. The logbook should be a hardcover notebook of at least 200 pages. It must include cover sheets with project details, forms to record weekly supervisor meetings, progress reports to submit after certain weeks, and a Gantt chart laying out the project plan and timeline. Students are expected to make thorough weekly entries in the logbook and present it during seminars and to examiners.

Uploaded by

Mohd Irfan
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 61

FINAL YEAR PROJECT (EMT 4752/EMT4754) LOGBOOK

Objective:
The main objective of using this project log book is to identify and develop student
learning processes, and to keep a record of his/her effort and results related to the final
year project (FYP) planning and tasks undertaken. The information in which student
include into the log book should reflect the objectives of the FYP, i.e. this log book is not
solely a record but is a means of securing action and planning forward.

Logbook Preparation:
i. Each student doing final year project is required to have and to use a dark color hard
cover type book of minimum size of 30 x 20cm. There is no limitation on the number of
pages but it is advised that a 200-400 pages notebook should be suffice to cover both
FYP I and FYP II.

ii. On the front cover of the logbook, student are required to paste a standard FYP Cover
Form (refer Form A). Students are encouraged to use a plastic laminate/film to protect
their logbook front and back cover.

iii. Paste Form B at the backside of the logbook front cover. Paste Form C to Form F
and FYP Flowchart(s) to the subsequent pages of the logbook. Leave a blank page after
FYP I Flowchart iStudents are encouraged to paste the 2010-2011 Calendar and FYP
Monthly Planner(s) in their respective logbook. This will help them in terms of
organizing their FYP (I and II) tasks.

iv. Students are required to fill Form G1-G14 (compulsory) for every weekly meeting
with their respective FYP supervisor(s). Failure to comply will leads to Logbook marks
reduction. Each Form G(s) should be endorsed according to allocated week. For
example; Form G1 must be endorsed by the supervisor within Week 1 of the academic
semester. It is advised that the students paste the Form G immediately after obtaining the
supervisor’s signature to avoid any inconveniences (lost form, conflict of information
jotted in the following weeks, etc).

v. At the end of FYP I Week 8 and Week 16, students must submit the required Progress
Report(s) to their respective supervisor in the given format (refer Form H1 and H2). For
FYP II Week 7 and Week 14, students must submit the required Progress Report to their
respective supervisor in the given format (refer Form I1 and I2).

vi. Students are also required to present their logbook to the examiners during FYP
seminar. Failure to comply will lead to further Logbook & Examiner(s) marks reduction

General Expectations:
i. Students are encouraged to jot down at least 5-6 pages of thoughtful entries per week in
support of a quality design/work process.

ii. A project log book is a complete record of everything that a student has done for
his/her project which includes:

Sketches/doodling Problem needs/requirements Design process


Class notes Project objectives Rationale for decisions
Meeting notes Action Items Project reflections
Half-baked Ideas Math calculations Professional development
Work-in-progress Design alternatives etc, whatever……….
Vendor notes Research findings
Sources of ideas Evaluation of data/results
Design reviews Decision criteria
Basic Logbook Writing Procedures:

 Record the date on each page. Start each day on a new page. Keep a record of the
time you spend on each step of your project. One easy way to do this is to note the
time you started and the time you finished each activity in your log book.

 Label each entry and record this in a table of contents (reserve 3-4 pages at start).

 Use ink. Do not erase. Delete an entry by neatly drawing a single line through it.

 Do not remove pages, and do not skip pages.

 Avoid backfilling. If you realize later that you left something out, or just want to
summarize something, go ahead and write it in, noting that it’s after-the-fact.

 Include everything that contributes to the progress of the FYP tasks… good, bad,
and ugly.

 If new information/source are in the form of loose sheets/paper/notes, paste them


inside the logbook and record the date properly on the pages. If the source is
larger, fold and paste neatly into the logbook page.
Tips for FYP logbook entry:

If you just finished… Ask yourself…


A meeting,  What were the main outcomes of the meeting?
 Was the meeting productive, and why?
 What are your personal action items before the next
meeting?
 Is the project heading in the right direction?

Brainstorming,  Which ideas seem most feasible, and why?


 Are there enough good ideas?
 How could better ideas be developed based on this
session?

Engineering Analysis,  What were the governing equations?


 What were the most important findings?
 What do the results mean and how should they be
applied?

Visualization,  What are the major features/discoveries and why are


(by hand or in these significant?
CAD/CAE or from  What was learned about the problem or solution
visual source) possibilities?
 What problems were resolved and what still needs to
be addressed?
 How does this piece integrate with the whole?

An internet search  What key information did I find? How does it help
achieve the project objectives?
 Are there other sources that should be pursued?
 What new questions were generated?
-FORM A-

FINAL YEAR PROJECT


LOGBOOK EMT 4752/EMT4754
DEPARTMENT OF MECHANICAL ENGINEERING, UPNM

Student : Mohd Hazwan bin Burhanuddin

Supervisor(s) : Zulkiffli bin Abd. Kadir

Project Title : Chassis System for Formula Varsity Racing Car


Student Logbook

This final year project (FYP) logbook will record the progress of the
student, from the commencement of research until completion of the
project.

The supervisor and student are required to retain logbooks and record
each meeting regarding the progress of research.

The logbook is an official record of contacts between the student and the
supervisor(s). It must be produced at end of each seminar presentations as
proof of work done and must be available for review at any stage during
the year as appropriate.

FYP commencement date : ______________________________

FYP completion date : __________________________________________

Student contact number : 013-3090063

Student e-mail address : [email protected]

Supervisor(s) contact number(s): 019-6571988


-FORM C-

WORKING TITLES OF FINAL YEAR PROJECT

Title (1): ___________________________________________________________________________________


_______________________________________________________ Date: _______________________

Title (2): ___________________________________________________________________________________


_______________________________________________________ Date: _______________________

Title (3): ___________________________________________________________________________________


_______________________________________________________ Date: _______________________

Title (4): ___________________________________________________________________________________


_______________________________________________________ Date: _______________________

Title (5): ___________________________________________________________________________________


_______________________________________________________ Date: _______________________

Final Title: ________________________________________________________________________________


________________________________________________________________________________________________

________________________________________________________________________________________________

________________________________________________________________________________________________
FINAL YEAR PROJECT GANTT CHART
(PROJECT TITLE)
Example of Gantt Chart of FYP Activities (Please modify according to your own preferences)

  Year SEMESTER 1 2010/2011


  Project Activities/Objectives W W W W W W W W W W1 W1 W1 W1 W1 W1 W1 W1 W1
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8
1                                  

2                                    

3                                    

4                                    

5                                    
-FORM D-
6

                                   
No. Planned Milestone Planned Achieved Actual
Milestone *(Yes/No) Completion
Date Date
(month/year)
M1

M2

M3

M4
-FORM E-
M5

FYP Milestones Date:


No. Planned Milestone Planned Achieved Actual
Milestone *(Yes/No) Completion
Date Date
(month/year)
M1

M2

M3

M4

M5

(Please modify according to your own preferences)


-FORM F-
FLOW CHART OF FINAL YEAR PROJECT I ACTIVITIES

(Please modify according to your own preferences)

Coordination
Literature Review Meeting for
Focused Group Interview Literature Review
& Questionnaire
Development

Development of
Instruments
Coordination with
CDC & Test Item
 Questionnaire
Writers
 Literacy Tests
 Numeracy Test

Review of Instruments
Assess Content & Construct Validity of Instruments

Coordination Meeting
for Sampling & Logistics
Sampling Pertaining to Pilot Study

Pilot Study

Data Analysis
Assess Reliability & Construct Validity of Instruments

Coordination Meeting
Revision of Items for Revision of
(Tests and Questionnaire) Instruments, Conduct of
Main Study, and Data
Analysis

Main Study

Coordination Meeting
Data Analysis for Reporting of
Results &
Dissemination of
Findings
Report Writing & Dissemination of Findings
-CALENDER-

WORKING CALENDER 2010-2011


YEAR 2010
S M T W T F S S M T W T F S S M T W T F S S M T W T F S
JANUARY 1 2 FEBRUARY MARCH APRIL
3 4 5 6 7 8 9 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3
10 11 12 13 14 15 16 7 8 9 10 11 12 13 7 8 9 10 11 12 13 4 5 6 7 8 9 10
17 18 19 20 21 22 23 14 15 16 17 18 19 20 14 15 16 17 18 19 20 11 12 13 14 15 16 17
24 25 26 27 28 29 30 21 22 23 24 25 26 27 21 22 23 24 25 26 27 18 19 20 21 22 23 24
31 28 28 29 30 31 25 26 27 28 29 30

MAY 1 JUNE JULY AUGUST


2 3 4 5 6 7 8 1 2 3 4 5 1 2 3 1 2 3 4 5 6 7
9 10 11 12 13 14 15 6 7 8 9 10 11 12 4 5 6 7 8 9 10 8 9 10 11 12 13 14
16 17 18 19 20 21 22 13 14 15 16 17 18 19 11 12 13 14 15 16 17 15 16 17 18 19 20 21
23 24 25 26 27 28 29 20 21 22 23 24 25 26 18 19 20 21 22 23 24 22 23 24 25 26 27 28
30 31 27 28 29 30 25 26 27 28 29 30 31 29 30 31

SEPTEMBER OCTOBER 1 2 NOVEMBER DECEMBER


1 2 3 4 3 4 5 6 7 8 9 1 2 3 4 5 6 1 2 3 4
5 6 7 8 9 10 11 10 11 12 13 14 15 16 7 8 9 10 11 12 13 5 6 7 8 9 10 11
12 13 14 15 16 17 18 17 18 19 20 21 22 23 14 15 16 17 18 19 20 12 13 14 15 16 17 18
19 20 21 22 23 24 25 24 25 26 27 28 29 30 21 22 23 24 25 26 27 19 20 21 22 23 24 25
26 27 28 29 30 31 28 29 30 26 27 28 29 30 31

YEAR 2011
S M T W T F S S M T W T F S S M T W T F S S M T W T F S
JANUARY 1 FEBRUARY MARCH APRIL
2 3 4 5 6 7 8 1 2 3 4 5 1 2 3 4 5 1 2
9 10 11 12 13 14 15 6 7 8 9 10 11 12 6 7 8 9 10 11 12 3 4 5 6 7 8 9
16 17 18 19 20 21 22 13 14 15 16 17 18 19 13 14 15 16 17 18 19 10 11 12 13 14 15 16
23 24 25 26 27 28 29 20 21 22 23 24 25 26 20 21 22 23 24 25 26 17 18 19 20 21 22 23
30 31 27 28 27 28 29 30 31 24 25 26 27 28 29 30

MAY JUNE JULY 1 2 AUGUST


1 2 3 4 5 6 7 1 2 3 4 3 4 5 6 7 8 9 1 2 3 4 5 6
8 9 10 11 12 13 14 5 6 7 8 9 10 11 10 11 12 13 14 15 16 7 8 9 10 11 12 13
15 16 17 18 19 20 21 12 13 14 15 16 17 18 17 18 19 20 21 22 23 14 15 16 17 18 19 20
22 23 24 25 26 27 28 19 20 21 22 23 24 25 24 25 26 27 28 29 30 21 22 23 24 25 26 27
29 30 31 26 27 28 29 30 31 28 29 30 31

SEPTEMBER OCTOBER 1 NOVEMBER DECEMBER


1 2 3 2 3 4 5 6 7 8 1 2 3 4 5 1 2 3
4 5 6 7 8 9 10 9 10 11 12 13 14 15 6 7 8 9 10 11 12 4 5 6 7 8 9 10
11 12 13 14 15 16 17 16 17 18 19 20 21 22 13 14 15 16 17 18 19 11 12 13 14 15 16 17
18 19 20 21 22 23 24 23 24 25 26 27 28 29 20 21 22 23 24 25 26 18 19 20 21 22 23 24
25 26 27 28 29 30 30 31 27 28 29 30 25 26 27 28 29 30 31
EMT 4752 FYP-FYP FLOWCHART-
I FLOWCHART

Start FYP 1

WK 1 to WK 8 WK 1 to WK 2
Student prepare Proposal Student FYP 1 Briefing
draft to Supervisor by FYP COD

WK 8 WK 9 to WK 12
WK 11
Student submit Complete Supervisor assess proposal
Supervisor submit 20%
Proposal to Supervisor & P.R 1 & P.R 1. Evaluate 20%
marks to FYP COD
Marks

WK 11 to WK 17 WK 10 to WK 12
Student start Preliminary Supervisor return
Results/Data work & corrected proposal and
Update Proposal declare marks to student

WK 14 to WK 16 WK 14 to WK 15
Student submit to WK 14 to WK 15
FYP COD present Students
Supervisor FYP 1 Report Supervisor to approve
P.R 1 marks & FYP 1 Examiner
draft student FYP Seminar List + Schedule to FYP COMM
eligibility to FYP COMM

WK 16
Student submit Final FYP 1 Report WK 15 to WK 16
& P.R 2 to Supervisor. FYP COD publish FYP 1
Student submit Final Report to FYP Examiners List & Schedule
Examiners to Student

WK 17 to WK 21
WK 17 to WK 21
Supervisor (60%) and
FYP 1 Seminar
Examiners (40%) submit FYP 1
marks to FYP COD

WK 18 to WK 21
FYP COD present student
100% marks to FYP COMM.
Moderation of marks

WK 21 to WK 22
End FYP 1 FYP COD submit FYP 1 marks
to SERENDIT/Faculty

Abbreviations:
FYP COD - Final Year Project Coordinator WK - Week
FYP COMM - Final Year Project Committees P.R - Progress Report
-FYP FLOWCHART-

EMT 4754 FYP II FLOWCHART

Start FYP II

WK 1 to WK 7 WK 1 to WK 2
Student continues/perform task according Student FYP II Briefing
to stated methodologies & start by FYP COD
FYP II Report writing according to given
format

WK 7
WK 8 to WK 10 WK 11
Student submit P.R 1
Supervisor assess P.R 1. Supervisor submit 20%
to Supervisor
Evaluate 20% Marks marks to FYP COD

WK 8 to WK 14 WK 11
Student finalizing FYP II Supervisor declare
work (obtain result, analyze, marks to student
interpret & conclude)
WK 12 to WK 13
FYP COD present Students
WK 10 to WK 13 WK 12 to WK 13
P.R 1 marks & FYP 1 Examiner
Student submit to Supervisor to approve
List + Schedule to FYP COMM
Supervisor FYP II Full student FYP II Seminar
Report draft eligibility to FYP COMM

WK 14
WK 14
FYP COD publish FYP II
Student submit Final FYP II Report Examiners List & Schedule
& P.R 2 to Supervisor. to Student
Student submit Final FYP II Report
to FYP Examiners

WK 15 to WK 19
WK 15 to WK 19
FYP II Seminar
WK 17 to WK 22 Supervisor (60%) and
Student to submit hard cover Examiners (40%) submit
bound FYP II Report + CD to FYP II marks to FYP COD
FYP COD
WK 16 to WK 20
FYP COD present student
100% marks to FYP COMM.
Moderation of marks

WK 21 to WK 22
End FYP II FYP COD submit FYP II marks
to SERENDIT/Faculty

Abbreviations:
FYP COD - Final Year Project Coordinator WK - Week
FYP COMM - Final Year Project Committees P.R - Progress Report
July 2010 FYP I Planner
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

1 2 3

4 5 6 7 8 9 10

11 12 13 14 15 16 17

18 19 20 21 22 23 24

25 26 27 28 29 30 31

-FYP PLANNER-

August 2010 FYP I Planner


Sunday Monday Tuesday Wednesday Thursday Friday Saturday

1 2 3 4 5 6 7

8 9 10 11 12 13 14

15 16 17 18 19 20 21

22 23 24 25 26 27 28

29 30 31

September 2010 FYP I Planner


Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3 4

5 6 7 8 9 10 11

12 13 14 15 16 17 18

19 20 21 22 23 24 25

26 27 28 29 30

October 2010 FYP I Planner


Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2

3 4 5 6 7 8 9

10 11 12 13 14 15 16

17 18 19 20 21 22 23

24 25 26 27 28 29 30

31

November 2010 FYP I Planner


Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3 4 5 6

7 8 9 10 11 12 13

14 15 16 17 18 19 20

21 22 23 24 25 26 27

28 29 30

December 2010 FYP II Planner


Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3 4

5 6 7 8 9 10 11

12 13 14 15 16 17 18

19 20 21 22 23 24 25

26 27 28 29 30 31
January 2011 FYP II Planner
Sunday Monday Tuesday Wednesday Thursday Friday Saturday

2 3 4 5 6 7 8

9 10 11 12 13 14 15

16 17 18 19 20 21 22

23 24 25 26 27 28 29

30 31

February 2011 FYP I Planner


Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3 4 5

6 7 8 9 10 11 12

13 14 15 16 17 18 19

20 21 22 23 24 25 26

27 28

March 2011 FYP II Planner


Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3 4 5

6 7 8 9 10 11 12

13 14 15 16 17 18 19

20 21 22 23 24 25 26

27 28 29 30 31

April 2011 FYP II Planner


Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2

3 4 5 6 7 8 9

10 11 12 13 14 15 16

17 18 19 20 21 22 23

24 25 26 27 28 29 30

May 2011 FYP II Planner


Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3 4 5 6 7

8 9 10 11 12 13 14

15 16 17 18 19 20 21

22 23 24 25 26 27 28

29 30 31
-FORM G1-

WEEK 1 MEETINGS
DATE:

PROGRESS SINCE LAST MEETING:

MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
Signature & Chop:
-FORM G2-

WEEK 2 MEETINGS
DATE:

PROGRESS SINCE LAST MEETING:

MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
Signature & Chop:

-FORM G3-

WEEK 3 MEETINGS
DATE:

PROGRESS SINCE LAST MEETING:

MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
Signature & Chop:

-FORM G4-

WEEK 4 MEETINGS
DATE:

PROGRESS SINCE LAST MEETING:

MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
-FORM G5-
Signature & Chop:

WEEK 5 MEETINGS
DATE:
PROGRESS SINCE LAST MEETING:

MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
Signature & Chop: -FORM G6-

WEEK 6 MEETINGS
DATE:

PROGRESS SINCE LAST MEETING:


MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
Signature & Chop: -FORM G7-

WEEK 7 MEETINGS
DATE:

PROGRESS SINCE LAST MEETING:


MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
Signature & Chop:
-FORM H1-

1st Progress Report (EMT 4752)

Student’s Name: Mohd Hazwan bin Burhanuddin


Matric #: 2070465 Date:
Project Title:

1. PROPOSAL CHECKLIST (Please submit a complete proposal)


Items Status Comments/Justifications/Remarks
(%) (If Any)
Introduction/Project
Background
Literature Review
Problem Statements
Objectives and Scope of
Work/Limitations
Methodology
Expected Outcomes
Gantt Chart and
Milestones
Estimated Cost (If
Applicable)*
Note * : Not compulsory
-FORM H1-

2. STUDENT'S COMMENTS AND DIFFICULTIES ENCOUNTERED (IF


ANY):

3. ACTIONS/WORKS FOR THE NEXT COMING WEEKS (tentative


dateline for each item).

Student’s Signature Date:


-FORM G8-

WEEK 8 MEETINGS
DATE:

PROGRESS SINCE LAST MEETING:

MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
Signature & Chop:

-FORM G9-

WEEK 10 MEETINGS
DATE:

PROGRESS SINCE LAST MEETING:

MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
Signature & Chop:
-FORM G10-

WEEK 11 MEETINGS
DATE:
PROGRESS SINCE LAST MEETING:

MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
-FORM G11-
Signature & Chop:

WEEK 12 MEETINGS
DATE:

PROGRESS SINCE LAST MEETING:


MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
Signature & Chop:
-FORM G12-

WEEK 13 MEETINGS
DATE:

PROGRESS SINCE LAST MEETING:


MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
-FORM G13-
Signature & Chop:

WEEK 14 MEETINGS
DATE:

PROGRESS SINCE LAST MEETING:


MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
-FORM G14-
Signature & Chop:

WEEK 15 MEETINGS
DATE:

PROGRESS SINCE LAST MEETING:


MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
Signature & Chop:
-FORM H2-

2st Progress Report (EMT 4752)

Student’s Name: Mohd Hazwan bin Burhanuddin


Matric #: 2070465 Date:
Project Title:
1. PERFORMANCE DETAILS (Please submit a complete proposal &
preliminary results/data write-up)

Work Done/Action Status Comments/Justifications/Remarks/Things


(%) Learned
1. Updated Proposal
2. Preliminary data
3. Others
-FORM H2-

2. STUDENT'S COMMENTS AND DIFFICULTIES ENCOUNTERED (IF


ANY):

3. ACTIONS/WORKS FOR FINAL YEAR PROJECT II EMT 4754


(tentative dateline for each item).

Student’s Signature Date:


-FORM G1-

WEEK 1 MEETINGS
DATE:

PROGRESS SINCE LAST MEETING:

MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
Signature & Chop:
-FORM G2-

WEEK 2 MEETINGS
DATE:

PROGRESS SINCE LAST MEETING:

MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
Signature & Chop:

-FORM G3-

WEEK 3 MEETINGS
DATE:

PROGRESS SINCE LAST MEETING:

MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
Signature & Chop:

-FORM G4-

WEEK 4 MEETINGS
DATE:

PROGRESS SINCE LAST MEETING:

MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
-FORM G5-
Signature & Chop:

WEEK 5 MEETINGS
DATE:
PROGRESS SINCE LAST MEETING:

MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
Signature & Chop:
-FORM G6-

WEEK 6 MEETINGS
DATE:
PROGRESS SINCE LAST MEETING:

MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
Signature & Chop: -FORM G7-

WEEK 7 MEETINGS
DATE:

PROGRESS SINCE LAST MEETING:


MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
Signature & Chop:
-FORM H1-

1st Progress Report (EMT 4754)

Student’s Name: Mohd Hazwan bin Burhanuddin


Matric no: 2070465 Date:
Project Title:

1. PERFORMANCE DETAILS

Work Done/Action Status Comments/Justifications/Remarks/Things


(%) Learned
1. Results
2. Analysis
3. Engineering
Calculations
4. Program Code
5. CAD/CAE model
6...............
-FORM H1-

2. STUDENT'S COMMENTS AND DIFFICULTIES ENCOUNTERED (IF


ANY):

3. ACTIONS/WORKS FOR THE NEXT COMING WEEKS (tentative


dateline for each item).

Student’s Signature Date:


-FORM G8-

WEEK 8 MEETINGS
DATE:

PROGRESS SINCE LAST MEETING:

MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
Signature & Chop:

-FORM G9-

WEEK 10 MEETINGS
DATE:

PROGRESS SINCE LAST MEETING:

MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
Signature & Chop:
-FORM G10-

WEEK 11 MEETINGS
DATE:
PROGRESS SINCE LAST MEETING:

MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
-FORM G11-
Signature & Chop:

WEEK 12 MEETINGS
DATE:

PROGRESS SINCE LAST MEETING:


MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
Signature & Chop:
-FORM G12-

WEEK 13 MEETINGS
DATE:

PROGRESS SINCE LAST MEETING:


MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
-FORM G13-
Signature & Chop:

WEEK 14 MEETINGS
DATE:

PROGRESS SINCE LAST MEETING:


MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
-FORM G14-
Signature & Chop:

WEEK 15 MEETINGS
DATE:

PROGRESS SINCE LAST MEETING:


MATERIAL SUBMITTED:

AGREED TASKS/OBJECTIVES FOR NEXT MEETING:

Supervisor’s Date:
Signature & Chop:
-FORM H2-

2st Progress Report (EMT 4752)

Student’s Name: Mohd Hazwan bin Burhanuddin


Matric no : 2070465 Date:
Project Title:

1. PERFORMANCE DETAILS
Work Done/Action Status Comments/Justifications/Remarks/Things
(%) Learned
1. Results
2. Analysis
3. Engineering
Calculations
4. .......................
5. Conclusion
-FORM H2-

2. STUDENT'S COMMENTS AND DIFFICULTIES ENCOUNTERED (IF


ANY):

Student’s Signature Date: