Quantity Estimate Store Room Final

1. The document provides a quantity estimate for reconstruction of a store room including descriptions of various construction works, quantities of materials required, and unit rates. 2. It includes estimates for earthwork, brick soling, PCC work, brick masonry, plastering, painting, timber work, roofing, and other miscellaneous works. 3. The total estimated cost for reconstruction of the store room is Rs. 909.71 based on the unit rates provided in the document.

Uploaded by

Ujjwal Shrestha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views15 pages

Quantity Estimate Store Room Final

1. The document provides a quantity estimate for reconstruction of a store room including descriptions of various construction works, quantities of materials required, and unit rates. 2. It includes estimates for earthwork, brick soling, PCC work, brick masonry, plastering, painting, timber work, roofing, and other miscellaneous works. 3. The total estimated cost for reconstruction of the store room is Rs. 909.71 based on the unit rates provided in the document.

Uploaded by

Ujjwal Shrestha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 15

SN

4
5

QUANTITY ESTIMATE FOR RECONSTRUCTION OF THE STORE ROOM


Description of Work
No
Unit
L(m)
B(m)
H(m)
Earth work
E/W Filling in BMS soil
1
m3
8.93
6.9
0.25
Total
Earthwork For Excavation
Earth work For walls
short wall
long wall
long wall
Total
Brick Soling work
wall
short wall
long wall
long wall
Brick Soling Work For Floor
Total
1:2:4 PCC WORK
P.C.C. work for wall
short wall
long wall
long wall
P.C.C. work For column base
P.C.C. Work For Floor
Total
Punning work
BRICK WORK
Brick work For wall

3
1
1

3
1
1
1

m3
m3
m3

m3
m3
m3
m3

7.43
7.98
6.83

7.43
7.98
6.83
9.59

0.75
0.75
0.75

0.75
0.75
0.75
6.9

1.2
1.2
1.2

0.1
0.1
0.1
0.1

3
1
1
9
1

m3
m3
m3
m3
m3

7.43
7.98
6.83
0.35
9.59

0.75
0.75
0.75
0.35
6.9

0.1
0.1
0.1
1.45
0.1

m2

9.59

6.9

3
1
1

m3
m3
m3

5.91
9.5
8.21

0.75
0.75
0.75

0.3
0.3
0.3

3
1
1

m3
m3
m3

6.06
9.35
8.07

0.6
0.6
0.6

0.3
0.3
0.3

3
1
1

m3
m3
m3

6.21
9.2
7.92

0.45
0.45
0.45

0.3
0.3
0.3

3
1

m3
m3

6.36
9.05

0.1
0.1

4.88
4.88

1st Footing
short wall
long wall
long wall

2nd footing
short wall
long wall
long wall

3 rd footing
short wall
long wall
long wall

Above 3 rd footing
short wall
long wall

long wall
Total

8
9
10

10

Deduction for the Shutter


and back ward opening
long wall Back ward
long wall Front
Sub total
Total
Plaster Work
Plaster work For wall
short wall
long wall Back ward
long wall Front
Total
Deduction for the Shutter
and back ward opening
long wall Back ward
long wall Front
Sub total
Total
Painting work
Painting work For wall
short wall
long wall Back ward
long wall Front
Total
Deduction for the Shutter
and back ward opening
long wall Back ward
long wall Front
Sub total
Total
Timber Work
window frame
Window glaze panel
Enamel painting
For window
For rolling shutter
Truss (6.8 M Span)

m3

7.77

0.1

4.88

2
2

m3
m3

3.1
3

0.1
0.1

1.38
3.2

4
1
2

m2
m2
m2

6.36
7.77
9.05

4.88
4.88
4.88

2
2

m2
m2

3.1
3

1.38
3.2

4
1
2

m2
m2
m2

6.36
7.77
9.05

4.88
4.88
4.88

2
2

m2
m2

3.1
3

1.38
3.2

2
2

m3
m2

11.72
3.1

2
2

m2
m2

1.55
3

Weight of 2" (48.3 mm) Ext


dia.)medium Tubular bar truss
outer member

kg

11.95

Weight of 3" Heavy (65 mm


Ext.Dia.)Tubular bar truss inner
members

kg

20.67

0.1

0.075
1.38
0.69
3.2

11
12

13

Weight of 2" (48.3 mm) Ext


dia.)medium Tubular bar for
purlin
Weight of 4" Heavy (100 mm
Ext.Dia.)Tubular bar truss
Total
Roof Covering
C.G.I. Sheet 26 Gauge
Commercial
C.G.I. Sheet 26 Gauge
Commercial for vertical side
Truss cover
C.G.I Plane Sheet 28 Gauge
gutter
for
rainHDPE
waterPIPE
disposal
110 MM
DIA
4
kg/cm2 for Draining Gutter
outlet
Rolling shutter

8.1

9 kg

4.6

m2

10.13

8.07

m2

7.73

1.2

1
2

m
m2

10.13
10
3.1

3.2

TORE ROOM
Quantity Remarks
15.40
15.40

20.06
7.18
6.15
33.39

16.7175
5.985
5.1225
66.171
94.00

1.67
0.60
0.51
1.60
6.62
11.00
66.17

3.99
2.14
1.85
3.27
1.68
1.45
2.52
1.24
1.07
9.31
4.42

0.53
0.265

3.79
36.73

0.86
1.92
2.78
33.95

124.15
37.92
88.33
250.39

8.56
19.20
27.76
222.64
27.76
124.15
37.92
88.33
250.39

8.56
19.20
27.76
222.64
0.18
8.56
2.14
48.00

129.42

491.12

289.17
327.89
909.71

81.75

9.28
10.13
10.00
19.84

Civil Aviation Authority of Nepal


Head Office, Babarmahal

District Rates
Project :- Bharatpur Civil Aviation Office.
Job :- Construction of Visitor's Shed.
S.No.
1
2
3
4
5
6
7
8
9
10

11
12
13
14
15
16

17
18
19
20
21
22

F/Y :- 2070/71.
Site :- Bharatpur Airport, Chitwan.

Description of items
Unit
Rates
Remarks
Skilled labour
M-day
542.00
Unskilled labour
M-day
379.00
Cement
Kg.
13.20
Rs. 660/50=13.20
White Cement
Kg.
23.75
Rs. 950/40=23.75
Sand
Cum.
1,200.00
Aggregate (5mm to 40 mm)
Cum.
1,450.00
TMT Bar
Kg.
77.00
Binding wire
Kg.
87.00
Bricks
Nos.
10.00
26 gauge coloured CGI
Sqm.
529.67
9460/17.86=478.78
Sheet(Heavy)
(1 Bandle=72'x2'-8"=192.24 Sqft /10.76=17.86 Sqm.)
0.40 mm coloured Plain
Rm.
281.31 1370.00/4.87=281.31
sheet
(1 Pcs.=4ft x 8 ft. =32 Sqft / 2=16.00 Rft /3.28 =4.87 Rm.)
J hook
Nos.
16.25
130/8=16.25
8 mm dia. Nut & bolts
Nos.
18.75
150/8=18.75
Bitumen washer
Nos.
0.30
30/100=0.30
MS Black pipe.
Kg.
76.00
KTM District Rates
MS grill
Kg.
76.00
Black pipe tubular truss
Kg.
120.00
fitting & fixing all complete
works.
MS grill making & fixing all
Kg.
110.00
complete
(1 Sqm. = 21.50 Kg. since 1 Sqft. grill =2.0 Kg.*10.76)
5 mm th. White glass
Sqm.
753.20
Rs. 70 per Sqft.
Wood Primer
Litre
439.00
Readymade Enamel paint
Litre
528.00
Exterial emulsion (weather
coat) paint.
Litre
557.00
KTM District Rates

Civil Aviation Authority of Nepal


Head Office, Babarmahal

Rate Analysis
Project :- Bharatpur Civil Aviation Office.
Job :- Construction of Visitor's Shed.
Ref.

Description of item
Unit

:
:

Resources

Level/Type

RAN 2-1.
Earthwork in excavation in Ordinary type of clay & silty soil.
1 Cu. m.
Quantity

Labours : Unskilled

0.70

Ref.

Description of item

Unit

Resources

F/Y :Site :- Bharatpur Airport

Level/Type

m.d.

Rate per
Amounts
Total from each
Unit
379.00
265.30
265.30
Add, 3% for Tools & Plants
7.96
Actual rate
273.26
15% contractor's overhead
40.99
Total Amount
314.25
Rate per Cu. m.
314.25

RAN 2-25-ka
Earthwork in filling in layers (each layer 15 cm) with watering and com
including transportation from 10 m.
1 Cu. m.
Quantity

Labours : Unskilled

Unit

0.50

Unit
m.d.

Rate per
Unit
18.75

Amounts

Total from each

9.38

9.38

Actual rate
15% contractor's overhead
Total Amount
Rate per Cu. m.

9.38
1.41
10.79
10.79

Ref.

RAN 11-15-Ka.

Description of item
Unit

:
:

Dry brick flat soling work with filling the joint by sand.

Resources

Level/Type

10 Sq. m.
Quantity

Labours : Skilled
Unskilled
Materials : Bricks
Sand

0.50
1.00
420.00
0.71

Unit
m.d.
m.d.
Nos.
Cum.

Rate per
Unit
542.00
379.00
10.00
1200.00

Amounts

271.00
379.00
4200.00
852.00
Actual rate
15% contractor's overhead
Total Amount
Rate per sq. m.

Total from each


650.00
5052.00
5702.00
855.30
6557.30
655.73

Ref.

RAN 5-1-Kha-ii.

Description of item
Unit

:
:

Brick masonary 1:4 C/S motar work by using chimney(Bhatta) made brick.

1 Cum.

Resources

Level/Type

Quantity

Labours : Skilled
Unskilled
Materials : Bricks
Cement
Sand

1.50
2.20
560.00
100.00
0.28

Unit
m.d.
m.d.
Nos.
Kg.
Cum.

Rate per
Unit
542.00
379.00
10.00
13.20
1200.00

813.00
833.80
5600.00
1320.00
336.00
Actual rate
15% contractor's overhead
Total Amount
Rate per cum.

Ref.

RAN 7-2-Gha.

Description of item
Unit

:
:

P.C.C. (1:2:4) work.

Resources

Level/Type

1.00
4.00
0.85
320.00
0.445

Unit
m.d.
m.d.
Cum.
Kg.
Cum.

Rate per
Unit
542.00
379.00
1450.00
13.20
1200.00

Amounts

542.00
1516.00
1232.50
4224.00
534.00
Actual rate
15% contractor's overhead
Total Amount
Rate per cu. m.

Ref.

RAN 12-1-Ga.

Description of item
Unit

:
:

12.5 mm thick 1:4 C/S mortar plaster work.

Resources

Level/Type

12.00
16.00
538.00
1.46

Unit
m.d.
m.d.
Kg.
Cum.

Rate per
Unit
542.00
379.00
13.20
1200.00

Amounts

6504.00
6064.00
7101.60
1752.00
Actual rate
15% contractor's overhead
Total Amount
Rate per sq. m.

Ref.

RAN 11-20.

Description of item
Unit

:
:

3 mm thick cement punning work.

Resources

Level/Type

1646.80

7256.00
8902.80
1335.42
10238.22
10238.22

Total from each


2058.00

5990.50
8048.50
1207.28
9255.78
9255.78

100 Sq. m.
Quantity

Labours : Skilled
Unskilled
Materials : Cement
Sand

Total from each

1 Cu. m.
Quantity

Labours : Skilled
Unskilled
Materials : Aggregate
Cement
Sand

Amounts

Total from each


12568.00
8853.60
21421.60
3213.24
24634.84
246.35

10 Sq. m.
Quantity

Unit

Rate per
Unit

Amounts

Total from each

Labours : Skilled
Unskilled
Materials : Cement

1.00
1.00
53.20

m.d.
m.d.
Kg.

542.00
379.00
13.20

542.00
379.00
702.24
Actual rate
15% contractor's overhead
Total Amount
Rate per sq. m.

921.00
702.24
1623.24
243.49
1866.73
186.67

Ref.

RAN
10-11-Ga.
Supplying
and providing 5 mm thick glass on frame or Chaukosh with necessa

Description of item
Unit

:
:

all complete fittings.

Resources

Level/Type

Quantity

Labours : Skilled
Unskilled
Materials : 5 mm thick glass
Listy
Nails

0.06
0.006
1.00

Ref.

Description of item

Unit

Resources

Level/Type

Labours : Skilled
Unskilled
Materials : MS black tubular pipe

1 Sqm.
Unit
m.d.
m.d.
Sqm.
LS
LS

Rate per
Unit
0.00
0.00
0.00
300.00
50.00

Amounts

0.00
0.00
0.00
300.00
50.00
Actual rate
15% contractor's overhead
Total Amount

Total from each


Resources
0.00

350.00
350.00
52.50
402.50

Similar works.

Providing and fixing of MS black tubular pipe for Post, Rafter & Purlin etc. incl
cutting, plating, welding and necessary painting works all complete.

59.34 Kg.
Quantity
3.00
4.00
59.34

Unit
m.d.
m.d.
Kg.

Rate per
Unit
542.00
379.00
76.00

Amounts
1626.00
1516.00
4509.84

Total from each


3142.00

Primer paint

LS

200.00

200.00
Actual rate
15% contractor's overhead
Total Amount
Rate per Kg.

4709.84
7851.84
1177.78
9029.62
152.17

Ref.

RAN 9-1.

Description of item
Unit

:
:

26 gauge Coloured heavy CGI Sheet roofing work.

Resources

Level/Type

Quantity

Labours : Skilled
Unskilled
Materials : 26 gauge CGI Sheet
8 mm dia. Nut & bolts
J hook
Bitumen washer

1.10
1.25
12.00
30.00
25.00
55.00

Ref.

Description of item
Unit

:
:

Resources

10 Sq. m.

Level/Type

m.d.
m.d.
Sqm.
Nos.
Nos.
Nos.

Rate per
Unit
542.00
379.00
529.67
18.75
16.25
0.30

Amounts

596.20
473.75
6356.04
562.50
406.25
16.50
Actual rate
15% contractor's overhead
Total Amount
Rate per sq. m.

Total from each


1069.95

7341.29
8411.24
1261.69
9672.93
967.29

RAN 13-5.
painting work.
100 Sqm.

9.00
5.00

m.d.
m.d.

Rate per
Unit
542.00
379.00

16.00

Litre

557.00

Quantity

Labours : Skilled
Unskilled
Materials : Exterial emulsion (Weather
coat) paint

Unit

Unit

Amounts

Total from each

4878.00
1895.00

6773.00

8912.00
Actual rate
15% contractor's overhead
Total Amount
Rate per sq. m.

8912.00
15685.00
2352.75
18037.75
180.38

Ref.

RAN 13-5.

Description of item
Unit

:
:

Supplying and applying two coats of enamel paint over one coat primer works

Resources

Level/Type

Labours : Skilled
Unskilled
Materials : Wood primer
Enamel paint

100 Sq. m.
Quantity
12.00
8.00
8.10
16.00

Unit
m.d.
m.d.
Litre
Litre

Rate per
Unit
542.00
379.00
439.00
528.00

Amounts

6504.00
3032.00
3555.90
8448.00
Actual rate
15% contractor's overhead
Total Amount
Rate per sq. m.

Total from each


9536.00
12003.90
21539.90
3230.99
24770.89
247.71

F/Y :- 2070/71.
Site :- Bharatpur Airport, Chitwan.

clay & silty soil.


Remarks

cm) with watering and compaction


on from 10 m.
Remarks

sand.

Remarks

mney(Bhatta) made brick.

Remarks

Remarks

Remarks

Remarks

me or Chaukosh with necessary listy &

Remarks

Post, Rafter & Purlin etc. including


works all complete.

Remarks

k.

Remarks

Remarks

t over one coat primer works.

Remarks