Genesis
Energy
Conservati
on Act
Enacted
2001
EC Act
amended to
add
issuance of
ECerts
Sector
studies
conducted
to identify
DCs
2008
2009
Baseline
Data
Collection
begins
2010
Team
Formed by
TSIL to
focus on
ENCON
projects
2012
TSIL
completes
the Audit
and
qualifies for
19404
Ecerts
2015
PAT Cycle-1
Notified and
came in to
force
(2012-2015)
Perform Achieve and Trade (PAT): An instrument to reduce
specific energy
consumption in energy intensive industries, with an associated
market based mechanism to enhance the cost effectiveness
through certification of excess energy saving which can be traded.
PAT CYCLE-I
PAT CYCLE-II
PAT Cycles
No. of
Units
(DCs)
Share of
Sectors
Total
Covered
Energy
Consumpt
ion
Cycle-I
(2012-13 to 201516)
478
36%
Cycle-II
(2016-17 to 201819)
900-950
50%
11
Electricity generated by Coal based CGP
(Partially sold to grid)
Electricity generated by Coal based CGP
(Partially sold to grid & separate boundary)
PAT Cycle-II Target
2.5
2.07
1.95
1.74
1.63
1.5
1.26
1.26
0.5
Cycle-2 Baseline SEC
0.67
0.64
0.62
0.62
0.6
0.58
0.58
0.55
0.54
0.54
0.53
0.52
0.52
0.51
0.51
0.5
0.49
0.49
0.49
0.47
0.470.48
0.45 0.47
0.41
0.380.38
0.37
0.370.41
0.350.38
6%
6% 6%
0.04
0.03
0.02
0.02
Cycle-2 Target SEC
Cycle-2 %ge Redn.
5% 5% 6% 5% 6% 5% 5% 6% 7% 7% 7%
4%
6% 6%
0
0%
0% 0%
0%
PAT Cycle-II Modifications
As per Rule 2012
As per Revised 2016
check-verification
The energy
consumption
Norms and standards
achieved in any year
of the three year cycle
check-verification
The energy
consumption norms
and standards
achieved in the target
year
Earlier issuance of
ESCerts(First and
Second year of
PATCycle)
Issuance of Certificate
only after the end of
target year
Remarks
PAT Cycle-II Modifications
As per Rule 2012
As per Revised 2016
check-verification
The energy
consumption
Norms and standards
achieved in any year
of the three year cycle
check-verification
The energy consumption
norms and standards achieved
in the target year
Earlier issuance of
ESCerts(First and
Second year of PAT
Cycle)
Issuance of Certificate only
after the end of target year
Samples as fired basis from
auto sampler once in a month
in the own lab and external lab
(NABL accredited) for GCV and
proximate analysis.
Remarks