PAT Cycle-II - Target and Way Forward

This document discusses the PAT (Perform Achieve and Trade) Cycle-II in India, which aims to reduce energy consumption in energy intensive industries. Some key points: PAT Cycle-I covered 478 units responsible for 36% of sector-wide energy consumption across 8 sectors. PAT Cycle-II (2016-2019) expanded to cover 900-950 units accounting for 50% of energy use across 11 sectors. Targets for specific energy reduction were set for each sector, ranging from 0.02-2.07%. Revisions were made for PAT Cycle-II including basing energy consumption norms on the target year's performance rather than the three-year cycle, and only issuing energy savings certificates after independently

Uploaded by

Bijay Agrawal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
101 views9 pages

PAT Cycle-II - Target and Way Forward

This document discusses the PAT (Perform Achieve and Trade) Cycle-II in India, which aims to reduce energy consumption in energy intensive industries. Some key points: PAT Cycle-I covered 478 units responsible for 36% of sector-wide energy consumption across 8 sectors. PAT Cycle-II (2016-2019) expanded to cover 900-950 units accounting for 50% of energy use across 11 sectors. Targets for specific energy reduction were set for each sector, ranging from 0.02-2.07%. Revisions were made for PAT Cycle-II including basing energy consumption norms on the target year's performance rather than the three-year cycle, and only issuing energy savings certificates after independently

Uploaded by

Bijay Agrawal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 9

PAT CYCLE-II

(GENESIS, TARGETS AND WAY


FORWARD)

Genesis

Energy
Conservati
on Act
Enacted

2001

EC Act
amended to
add
issuance of
ECerts

Sector
studies
conducted
to identify
DCs

2008

2009

Baseline
Data
Collection
begins

2010

Team
Formed by
TSIL to
focus on
ENCON
projects

2012

TSIL
completes
the Audit
and
qualifies for
19404
Ecerts

2015

PAT Cycle-1
Notified and
came in to
force
(2012-2015)

Perform Achieve and Trade (PAT): An instrument to reduce


specific energy
consumption in energy intensive industries, with an associated
market based mechanism to enhance the cost effectiveness
through certification of excess energy saving which can be traded.

PAT CYCLE-I

PAT CYCLE-II

PAT Cycles

No. of
Units
(DCs)

Share of
Sectors
Total
Covered
Energy
Consumpt
ion

Cycle-I
(2012-13 to 201516)

478

36%

Cycle-II
(2016-17 to 201819)

900-950

50%

11

Electricity generated by Coal based CGP


(Partially sold to grid)

Electricity generated by Coal based CGP


(Partially sold to grid & separate boundary)

PAT Cycle-II Target


2.5
2.07
1.95

1.74
1.63
1.5

1.26
1.26

0.5

Cycle-2 Baseline SEC

0.67
0.64
0.62
0.62
0.6
0.58
0.58
0.55
0.54
0.54
0.53
0.52
0.52
0.51
0.51
0.5
0.49
0.49
0.49
0.47
0.470.48
0.45 0.47
0.41
0.380.38
0.37
0.370.41
0.350.38
6%
6% 6%
0.04
0.03
0.02
0.02

Cycle-2 Target SEC


Cycle-2 %ge Redn.

5% 5% 6% 5% 6% 5% 5% 6% 7% 7% 7%

4%

6% 6%

0
0%

0% 0%

0%

PAT Cycle-II Modifications

As per Rule 2012

As per Revised 2016

check-verification
The energy
consumption
Norms and standards
achieved in any year
of the three year cycle

check-verification
The energy
consumption norms
and standards
achieved in the target
year

Earlier issuance of
ESCerts(First and
Second year of
PATCycle)

Issuance of Certificate
only after the end of
target year

Remarks

PAT Cycle-II Modifications

As per Rule 2012

As per Revised 2016

check-verification
The energy
consumption
Norms and standards
achieved in any year
of the three year cycle

check-verification
The energy consumption
norms and standards achieved
in the target year

Earlier issuance of
ESCerts(First and
Second year of PAT
Cycle)

Issuance of Certificate only


after the end of target year
Samples as fired basis from
auto sampler once in a month
in the own lab and external lab
(NABL accredited) for GCV and
proximate analysis.