Inspection & Test Plan For Screed Works

This inspection and test plan outlines the quality control process for screed works on the Bluewaters Residential Development project. It details 9 key steps in the process from document review to final inspection. For each step, it identifies the sequence, description, method of inspection, frequency of inspection, and responsibilities of the main contractor, subcontractor, and client. The overall purpose is to ensure compliance with the method statement through inspection and approval checkpoints along the way.

Uploaded by

Ibrahim Mohammed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
1K views2 pages

Inspection & Test Plan For Screed Works

This inspection and test plan outlines the quality control process for screed works on the Bluewaters Residential Development project. It details 9 key steps in the process from document review to final inspection. For each step, it identifies the sequence, description, method of inspection, frequency of inspection, and responsibilities of the main contractor, subcontractor, and client. The overall purpose is to ensure compliance with the method statement through inspection and approval checkpoints along the way.

Uploaded by

Ibrahim Mohammed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Inspection & Test Plan for Screed Works

Project Name

: Bluewaters Residential Development

Client

: Al Shafar General Contracting LLC

Sub-Contractor

: In Out Concepts General Trading LLC

Location

: JBR Dubai

This ITP Accompanies the Method statement:

RESPONSIBI
I/T NO

SEQUENCE OF ACTIVITY

DESCRIPTION

METHOD

Approved shop drawings use

Shopdrawing

Document Review

Once

Check Method Statement

Method Statement

Visual

Once

Material delivery and Approval

Material Inspection

Visual/Site Engr.

Daily

Mock-up Acceptance and Approval

Method Statement

Visual

Once

Surface Preparation

Method Statement

Visual/Site Engr.

Daily

Application of Screed

Inspection Request

Visual/Engineers

per IR

Curing of Screed

Method Statement

Visual/Engineers

Daily

Verification and acceptance

Method Statement

Visual/Engineers

Daily

Final Inspection & monitoring

Inspection Request

Visual/Engineers

per IR

Prepared by:

In-Out Concepts General Trading LLC

Date: May 10, 2016

SUBMITTAL NUMBER

FREQUENCY

SUBCONTRACTOR

MAIN
CONTRACT

A - Hold Point - Work cannot proceed before it is signed off by a specified person from that group
W - Witness Point - The activity or test must be witnessed by the person or organiza
to which it applies
R - Review
O - Obeservation
SD - Shop Drawing
MS - Material Submital
ME - Method Statement
SA - Sub-contractor
Approval

RESPONSIBILITY
MAIN
CONTRACTOR

CLIENT

cannot proceed before it is signed off by a specified person from that group
W - Witness Point - The activity or test must be witnessed by the person or organization

O - Obeservation