Quantity Estimate Store Room Final
Quantity Estimate Store Room Final
4
5
3
1
1
3
1
1
1
m3
m3
m3
m3
m3
m3
m3
7.43
7.98
6.83
7.43
7.98
6.83
9.59
0.75
0.75
0.75
0.75
0.75
0.75
6.9
1.2
1.2
1.2
0.1
0.1
0.1
0.1
3
1
1
9
1
m3
m3
m3
m3
m3
7.43
7.98
6.83
0.35
9.59
0.75
0.75
0.75
0.35
6.9
0.1
0.1
0.1
1.45
0.1
m2
9.59
6.9
3
1
1
m3
m3
m3
5.91
9.5
8.21
0.75
0.75
0.75
0.3
0.3
0.3
3
1
1
m3
m3
m3
6.06
9.35
8.07
0.6
0.6
0.6
0.3
0.3
0.3
3
1
1
m3
m3
m3
6.21
9.2
7.92
0.45
0.45
0.45
0.3
0.3
0.3
3
1
m3
m3
6.36
9.05
0.1
0.1
4.88
4.88
1st Footing
short wall
long wall
long wall
2nd footing
short wall
long wall
long wall
3 rd footing
short wall
long wall
long wall
Above 3 rd footing
short wall
long wall
long wall
Total
8
9
10
10
m3
7.77
0.1
4.88
2
2
m3
m3
3.1
3
0.1
0.1
1.38
3.2
4
1
2
m2
m2
m2
6.36
7.77
9.05
4.88
4.88
4.88
2
2
m2
m2
3.1
3
1.38
3.2
4
1
2
m2
m2
m2
6.36
7.77
9.05
4.88
4.88
4.88
2
2
m2
m2
3.1
3
1.38
3.2
2
2
m3
m2
11.72
3.1
2
2
m2
m2
1.55
3
kg
11.95
kg
20.67
0.1
0.075
1.38
0.69
3.2
11
12
13
8.1
9 kg
4.6
m2
10.13
8.07
m2
7.73
1.2
1
2
m
m2
10.13
10
3.1
3.2
TORE ROOM
Quantity Remarks
15.40
15.40
20.06
7.18
6.15
33.39
16.7175
5.985
5.1225
66.171
94.00
1.67
0.60
0.51
1.60
6.62
11.00
66.17
3.99
2.14
1.85
3.27
1.68
1.45
2.52
1.24
1.07
9.31
4.42
0.53
0.265
3.79
36.73
0.86
1.92
2.78
33.95
124.15
37.92
88.33
250.39
8.56
19.20
27.76
222.64
27.76
124.15
37.92
88.33
250.39
8.56
19.20
27.76
222.64
0.18
8.56
2.14
48.00
129.42
491.12
289.17
327.89
909.71
81.75
9.28
10.13
10.00
19.84
District Rates
Project :- Bharatpur Civil Aviation Office.
Job :- Construction of Visitor's Shed.
S.No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
F/Y :- 2070/71.
Site :- Bharatpur Airport, Chitwan.
Description of items
Unit
Rates
Remarks
Skilled labour
M-day
542.00
Unskilled labour
M-day
379.00
Cement
Kg.
13.20
Rs. 660/50=13.20
White Cement
Kg.
23.75
Rs. 950/40=23.75
Sand
Cum.
1,200.00
Aggregate (5mm to 40 mm)
Cum.
1,450.00
TMT Bar
Kg.
77.00
Binding wire
Kg.
87.00
Bricks
Nos.
10.00
26 gauge coloured CGI
Sqm.
529.67
9460/17.86=478.78
Sheet(Heavy)
(1 Bandle=72'x2'-8"=192.24 Sqft /10.76=17.86 Sqm.)
0.40 mm coloured Plain
Rm.
281.31 1370.00/4.87=281.31
sheet
(1 Pcs.=4ft x 8 ft. =32 Sqft / 2=16.00 Rft /3.28 =4.87 Rm.)
J hook
Nos.
16.25
130/8=16.25
8 mm dia. Nut & bolts
Nos.
18.75
150/8=18.75
Bitumen washer
Nos.
0.30
30/100=0.30
MS Black pipe.
Kg.
76.00
KTM District Rates
MS grill
Kg.
76.00
Black pipe tubular truss
Kg.
120.00
fitting & fixing all complete
works.
MS grill making & fixing all
Kg.
110.00
complete
(1 Sqm. = 21.50 Kg. since 1 Sqft. grill =2.0 Kg.*10.76)
5 mm th. White glass
Sqm.
753.20
Rs. 70 per Sqft.
Wood Primer
Litre
439.00
Readymade Enamel paint
Litre
528.00
Exterial emulsion (weather
coat) paint.
Litre
557.00
KTM District Rates
Rate Analysis
Project :- Bharatpur Civil Aviation Office.
Job :- Construction of Visitor's Shed.
Ref.
Description of item
Unit
:
:
Resources
Level/Type
RAN 2-1.
Earthwork in excavation in Ordinary type of clay & silty soil.
1 Cu. m.
Quantity
Labours : Unskilled
0.70
Ref.
Description of item
Unit
Resources
Level/Type
m.d.
Rate per
Amounts
Total from each
Unit
379.00
265.30
265.30
Add, 3% for Tools & Plants
7.96
Actual rate
273.26
15% contractor's overhead
40.99
Total Amount
314.25
Rate per Cu. m.
314.25
RAN 2-25-ka
Earthwork in filling in layers (each layer 15 cm) with watering and com
including transportation from 10 m.
1 Cu. m.
Quantity
Labours : Unskilled
Unit
0.50
Unit
m.d.
Rate per
Unit
18.75
Amounts
9.38
9.38
Actual rate
15% contractor's overhead
Total Amount
Rate per Cu. m.
9.38
1.41
10.79
10.79
Ref.
RAN 11-15-Ka.
Description of item
Unit
:
:
Dry brick flat soling work with filling the joint by sand.
Resources
Level/Type
10 Sq. m.
Quantity
Labours : Skilled
Unskilled
Materials : Bricks
Sand
0.50
1.00
420.00
0.71
Unit
m.d.
m.d.
Nos.
Cum.
Rate per
Unit
542.00
379.00
10.00
1200.00
Amounts
271.00
379.00
4200.00
852.00
Actual rate
15% contractor's overhead
Total Amount
Rate per sq. m.
Ref.
RAN 5-1-Kha-ii.
Description of item
Unit
:
:
Brick masonary 1:4 C/S motar work by using chimney(Bhatta) made brick.
1 Cum.
Resources
Level/Type
Quantity
Labours : Skilled
Unskilled
Materials : Bricks
Cement
Sand
1.50
2.20
560.00
100.00
0.28
Unit
m.d.
m.d.
Nos.
Kg.
Cum.
Rate per
Unit
542.00
379.00
10.00
13.20
1200.00
813.00
833.80
5600.00
1320.00
336.00
Actual rate
15% contractor's overhead
Total Amount
Rate per cum.
Ref.
RAN 7-2-Gha.
Description of item
Unit
:
:
Resources
Level/Type
1.00
4.00
0.85
320.00
0.445
Unit
m.d.
m.d.
Cum.
Kg.
Cum.
Rate per
Unit
542.00
379.00
1450.00
13.20
1200.00
Amounts
542.00
1516.00
1232.50
4224.00
534.00
Actual rate
15% contractor's overhead
Total Amount
Rate per cu. m.
Ref.
RAN 12-1-Ga.
Description of item
Unit
:
:
Resources
Level/Type
12.00
16.00
538.00
1.46
Unit
m.d.
m.d.
Kg.
Cum.
Rate per
Unit
542.00
379.00
13.20
1200.00
Amounts
6504.00
6064.00
7101.60
1752.00
Actual rate
15% contractor's overhead
Total Amount
Rate per sq. m.
Ref.
RAN 11-20.
Description of item
Unit
:
:
Resources
Level/Type
1646.80
7256.00
8902.80
1335.42
10238.22
10238.22
5990.50
8048.50
1207.28
9255.78
9255.78
100 Sq. m.
Quantity
Labours : Skilled
Unskilled
Materials : Cement
Sand
1 Cu. m.
Quantity
Labours : Skilled
Unskilled
Materials : Aggregate
Cement
Sand
Amounts
10 Sq. m.
Quantity
Unit
Rate per
Unit
Amounts
Labours : Skilled
Unskilled
Materials : Cement
1.00
1.00
53.20
m.d.
m.d.
Kg.
542.00
379.00
13.20
542.00
379.00
702.24
Actual rate
15% contractor's overhead
Total Amount
Rate per sq. m.
921.00
702.24
1623.24
243.49
1866.73
186.67
Ref.
RAN
10-11-Ga.
Supplying
and providing 5 mm thick glass on frame or Chaukosh with necessa
Description of item
Unit
:
:
Resources
Level/Type
Quantity
Labours : Skilled
Unskilled
Materials : 5 mm thick glass
Listy
Nails
0.06
0.006
1.00
Ref.
Description of item
Unit
Resources
Level/Type
Labours : Skilled
Unskilled
Materials : MS black tubular pipe
1 Sqm.
Unit
m.d.
m.d.
Sqm.
LS
LS
Rate per
Unit
0.00
0.00
0.00
300.00
50.00
Amounts
0.00
0.00
0.00
300.00
50.00
Actual rate
15% contractor's overhead
Total Amount
350.00
350.00
52.50
402.50
Similar works.
Providing and fixing of MS black tubular pipe for Post, Rafter & Purlin etc. incl
cutting, plating, welding and necessary painting works all complete.
59.34 Kg.
Quantity
3.00
4.00
59.34
Unit
m.d.
m.d.
Kg.
Rate per
Unit
542.00
379.00
76.00
Amounts
1626.00
1516.00
4509.84
Primer paint
LS
200.00
200.00
Actual rate
15% contractor's overhead
Total Amount
Rate per Kg.
4709.84
7851.84
1177.78
9029.62
152.17
Ref.
RAN 9-1.
Description of item
Unit
:
:
Resources
Level/Type
Quantity
Labours : Skilled
Unskilled
Materials : 26 gauge CGI Sheet
8 mm dia. Nut & bolts
J hook
Bitumen washer
1.10
1.25
12.00
30.00
25.00
55.00
Ref.
Description of item
Unit
:
:
Resources
10 Sq. m.
Level/Type
m.d.
m.d.
Sqm.
Nos.
Nos.
Nos.
Rate per
Unit
542.00
379.00
529.67
18.75
16.25
0.30
Amounts
596.20
473.75
6356.04
562.50
406.25
16.50
Actual rate
15% contractor's overhead
Total Amount
Rate per sq. m.
7341.29
8411.24
1261.69
9672.93
967.29
RAN 13-5.
painting work.
100 Sqm.
9.00
5.00
m.d.
m.d.
Rate per
Unit
542.00
379.00
16.00
Litre
557.00
Quantity
Labours : Skilled
Unskilled
Materials : Exterial emulsion (Weather
coat) paint
Unit
Unit
Amounts
4878.00
1895.00
6773.00
8912.00
Actual rate
15% contractor's overhead
Total Amount
Rate per sq. m.
8912.00
15685.00
2352.75
18037.75
180.38
Ref.
RAN 13-5.
Description of item
Unit
:
:
Supplying and applying two coats of enamel paint over one coat primer works
Resources
Level/Type
Labours : Skilled
Unskilled
Materials : Wood primer
Enamel paint
100 Sq. m.
Quantity
12.00
8.00
8.10
16.00
Unit
m.d.
m.d.
Litre
Litre
Rate per
Unit
542.00
379.00
439.00
528.00
Amounts
6504.00
3032.00
3555.90
8448.00
Actual rate
15% contractor's overhead
Total Amount
Rate per sq. m.
F/Y :- 2070/71.
Site :- Bharatpur Airport, Chitwan.
sand.
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
k.
Remarks
Remarks
Remarks