Rab Final
Rab Final
Btg
Kg
M3
M3
M3
Kg
Kg
Oh
Oh
Oh
Oh
Dibulatkan
A-02 1 M' Pagar Sementara Seng Gelombang Tinggi 2 m
- Dolken Kayu 8-10 / 400 cm
Btg
- Semen Portland
Kg
- Seng Gelombang BJLS-30
Lbr
- Pasir beton
M3
- Koral Beton 2/3
M3
- Kayu balok terentang
M3
- Paku Biasa 2" - 5"
Kg
- Meni Besi
Kg
- Pekerja
Oh
- Tukang Kayu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
A-03 1 M' Pagar SementaraKawat Duri Tinggi 1,80 m
- Dolken Kayu 8-10 / 400 cm
- Semen Portland
- Kawat Duri
- Pasir beton
- Koral Beton 2/3
- Paku Biasa 2" - 5"
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1.2500
2.5000
0.0050
0.0090
0.0720
0.0600
0.4000
0.4000
0.2000
0.0200
0.0200
30,800.00
1,488.00
255,400.00
218,268.00
2,705,000.00
24,000.00
9,000.00
66,750.00
100,100.00
106,700.00
120,100.00
38,500.00
3,720.00
1,277.00
1,964.41
194,760.00
1,440.00
3,600.00
26,700.00
20,020.00
2,134.00
2,402.00
296,517.41
296,517.00
1.2500
2.5000
1.2000
0.0050
0.0090
0.0720
0.0600
0.4500
0.4000
0.2000
0.0200
0.0200
30,800.00
1,488.00
69,500.00
255,400.00
218,268.00
2,705,000.00
24,000.00
33,500.00
66,750.00
100,100.00
106,700.00
120,100.00
38,500.00
3,720.00
83,400.00
1,277.00
1,964.41
194,760.00
1,440.00
15,075.00
26,700.00
20,020.00
2,134.00
2,402.00
391,392.41
391,392.00
Btg
Kg
Kg
M3
M3
Kg
Oh
Oh
Oh
Oh
1.0000
2.0000
2.5000
0.0050
0.0090
0.0600
0.3000
0.2000
0.0200
0.0200
30,800.00
1,488.00
70,000.00
255,400.00
218,268.00
24,000.00
66,750.00
100,100.00
106,700.00
120,100.00
30,800.00
2,976.00
175,000.00
1,277.00
1,964.41
1,440.00
20,025.00
20,020.00
2,134.00
2,402.00
258,038.41
258,038.00
1.2500
0.1800
0.8500
1.1000
35.0000
0.1500
0.1000
0.1500
30.0000
0.2500
2.0000
0.0800
0.1500
0.0600
2.0000
2.0000
1.0000
0.3000
0.0500
30,800.00
2,705,000.00
24,000.00
29,500.00
1,488.00
233,400.00
255,400.00
218,268.00
750.00
17,400.00
37,000.00
96,200.00
104,000.00
145,000.00
66,750.00
100,100.00
100,100.00
106,700.00
120,100.00
38,500.00
486,900.00
20,400.00
32,450.00
52,080.00
35,010.00
25,540.00
32,740.20
22,500.00
4,350.00
74,000.00
7,696.00
15,600.00
8,700.00
133,500.00
200,200.00
100,100.00
32,010.00
6,005.00
1,328,281.20
1,328,281.00
Btg
M3
Kg
Kg
M3
M3
Lbr
Oh
Oh
Oh
Oh
1.7000
0.2100
0.3000
10.5000
0.0300
0.0500
1.5000
1.0000
2.0000
0.2000
0.0500
30,800.00
2,705,000.00
24,000.00
1,488.00
255,400.00
218,268.00
69,500.00
66,750.00
100,100.00
106,700.00
120,100.00
52,360.00
568,050.00
7,200.00
15,624.00
7,662.00
10,913.40
104,250.00
66,750.00
200,200.00
21,340.00
6,005.00
1,060,354.40
1,060,354.00
Btg
M3
Kg
Kg
M3
M3
Lbr
Oh
Oh
Oh
Oh
1.2500
0.1860
0.3000
18.0000
0.0300
0.0500
1.5000
1.0000
2.0000
0.2000
0.0500
30,800.00
2,705,000.00
24,000.00
1,488.00
255,400.00
218,268.00
69,500.00
66,750.00
100,100.00
106,700.00
120,100.00
38,500.00
503,130.00
7,200.00
26,784.00
7,662.00
10,913.40
104,250.00
66,750.00
200,200.00
21,340.00
6,005.00
992,734.40
992,734.00
Oh
Oh
0.1000
0.0500
66,750.00
120,100.00
12,680.00
M3
M3
M3
Oh
Oh
0.1500
0.0900
0.0100
1.0000
0.0500
212,534.00
202,664.00
233,400.00
66,750.00
120,100.00
31,880.10
18,239.76
2,334.00
66,750.00
6,005.00
125,208.86
125,209.00
Oh
Oh
6.6670
0.3330
66,750.00
120,100.00
Dibulatkan
6,675.00
6,005.00
12,680.00
445,022.25
39,993.30
485,015.55
485,016.00
0.9860
0.5250
0.0740
0.1460
45.0000
0.3750
0.1250
0.0120
0.0190
200,900.00
290,500.00
255,400.00
218,268.00
1,488.00
66,750.00
100,100.00
106,700.00
120,100.00
198,087.40
152,512.50
18,899.60
31,867.13
66,960.00
25,031.25
12,512.50
1,280.40
2,281.90
509,432.68
509,433.00
0.4340
6.7860
0.0424
4.0000
2.5000
0.0050
0.0090
0.3750
0.1250
0.0120
0.0190
15,500.00
20,200.00
20,200.00
700.00
1,488.00
255,400.00
218,268.00
66,750.00
100,100.00
106,700.00
120,100.00
6,727.00
137,077.20
856.28
2,800.00
3,720.00
1,277.00
1,964.41
25,031.25
12,512.50
1,280.40
2,281.90
195,527.94
195,528.00
Lbr
Kg
Kg
M3
M3
Oh
Oh
Oh
Oh
0.4340
2.0000
2.5000
0.0050
0.0090
0.3750
0.1250
0.0120
0.0190
188,500.00
1,488.00
70,000.00
255,400.00
218,268.00
66,750.00
100,100.00
106,700.00
120,100.00
81,809.00
2,976.00
175,000.00
1,277.00
1,964.41
25,031.25
12,512.50
1,280.40
2,281.90
304,132.46
304,132.00
btng
kg
org
org
org
org
1.0000
0.2500
0.2500
0.0170
0.0020
0.0130
27,500.00
25,800.00
66,750.00
100,100.00
106,700.00
120,100.00
27,500.00
6,450.00
16,687.50
1,701.70
213.40
1,561.30
54,113.90
54,114.00
btng
org
org
1.2500
0.5000
0.0250
27,500.00
66,750.00
120,100.00
34,375.00
33,375.00
3,002.50
70,752.50
70,753.00
URAIAN
SATUAN
Oh
Oh
VOLUME
0.5260
0.0520
HARGA SATUAN
(Rp)
66,750.00
120,100.00
Dibulatkan
35,110.50
6,245.20
41,355.70
41,356.00
Oh
Oh
0.7350
0.0730
66,750.00
120,100.00
49,061.25
8,767.30
57,828.55
57,829.00
Oh
Oh
0.6250
0.0620
66,750.00
120,100.00
41,718.75
7,446.20
49,164.95
49,165.00
Oh
Oh
0.8230
0.0830
66,750.00
120,100.00
54,935.25
9,968.30
64,903.55
64,904.00
Oh
Oh
0.0500
0.0050
66,750.00
120,100.00
3,337.50
600.50
3,938.00
3,938.00
Oh
Oh
0.5160
0.0500
66,750.00
120,100.00
34,443.00
6,005.00
40,448.00
Dibulatkan
HARGA
(Rp)
40,448.00
Oh
Oh
0.5000
0.0500
66,750.00
120,100.00
33,375.00
6,005.00
39,380.00
39,380.00
No.
URAIAN
SATUAN
m2
Oh
Oh
VOLUME
1.2000
0.1500
0.0150
HARGA SATUAN
(Rp)
24,500.00
66,750.00
120,100.00
HARGA
(Rp)
29,400.00
10,012.50
1,801.50
41,214.00
41,214.00
M3
Oh
Oh
1.2000
0.2500
0.0250
211,030.00
66,750.00
120,100.00
253,236.00
16,687.50
3,002.50
272,926.00
272,926.00
M3
Oh
Oh
1.2000
0.2500
0.0250
92,308.00
66,750.00
120,100.00
110,769.60
16,687.50
3,002.50
130,459.60
130,460.00
M3
M3
M3
Oh
Oh
0.2750
0.0300
0.0500
1.0000
0.1000
212,534.00
178,600.00
181,232.00
66,750.00
120,100.00
58,446.85
5,358.00
9,061.60
66,750.00
12,010.00
151,626.45
151,626.00
URAIAN
SATUAN
M3
Kg
M3
Oh
Oh
Oh
Oh
VOLUME
HARGA SATUAN
(Rp)
1.1000
202.0000
0.4850
1.5000
0.6000
0.0600
0.0750
212,534.00
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
M3
Kg
M3
Oh
Oh
Oh
Oh
1.1000
163.0000
0.5200
1.5000
0.6000
0.0600
0.0750
212,534.00
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
233,787.40
242,544.00
121,368.00
100,125.00
60,060.00
6,402.00
9,007.50
773,293.90
773,294.00
233,787.40
300,576.00
113,199.00
100,125.00
60,060.00
6,402.00
9,007.50
823,156.90
823,157.00
Dibulatkan
HARGA
(Rp)
M3
Oh
Oh
Oh
Oh
1.2000
212,534.00
255,040.80
0.3000
0.7800
0.3900
0.0390
0.0390
181,232.00
66,750.00
100,100.00
106,700.00
120,100.00
54,369.60
52,065.00
39,039.00
4,161.30
4,683.90
409,359.60
Dibulatkan
C-05 1 M3 Beton siklop adk 1pc : 2ps : 3kr + 40 % Batu Belah dgn besi tulangan
- Besi Beton
Kg
75.0000
- Semen Portland
Kg
202.0000
- Pasir Beton
m3
0.3200
- Koral Beton 2/3
m3
0.4900
- Kawat Beton
Kg
0.8000
- Batu Belah
m3
0.4500
- Pekerja
Oh
3.0000
- Tukang Batu
Oh
0.8500
- Kepala Tukang
Oh
0.0850
- Mandor
Oh
0.1500
Jumlah
Dibulatkan
409,360.00
16,500.00
1,488.00
255,400.00
218,268.00
30,500.00
212,534.00
66,750.00
100,100.00
106,700.00
120,100.00
1,237,500.00
300,576.00
81,728.00
106,951.32
24,400.00
95,640.30
200,250.00
85,085.00
9,069.50
18,015.00
2,159,215.12
2,159,215.00
No.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
C-06 1 M3 Pasang Pondasi Sumuran adk 1pc:2ps:3kr + 40 % Batu Belah (D= 1m)
- Batu Belah
M3
0.4500
212,534.00
- Semen Portland
Kg
280.0000
1,488.00
- Pasir Beton
M3
0.4500
255,400.00
- Koral Beton
M3
0.6700
218,268.00
- Pekerja
Oh
2.3800
66,750.00
- Tukang Batu
Oh
0.3000
100,100.00
- Kepala Tukang
Oh
0.0300
106,700.00
- Mandor
Oh
0.0800
120,100.00
Jumlah
Dibulatkan
C-07 1 M3 Pondasi siklop adk 1pc:2ps:3kr + 40 % Batu Belah
- Batu Belah
M3
- Semen Portland
Kg
- Pasir Beton
M3
- Koral Beton
M3
- Pekerja
Oh
- Tukang Batu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
C-08 1 M' Pembuatan Tiang Pancang (40x40) cm, Beton Tulang
- Pasir Urug
M3
- Pasir Beton
M3
- Koral Beton
M3
- Semen Portland
Kg
- Besi Beton
Kg
- Kawat Beton
Kg
- Kayu balok terentang
M3
- Paku
Kg
- Minyak Bekisting
Ltr
- Plamir Tembok
Kg
- Pekerja
Oh
- Tukang Batu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
C-09 1 M' Pembuatan Tiang Pancang (35x35) cm, Beton Tulang
- Pasir Urug
M3
- Pasir Beton
M3
- Koral Beton
M3
- Semen Portland
Kg
- Besi Beton
Kg
- Kawat Beton
Kg
- Kayu balok terentang
M3
- Paku
Kg
- Minyak Bekisting
Ltr
- Plamir Tembok
Kg
- Pekerja
Oh
- Tukang Batu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
HARGA
(Rp)
95,640.30
416,640.00
114,930.00
146,239.56
158,865.00
30,030.00
3,201.00
9,608.00
975,153.86
975,154.00
0.4500
202.0000
0.3200
0.4900
3.0000
0.8500
0.0850
0.1500
212,534.00
1,488.00
255,400.00
218,268.00
66,750.00
100,100.00
106,700.00
120,100.00
95,640.30
300,576.00
81,728.00
106,951.32
200,250.00
85,085.00
9,069.50
18,015.00
897,315.12
897,315.00
0.0190
0.0940
0.1500
60.5000
45.0000
0.9000
0.0320
0.1200
0.0900
0.2400
1.0000
0.6700
0.0670
0.0500
181,232.00
255,400.00
218,268.00
1,488.00
16,500.00
30,500.00
2,705,000.00
24,000.00
57,500.00
27,500.00
66,750.00
100,100.00
106,700.00
120,100.00
3,443.41
24,007.60
32,740.20
90,024.00
742,500.00
27,450.00
86,560.00
2,880.00
5,175.00
6,600.00
66,750.00
67,067.00
7,148.90
6,005.00
1,168,351.11
1,168,351.00
0.0160
0.0800
0.1250
49.0000
34.5000
0.7000
0.0270
0.1200
0.0900
0.2000
0.8000
0.5000
0.0500
0.0400
181,232.00
255,400.00
218,268.00
1,488.00
16,500.00
30,500.00
2,705,000.00
24,000.00
57,500.00
27,500.00
66,750.00
100,100.00
106,700.00
120,100.00
2,899.71
20,432.00
27,283.50
72,912.00
569,250.00
21,350.00
73,035.00
2,880.00
5,175.00
5,500.00
53,400.00
50,050.00
5,335.00
4,804.00
914,306.21
914,306.00
No.
URAIAN
SATUAN
VOLUME
0.0149
0.0738
0.1178
47.4925
45.0000
0.9000
0.0320
0.1200
0.0900
0.2400
1.0000
0.6700
0.0670
0.0500
HARGA SATUAN
(Rp)
181,232.00
255,400.00
218,268.00
1,488.00
16,500.00
30,500.00
2,705,000.00
24,000.00
57,500.00
27,500.00
66,750.00
100,100.00
106,700.00
120,100.00
HARGA
(Rp)
2,703.08
18,845.97
25,701.06
70,668.84
742,500.00
27,450.00
86,560.00
2,880.00
5,175.00
6,600.00
66,750.00
67,067.00
7,148.90
6,005.00
1,136,054.84
1,136,055.00
0.1170
0.0400
0.0020
1,078,774.00
66,750.00
120,100.00
126,216.56
2,670.00
240.20
129,126.76
129,127.00
3.3200
0.0700
0.2000
0.3500
66,750.00
106,700.00
120,100.00
253,099.00
221,610.00
7,469.00
24,020.00
88,584.65
341,683.65
341,684.00
18.3700
6.06
2.20
1.00
2.0000
0.2000
2.0000
15,600.00
16,500.00
26,000.00
100,100.00
66,750.00
120,100.00
26,325.00
286,572.00
99,990.00
57,200.00
100,100.00
133,500.00
24,020.00
52,650.00
754,032.00
754,032.00
D-02
D-03
D-04
URAIAN
1 M3 Membuat Beton Tumbuk adk 1pc:3ps:5kr
- Semen Portland
- Pasir Beton
- Batu Pecah Mesin 2/3
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M3 Membuat Beton Tumbuk adk 1pc:3ps:6kr
- Semen Portland
- Pasir Beton
- Batu Pecah Mesin 2/3
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M3 Membuat Beton Tumbuk 1pc:2ps:3kr
- Semen Portland
- Pasir Beton
- Batu Pecah Mesin 2/3
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M3 Membuat Tiang Pancang Beton Prestressed
- Semen Portland
- Pasir Beton
- Batu Pecah Mesin 2/3
- Rapidrant
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
SATUAN
VOLUME
HARGA SATUAN
(Rp)
Kg
M3
M3
Oh
Oh
Oh
Oh
218.0000
0.5200
0.8700
1.6500
0.2500
0.0250
0.0800
1,488.00
255,400.00
218,268.00
66,750.00
100,100.00
106,700.00
120,100.00
Kg
M3
M3
Oh
Oh
Oh
Oh
197.0000
0.4700
0.9400
1.6500
0.2500
0.0250
0.0800
1,488.00
255,400.00
218,268.00
66,750.00
100,100.00
106,700.00
120,100.00
Kg
M3
M3
Oh
Oh
Oh
Oh
336.0000
0.5400
0.8100
2.0000
0.3500
0.0350
1.0000
1,488.00
255,400.00
218,268.00
66,750.00
100,100.00
106,700.00
120,100.00
Kg
M3
M3
Gln
Oh
Oh
Oh
Oh
440.0000
0.5000
0.8000
2.4600
1.6500
0.2500
0.0250
0.0800
1,488.00
255,400.00
218,268.00
17,500.00
66,750.00
100,100.00
106,700.00
120,100.00
No.
D-06
D-08
D-09
D-10
URAIAN
1 M Memasang PVC Waterstop Lebar 200 mm
- Waterstop Lebar 200 mm
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
SATUAN
VOLUME
HARGA SATUAN
(Rp)
M
Oh
Oh
Oh
Oh
1.0500
0.0500
0.0350
0.0035
0.0020
60,000.00
66,750.00
100,100.00
106,700.00
120,100.00
M3
Kg
Ltr
Oh
Oh
Oh
Oh
0.0400
0.3000
2,950,000.00
24,000.00
57,500.00
66,750.00
100,100.00
106,700.00
120,100.00
M3
Kg
Ltr
Oh
Oh
Oh
Oh
0.0450
0.3000
M3
Kg
Ltr
M3
Lbr
Btg
Oh
Oh
Oh
Oh
0.0400
0.4000
0.3000
0.2600
0.0260
0.0050
0.3000
0.2600
0.0260
0.0050
0.0150
0.3500
2.0000
0.3000
0.3300
0.0330
0.0060
2,950,000.00
24,000.00
57,500.00
66,750.00
100,100.00
106,700.00
120,100.00
2,950,000.00
24,000.00
57,500.00
2,705,000.00
166,500.00
30,800.00
66,750.00
100,100.00
106,700.00
120,100.00
No.
D-11
URAIAN
1 M2 Pasang Bekesting Untuk Balok
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Kayu balok terentang
- MultiPlek 9 mm 120 x 240
- Dolken -8-10/4m
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor
Jumlah
SATUAN
VOLUME
HARGA SATUAN
(Rp)
M3
Kg
Ltr
M3
Lbr
Btg
Oh
Oh
Oh
Oh
0.0400
0.4000
0.0180
0.3500
2.0000
0.3000
0.3300
0.0330
0.0060
2,950,000.00
24,000.00
57,500.00
2,705,000.00
166,500.00
30,800.00
66,750.00
100,100.00
106,700.00
120,100.00
M3
Kg
Ltr
M3
Lbr
Btg
Oh
Oh
Oh
Oh
0.0300
0.4000
0.1500
0.0150
0.3500
2.0000
0.3200
0.3300
0.0330
0.0060
2,950,000.00
24,000.00
57,500.00
2,705,000.00
166,500.00
30,800.00
66,750.00
100,100.00
106,700.00
120,100.00
Kg
m3
M3
ltr
Oh
Oh
Oh
Oh
388.0000
0.6500
0.6500
215.0000
6.0000
1.0000
0.1000
0.3000
1,488.00
255,400.00
218,268.00
3,500.00
66,750.00
100,100.00
106,700.00
120,100.00
Dibulatkan
D-13
D-14
No.
D-15
D-16
D-17
D-17r1
URAIAN
1 M3 Membuat Beton Cor Mutu K-275
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Air
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
SATUAN
Kg
M3
M3
ltr
Oh
Oh
Oh
Oh
VOLUME
HARGA SATUAN
(Rp)
400.0000
0.4000
0.8200
215.0000
6.0000
1.0000
0.1000
0.3000
1,488.00
255,400.00
218,268.00
3,500.00
66,750.00
100,100.00
106,700.00
120,100.00
0.2000
1.5000
150.0000
2.2500
323.0000
0.5200
0.7800
3.9000
0.3500
1.0400
1.0500
0.2450
0.1650
2,950,000.00
24,000.00
57,500.00
16,500.00
30,500.00
1,488.00
255,400.00
218,268.00
66,750.00
100,100.00
100,100.00
100,100.00
106,700.00
120,100.00
M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
Oh
Oh
Oh
Oh
Oh
Oh
0.2700
2.0000
0.6000
200.0000
3.0000
323.0000
0.5200
0.7800
4.8500
0.3500
1.5600
1.4000
0.3310
0.1700
2,950,000.00
24,000.00
57,500.00
16,500.00
30,500.00
1,488.00
255,400.00
218,268.00
66,750.00
100,100.00
100,100.00
100,100.00
106,700.00
120,100.00
Dibulatkan
1 M3 Sloof Beton Tulang 15/20 (150 kg besi + bekisting)
- Kayu papan terentang
M3
- Paku Biasa 2" - 5"
Kg
- Minyak Bekisting
Ltr
- Besi Beton
Kg
- Kawat Beton
Kg
- Semen Portland
Kg
- Pasir Beton
M3
- Koral Beton 2/3
M3
- Pekerja
Oh
- Tukang Batu
Oh
- Tukang Kayu
Oh
- Tukang Besi
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
0.2700
2.0000
0.6000
150.0000
3.0000
323.0000
0.5200
0.7800
4.8500
0.3500
1.5600
1.4000
0.3310
0.1700
2,950,000.00
24,000.00
57,500.00
16,500.00
30,500.00
1,488.00
255,400.00
218,268.00
66,750.00
100,100.00
100,100.00
100,100.00
106,700.00
120,100.00
Dibulatkan
1 M3 Pondasi Beton Tulang (150 kg besi + bekisting)
- Kayu papan terentang
M3
- Paku Biasa 2" - 5"
Kg
- Minyak Bekisting
Ltr
- Besi Beton
Kg
- Kawat Beton
Kg
- Semen Portland
Kg
- Pasir Beton
M3
- Koral Beton 2/3
M3
- Pekerja
Oh
- Tukang Batu
Oh
- Tukang Kayu
Oh
- Tukang Besi
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1 M3 Sloof Beton Tulang (200 kg besi + bekisting)
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Besi Beton
- Kawat Beton
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Pekerja
- Tukang Batu
- Tukang Kayu
- Tukang Besi
- Kepala Tukang
- Mandor
Jumlah
No.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
1 M3 Sloof Beton Tulang 20/30 (150 kg besi + bekisting) Struktur bertingkat 4dia.16 8-15
- Kayu papan terentang
M3
0.2700
2,950,000.00
- Paku Biasa 2" - 5"
Kg
2.0000
24,000.00
- Minyak Bekisting
Ltr
57,500.00
- Besi Beton
Kg
150.0000
16,500.00
- Kawat Beton
Kg
3.0000
30,500.00
- Semen Portland
Kg
323.0000
1,488.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
218,268.00
- Pekerja
Oh
4.8500
66,750.00
- Tukang Batu
Oh
0.3500
100,100.00
- Tukang Kayu
Oh
1.5600
100,100.00
- Tukang Besi
Oh
1.4000
100,100.00
- Kepala Tukang
Oh
0.3310
106,700.00
- Mandor
Oh
0.1700
120,100.00
Jumlah
Dibulatkan
1 M3 Sloof Beton Tulang 20/30 (200 kg besi + bekisting) Struktur bertingkat 6dia.16 8-15
- Kayu papan terentang
M3
0.2700
2,950,000.00
- Paku Biasa 2" - 5"
Kg
2.0000
24,000.00
- Minyak Bekisting
Ltr
57,500.00
- Besi Beton
Kg
200.0000
16,500.00
- Kawat Beton
Kg
3.0000
30,500.00
- Semen Portland
Kg
323.0000
1,488.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
218,268.00
- Pekerja
Oh
4.8500
66,750.00
- Tukang Batu
Oh
0.3500
100,100.00
- Tukang Kayu
Oh
1.5600
100,100.00
- Tukang Besi
Oh
1.4000
100,100.00
- Kepala Tukang
Oh
0.3310
106,700.00
- Mandor
Oh
0.1700
120,100.00
Jumlah
Dibulatkan
1 M3 Sloof Beton Tulang 20/40 (240 kg besi + bekisting) Struktur bertingkat
- Kayu papan terentang
M3
0.2700
- Paku Biasa 2" - 5"
Kg
2.0000
- Minyak Bekisting
Ltr
0.6000
- Besi Beton
Kg
240.0000
- Kawat Beton
Kg
3.0000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Pekerja
Oh
4.8500
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
1.5600
- Tukang Besi
Oh
1.4000
- Kepala Tukang
Oh
0.3310
- Mandor
Oh
0.1700
Jumlah
2,950,000.00
24,000.00
57,500.00
16,500.00
30,500.00
1,488.00
255,400.00
218,268.00
66,750.00
100,100.00
100,100.00
100,100.00
106,700.00
120,100.00
Dibulatkan
D-18
0.4000
4.0000
2,850,000.00
23,400.00
No.
URAIAN
- Minyak Bekisting
- Besi Beton
- Kawat Beton
SATUAN
Ltr
Kg
Kg
VOLUME
2.0000
120.0000
1.8000
HARGA SATUAN
(Rp)
55,000.00
16,500.00
27,700.00
No.
URAIAN
-
D-18r
Semen Portland
Pasir Beton
Koral Beton 2/3
Kayu Balok Terentang
Plywood Tebal 9 mm
Dolken -8-10/4m
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
SATUAN
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
VOLUME
323.0000
0.5200
0.7800
0.1500
3.5000
20.0000
7.3000
0.3500
3.3000
2.1000
0.5700
0.2500
Dibulatkan
1 M3 Kolom Beton Tulang 18/18 (170 kg besi + bekisting) 6dia. 10 8-15
- Kayu papan terentang
M3
0.4000
- Paku Biasa 2" - 5"
Kg
4.0000
- Minyak Bekisting
Ltr
- Besi Beton
Kg
170.0000
- Kawat Beton
Kg
1.8000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
0.1500
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
- Dolken -8-10/4m
Btg
20.0000
- Pekerja
Oh
7.3000
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
3.3000
- Tukang Besi
Oh
2.1000
- Kepala Tukang
Oh
0.5700
- Mandor
Oh
0.2500
Jumlah
Dibulatkan
HARGA SATUAN
(Rp)
1,406.00
255,400.00
211,100.00
2,640,000.00
235,000.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
166,500.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
2,950,000.00
24,000.00
55,000.00
16,500.00
30,500.00
1,488.00
255,400.00
218,268.00
2,705,000.00
166,500.00
30,800.00
66,750.00
100,100.00
100,100.00
100,100.00
106,700.00
120,100.00
No.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
Jumlah
Dibulatkan
2,950,000.00
24,000.00
55,000.00
16,500.00
30,500.00
1,488.00
255,400.00
218,268.00
2,705,000.00
166,500.00
30,800.00
66,750.00
100,100.00
100,100.00
100,100.00
106,700.00
120,100.00
Dibulatkan
1 M3 Kolom Beton Tulang Praktis 12/12 (260 kg besi + bekisting) 4dia.10 8-15
- Kayu papan terentang
M3
0.4000
- Paku Biasa 2" - 5"
Kg
4.0000
- Minyak Bekisting
Ltr
- Besi Beton
Kg
260.0000
- Kawat Beton
Kg
1.8000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
- MultiPlek 9 mm 120 x 240
Lbr
- Dolken -8-10/4m
Btg
20.0000
- Pekerja
Oh
7.3000
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
3.3000
- Tukang Besi
Oh
2.1000
- Kepala Tukang
Oh
0.5700
- Mandor
Oh
0.2500
Jumlah
Dibulatkan
2,950,000.00
24,000.00
55,000.00
16,500.00
30,500.00
1,488.00
255,400.00
218,268.00
2,705,000.00
166,500.00
30,800.00
66,750.00
100,100.00
100,100.00
100,100.00
106,700.00
120,100.00
1 M3 Kolom Beton Tulang 20/20 (210 kg besi + bekisting) Struktur bertingkat 4dia.16 8-15
- Kayu papan terentang
M3
0.4000
2,950,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
24,000.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
210.0000
16,500.00
- Kawat Beton
Kg
1.8000
30,500.00
No.
URAIAN
-
Semen Portland
Pasir Beton
Koral Beton 2/3
Kayu Balok Terentang
MultiPlek 9 mm 120 x 240
Dolken -8-10/4m
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
SATUAN
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
VOLUME
323.0000
0.5200
0.7800
0.1500
3.5000
20.0000
7.3000
0.3500
3.3000
2.1000
0.5700
0.2500
HARGA SATUAN
(Rp)
1,488.00
255,400.00
218,268.00
2,705,000.00
166,500.00
30,800.00
66,750.00
100,100.00
100,100.00
100,100.00
106,700.00
120,100.00
Dibulatkan
1 M3 Kolom Beton Tulang 20/20 (198 kg besi + bekisting) Struktur bertingkat 4dia.16 8-15
- Kayu papan terentang
M3
0.4000
2,950,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
24,000.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
198.0000
16,500.00
- Kawat Beton
Kg
1.8000
30,500.00
- Semen Portland
Kg
323.0000
1,488.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
218,268.00
- Kayu Balok Terentang
M3
0.1500
2,705,000.00
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
166,500.00
- Dolken -8-10/4m
Btg
20.0000
30,800.00
- Pekerja
Oh
7.3000
66,750.00
- Tukang Batu
Oh
0.3500
100,100.00
- Tukang Kayu
Oh
3.3000
100,100.00
- Tukang Besi
Oh
2.1000
100,100.00
- Kepala Tukang
Oh
0.5700
106,700.00
- Mandor
Oh
0.2500
120,100.00
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang 20/30 (230 kg besi + bekisting) Struktur bertingkat 6dia.16 +2dia.12, 8-15
- Kayu papan terentang
M3
0.4000
2,950,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
24,000.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
230.0000
16,500.00
- Kawat Beton
Kg
1.8000
30,500.00
- Semen Portland
Kg
323.0000
1,488.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
218,268.00
- Kayu Balok Terentang
M3
0.1500
2,705,000.00
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
166,500.00
- Dolken -8-10/4m
Btg
20.0000
30,800.00
- Pekerja
Oh
7.3000
66,750.00
- Tukang Batu
Oh
0.3500
100,100.00
- Tukang Kayu
Oh
3.3000
100,100.00
- Tukang Besi
Oh
2.1000
100,100.00
- Kepala Tukang
Oh
0.5700
106,700.00
- Mandor
Oh
0.2500
120,100.00
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang 20/40 (250 kg besi + bekisting) Struktur bertingkat
- Kayu papan terentang
M3
0.4000
- Paku Biasa 2" - 5"
Kg
4.0000
- Minyak Bekisting
Ltr
2.0000
- Besi Beton
Kg
250.0000
- Kawat Beton
Kg
1.8000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
0.1500
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
- Dolken -8-10/4m
Btg
20.0000
- Pekerja
Oh
7.3000
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
3.3000
- Tukang Besi
Oh
2.1000
- Kepala Tukang
Oh
0.5700
- Mandor
Oh
0.2500
2,950,000.00
24,000.00
55,000.00
16,500.00
30,500.00
1,488.00
255,400.00
218,268.00
2,705,000.00
166,500.00
30,800.00
66,750.00
100,100.00
100,100.00
100,100.00
106,700.00
120,100.00
No.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang 30/30 (175 kg besi + bekisting) Struktur bertingkat 8dia.16, 8-15
- Kayu papan terentang
M3
0.4000
2,950,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
24,000.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
175.0000
16,500.00
- Kawat Beton
Kg
1.8000
30,500.00
- Semen Portland
Kg
323.0000
1,488.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
218,268.00
- Kayu Balok Terentang
M3
0.1500
2,705,000.00
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
166,500.00
- Dolken -8-10/4m
Btg
20.0000
30,800.00
- Pekerja
Oh
7.3000
66,750.00
- Tukang Batu
Oh
0.3500
100,100.00
- Tukang Kayu
Oh
3.3000
100,100.00
- Tukang Besi
Oh
2.1000
100,100.00
- Kepala Tukang
Oh
0.5700
106,700.00
- Mandor
Oh
0.2500
120,100.00
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang 30/30 (210 kg besi + bekisting) Struktur bertingkat 10dia.16, 8-15
- Kayu papan terentang
M3
0.4000
2,950,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
24,000.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
210.0000
16,500.00
- Kawat Beton
Kg
1.8000
30,500.00
- Semen Portland
Kg
323.0000
1,488.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
218,268.00
- Kayu Balok Terentang
M3
0.1500
2,705,000.00
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
166,500.00
- Dolken -8-10/4m
Btg
20.0000
30,800.00
- Pekerja
Oh
7.3000
66,750.00
- Tukang Batu
Oh
0.3500
100,100.00
- Tukang Kayu
Oh
3.3000
100,100.00
- Tukang Besi
Oh
2.1000
100,100.00
- Kepala Tukang
Oh
0.5700
106,700.00
- Mandor
Oh
0.2500
120,100.00
Jumlah
Dibulatkan
2,950,000.00
24,000.00
55,000.00
16,500.00
30,500.00
1,488.00
255,400.00
218,268.00
2,705,000.00
166,500.00
30,800.00
66,750.00
100,100.00
100,100.00
100,100.00
106,700.00
120,100.00
No.
URAIAN
D-19
D-20
SATUAN
Dibulatkan
1 M3 Kolom Beton Tulang (150 kg besi + bekisting)
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Besi Beton
- Kawat Beton
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Kayu Balok Terentang
- MultiPlek 9 mm 120 x 240
- Dolken -8-10/4m
- Pekerja
- Tukang Batu
- Tukang Kayu
- Tukang Besi
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
VOLUME
HARGA SATUAN
(Rp)
M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
0.4000
4.0000
2.0000
140.0000
2.1000
323.0000
0.5200
0.7800
0.1500
3.5000
20.0000
7.3000
0.3500
3.3000
2.1000
0.5700
0.2500
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
166,500.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
0.4000
4.0000
2.0000
150.0000
2.4000
323.0000
0.5200
0.7800
0.1500
3.5000
20.0000
7.3000
0.3500
3.3000
2.1000
0.5700
0.2500
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
166,500.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
No.
URAIAN
D-21
D-22
D-23
SATUAN
Dibulatkan
1 M3 Kolom Beton Tulang (200 kg besi + bekisting)
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Besi Beton
- Kawat Beton
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Kayu Balok Terentang
- MultiPlek 9 mm 120 x 240
- Dolken -8-10/4m
- Pekerja
- Tukang Batu
- Tukang Kayu
- Tukang Besi
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang (250 kg besi + bekisting)
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Besi Beton
- Kawat Beton
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Kayu Balok Terentang
- MultiPlek 9 mm 120 x 240
- Dolken -8-10/4m
VOLUME
HARGA SATUAN
(Rp)
M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
0.4000
4.0000
2.0000
180.0000
2.7000
323.0000
0.5200
0.7800
0.1500
3.5000
20.0000
7.3000
0.3500
3.3000
2.1000
0.5700
0.2500
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
166,500.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
0.4000
4.0000
2.0000
200.0000
3.0000
323.0000
0.5200
0.7800
0.1500
3.5000
20.0000
7.3000
0.3500
3.3000
2.1000
0.5700
0.2500
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
166,500.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
0.4000
4.0000
2.0000
250.0000
3.7500
323.0000
0.5200
0.7800
0.1500
3.5000
20.0000
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
166,500.00
28,000.00
No.
URAIAN
SATUAN
D-24
D-25
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang (300 kg besi + bekisting)
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Besi Beton
- Kawat Beton
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Kayu Balok Terentang
- MultiPlek 9 mm 120 x 240
- Dolken -8-10/4m
- Pekerja
- Tukang Batu
- Tukang Kayu
- Tukang Besi
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M3 Balok Beton Tulang (120 kg besi + bekisting)
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Besi Beton
- Kawat Beton
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Kayu Balok Terentang
- MultiPlek 9 mm 120 x 240
- Dolken -8-10/4m
- Pekerja
- Tukang Batu
- Tukang Kayu
- Tukang Besi
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
VOLUME
Oh
Oh
Oh
Oh
Oh
Oh
7.3000
0.3500
3.3000
2.1000
0.5700
0.2500
HARGA SATUAN
(Rp)
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
0.4000
4.0000
2.0000
300.0000
4.5000
323.0000
0.5200
0.7800
0.1500
3.5000
20.0000
7.3000
0.3500
3.3000
2.1000
0.5700
0.2500
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
166,500.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
0.3200
3.2000
1.6000
120.0000
1.8000
323.0000
0.5200
0.7800
0.1400
2.8000
16.0000
5.9600
0.3500
2.8000
1.4000
0.4550
0.2080
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
166,500.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
No.
D-26
D-26
URAIAN
SATUAN
VOLUME
0.3200
3.2000
1.6000
150.0000
2.2500
323.0000
0.5200
0.7800
0.1400
2.8000
16.0000
5.9600
0.3500
2.8000
1.4000
0.4550
0.2080
Dibulatkan
1 M3 Balok Beton Tulang 13/18 (220 kg besi + bekisting) 6dia. 10, 8-15
- Kayu papan terentang
M3
0.3200
- Paku Biasa 2" - 5"
Kg
3.2000
- Minyak Bekisting
Ltr
- Besi Beton
Kg
220.0000
- Kawat Beton
Kg
2.2500
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
0.1400
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
- Dolken -8-10/4m
Btg
16.0000
- Pekerja
Oh
5.9600
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
2.8000
- Tukang Besi
Oh
1.4000
- Kepala Tukang
Oh
0.4550
- Mandor
Oh
0.2080
Jumlah
HARGA SATUAN
(Rp)
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
166,500.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
166,500.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
Dibulatkan
1 M3 Balok Beton Tulang 15/20 sofi-sofi, ring balk + balok poratl (180 kg besi + bekisting) 4dia. 12, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
180.0000
16,500.00
- Kawat Beton
Kg
2.2500
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
166,500.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
- Pekerja
Oh
5.9600
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
2.8000
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.4550
75,000.00
- Mandor
Oh
0.2080
80,000.00
Jumlah
Dibulatkan
1 M3 Balok Beton Tulang 15/25 (175 kg besi + bekisting) Struktur bertingkat 5 dia. 12, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
No.
URAIAN
-
Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton 2/3
Kayu Balok Terentang
MultiPlek 9 mm 120 x 240
Dolken -8-10/4m
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
SATUAN
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
VOLUME
175.0000
2.2500
323.0000
0.5200
0.7800
0.1400
2.8000
16.0000
5.9600
0.3500
2.8000
1.4000
0.4550
0.2080
HARGA SATUAN
(Rp)
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
166,500.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
Dibulatkan
1 M3 Balok Beton Tulang 15/30 (172 kg besi + bekisting) Struktur bertingkat 6 dia. 12, 8-15
- Paku Biasa 2" - 5"
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Kawat Beton
Kg
172.0000
16,500.00
- Kawat Beton
Kg
2.2500
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.1400
211,100.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
166,500.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
- Pekerja
Oh
0.3500
42,000.00
- Tukang Batu
Oh
2.8000
65,000.00
- Tukang Kayu
Oh
1.4000
65,000.00
- Tukang Besi
Oh
0.4550
65,000.00
- Kepala Tukang
Oh
0.2080
75,000.00
- Mandor
Oh
0.2080
80,000.00
Jumlah
Dibulatkan
D-27
D-27
1 M3 Balok Beton Tulang 20/40 (200 kg besi + bekisting) Struktur bertingkat 7dia.16+2dia.12, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
200.0000
16,500.00
- Kawat Beton
Kg
3.0000
27,700.00
- Semen Portland
Kg
323.0000
1,488.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
151,100.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
- Pekerja
Oh
5.9600
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
2.8000
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.4550
75,000.00
- Mandor
Oh
0.2080
80,000.00
Jumlah
Dibulatkan
1 M3 Balok Beton Tulang 20/35 (177 kg besi + bekisting) Struktur bertingkat 6 dia.16 dia. 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
177.0000
16,500.00
- Kawat Beton
Kg
3.0000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
151,100.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
- Pekerja
Oh
5.9600
42,000.00
No.
URAIAN
-
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
Dibulatkan
SATUAN
Oh
Oh
Oh
Oh
Oh
VOLUME
0.3500
2.8000
1.4000
0.4550
0.2080
HARGA SATUAN
(Rp)
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
1 M3 Balok Beton Tulang 20/30 (200 kg besi + bekisting) Struktur bertingkat 6dia. 16, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
200.0000
16,500.00
- Kawat Beton
Kg
3.0000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
166,500.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
- Pekerja
Oh
5.9600
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
2.8000
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.4550
75,000.00
- Mandor
Oh
0.2080
80,000.00
Jumlah
Dibulatkan
1 M3 Balok Beton Tulang 20/30 (175 kg besi + bekisting) Struktur bertingkat 5dia. 16, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
Besi Beton
Kg
175.0000
16,500.00
- Kawat Beton
Kg
3.0000
55,000.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
166,500.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
- Pekerja
Oh
5.9600
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
2.8000
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.4550
75,000.00
- Mandor
Oh
0.2080
80,000.00
Jumlah
Dibulatkan
1 M3 Balok Beton Tulang 25/55 (140 kg besi + bekisting) Struktur bertingkat 8dia.16 +2dia.12, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
140.0000
16,500.00
- Kawat Beton
Kg
3.0000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
151,100.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
- Pekerja
Oh
5.9600
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
2.8000
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.4550
75,000.00
No.
URAIAN
SATUAN
- Mandor
Jumlah
Oh
VOLUME
0.2080
HARGA SATUAN
(Rp)
80,000.00
Dibulatkan
1 M3 Balok Beton Tulang 30/60 (130 kg besi + bekisting) Struktur bertingkat 10dia.16 +2dia.12, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
130.0000
16,500.00
- Kawat Beton
Kg
3.0000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
151,100.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
- Pekerja
Oh
5.9600
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
2.8000
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.4550
75,000.00
- Mandor
Oh
0.2080
80,000.00
Jumlah
Dibulatkan
1 M3 Balok Beton Lintel 11/11 (300 kg besi + bekisting) 4dia.10 8-15
- Kayu papan terentang
M3
0.4000
- Paku Biasa 2" - 5"
Kg
4.0000
- Minyak Bekisting
Ltr
- Besi Beton
Kg
300.0000
- Kawat Beton
Kg
1.8000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
- MultiPlek 9 mm 120 x 240
Lbr
- Dolken -8-10/4m
Btg
20.0000
- Pekerja
Oh
7.3000
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
3.3000
- Tukang Besi
Oh
2.1000
- Kepala Tukang
Oh
0.5700
- Mandor
Oh
0.2500
Jumlah
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
Dibulatkan
D-28
M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
0.3200
3.2000
1.6000
230.0000
3.4500
323.0000
0.5200
0.7800
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,488.00
255,400.00
211,100.00
No.
URAIAN
-
SATUAN
M3
Lbr
Btg
Oh
VOLUME
0.1400
2.8000
16.0000
5.9600
HARGA SATUAN
(Rp)
2,640,000.00
151,100.00
28,000.00
42,000.00
No.
URAIAN
Oh
Oh
Oh
Oh
Oh
0.3500
2.8000
1.4000
0.4550
0.2080
HARGA SATUAN
(Rp)
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
0.2500
3.0000
1.2000
200.0000
3.0000
323.0000
0.5200
0.7800
0.1050
2.5000
14.0000
5.6000
0.3500
2.3000
1.4000
0.4050
0.2020
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,488.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
Dibulatkan
1 M3 Pelat Lantai Beton Tulang T= 10 cm (90 kg besi + bekisting)
- Beton tulang ad. 1Pc : 2Ps : 3Kr
M3
1.0000
- Pasang Bekisting untuk lantai
M2
10.0000
- Besi Beton Polos
Kg
90.0000
Jumlah
Dibulatkan
1,048,404.74
480,049.70
19,061.17
1,048,404.74
480,049.70
19,061.17
D-29
D-30
D-31
SATUAN
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 M3 Tangga Beton Tulang (200 kg besi + bekisting)
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Besi Beton
- Kawat Beton
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Kayu Balok Terentang
- Plywood Tebal 9 mm
- Dolken -8-10/4m
- Pekerja
- Tukang Batu
- Tukang Kayu
- Tukang Besi
- Kepala Tukang
- Mandor
Jumlah
VOLUME
Dibulatkan
1 M3 Pelat Lantai Beton Tulang T= 12 cm (130 kg besi + bekisting) dia.10-20
- Beton bertulang ad. 1Pc : 2Ps : 3Kr
M3
1.0000
- Pasang Bekisting untuk lantai
M2
8.3300
- Besi Beton Polos
Kg
130.0000
Jumlah
1,048,404.74
480,049.70
19,061.17
Dibulatkan
D-32
D-33
1,048,404.74
480,049.70
19,061.17
Dibulatkan
1 M3 Pelat Lantai Beton Tulang T= 15 cm (90 kg besi + bekisting)
- Beton bertulang ad. 1Pc : 2Ps : 3Kr
M3
1.0000
- Pasang Bekisting untuk lantai
M2
6.6700
- Besi Beton Polos
Kg
90.0000
Jumlah
Dibulatkan
1,048,404.74
480,049.70
19,061.17
No.
D-34
D-35
D-36
D-37
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
1,048,404.74
480,049.70
19,061.17
M3
Kg
Kg
Kg
Kg
M3
M3
Oh
Oh
Oh
Oh
Oh
Oh
0.0020
0.0100
3.0000
0.0450
4.0000
0.0060
0.0090
0.0600
0.0200
0.0200
0.0200
0.0060
0.0030
2,850,000.00
23,400.00
16,500.00
27,700.00
1,488.00
255,400.00
211,100.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
M3
Kg
Kg
Kg
Kg
M3
M3
Oh
Oh
Oh
Oh
Oh
Oh
0.0030
0.0200
3.6000
0.0500
5.5000
0.0090
0.0150
0.1000
0.0330
0.0330
0.0330
0.0100
0.0050
2,850,000.00
23,400.00
16,500.00
27,700.00
1,488.00
255,400.00
211,100.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
M3
Kg
Ltr
M3
Lbr
Btg
Buah
Oh
Oh
Oh
Oh
0.0300
0.4000
0.2000
0.0200
0.3500
3.0000
4.0000
0.3200
0.0330
0.0330
0.0060
2,850,000.00
1,488.00
55,000.00
2,640,000.00
151,100.00
28,000.00
2,800.00
66,750.00
100,100.00
106,700.00
120,100.00
No.
URAIAN
D-38
D-39
D-40
SATUAN
M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
Dibulatkan
1 M3 Dinding Beton Tulang (150 kg besi + bekisting)
- Kayu papan terentang
M3
- Paku Biasa 2" - 5"
Kg
- Minyak Bekisting
Ltr
- Besi Beton
Kg
- Kawat Beton
Kg
- Semen Portland
Kg
- Pasir Beton
M3
- Koral Beton 2/3
M3
- Kayu Balok Terentang
M3
- Plywood Tebal 9 mm
Lbr
- Dolken -8-10/4m
Btg
- Pekerja
Oh
- Tukang Batu
Oh
- Tukang Kayu
Oh
- Tukang Besi
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1 M3 Dinding Beton Tulang (200 kg besi + bekisting)
- Kayu papan terentang
M3
- Paku Biasa 2" - 5"
Kg
- Minyak Bekisting
Ltr
- Besi Beton
Kg
- Kawat Beton
Kg
- Semen Portland
Kg
- Pasir Beton
M3
- Koral Beton 2/3
M3
VOLUME
HARGA SATUAN
(Rp)
0.3200
3.2000
1.6000
150.0000
2.2500
323.0000
0.5200
0.7800
0.1200
2.8000
32.0000
5.3000
0.3500
1.3000
1.0500
0.2650
0.2650
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,488.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
0.2400
3.2000
1.6000
150.0000
2.2500
323.0000
0.5200
0.7800
0.1600
2.8000
24.0000
5.6000
0.3500
2.6400
1.0500
0.4000
0.1930
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,488.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
0.2500
3.0000
1.2000
200.0000
3.0000
323.0000
0.5200
0.7800
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,488.00
255,400.00
211,100.00
No.
URAIAN
-
D-41
D-42
D-43
Dibulatkan
1 M3 Membuat Beton Cor Mutu K-300
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M3 Membuat Beton Cor Mutu K-200
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M3 Membuat Beton Cor Mutu K-250
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
SATUAN
VOLUME
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
0.1050
2.8000
14.0000
5.6500
0.3500
1.5600
1.4000
0.3230
0.2830
HARGA SATUAN
(Rp)
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
Kg
M3
M3
Oh
Oh
Oh
Oh
413.0000
0.4256
0.6807
1.6500
0.2750
0.0280
0.0830
1,488.00
255,400.00
211,100.00
42,000.00
100,100.00
75,000.00
80,000.00
Kg
M3
M3
Oh
Oh
Oh
Oh
352.0000
0.4569
0.6873
1.6500
0.2750
0.0280
0.0830
1,488.00
255,400.00
211,100.00
42,000.00
100,100.00
75,000.00
80,000.00
Kg
M3
M3
Oh
Oh
Oh
Oh
384.0000
0.4325
0.6927
1.6500
0.2750
0.0280
0.0830
1,488.00
255,400.00
211,100.00
42,000.00
100,100.00
75,000.00
80,000.00
JAAN BETON
HARGA
(Rp)
324,384.00
132,808.00
189,893.16
110,137.50
25,025.00
2,667.50
9,608.00
794,523.16
794,523.00
293,136.00
120,038.00
205,171.92
110,137.50
25,025.00
2,667.50
9,608.00
765,783.92
765,784.00
499,968.00
137,916.00
176,797.08
133,500.00
35,035.00
3,734.50
120,100.00
1,107,050.58
1,107,051.00
654,720.00
127,700.00
174,614.40
43,050.00
110,137.50
25,025.00
2,667.50
9,608.00
1,147,522.40
1,147,522.00
HARGA
(Rp)
63,000.00
3,337.50
3,503.50
373.45
240.20
70,454.65
70,455.00
118,000.00
7,200.00
20,025.00
26,026.00
2,774.20
600.50
174,625.70
174,626.00
132,750.00
7,200.00
20,025.00
26,026.00
2,774.20
600.50
189,375.70
189,376.00
118,000.00
9,600.00
40,575.00
58,275.00
61,600.00
20,025.00
33,033.00
3,521.10
720.60
345,349.70
345,350.00
HARGA
(Rp)
118,000.00
9,600.00
48,690.00
58,275.00
61,600.00
20,025.00
33,033.00
3,521.10
720.60
353,464.70
353,465.00
88,500.00
9,600.00
8,625.00
40,575.00
58,275.00
61,600.00
21,360.00
33,033.00
3,521.10
720.60
325,809.70
325,810.00
577,344.00
166,010.00
141,874.20
752,500.00
400,500.00
100,100.00
10,670.00
36,030.00
2,185,028.20
2,185,028.00
HARGA
(Rp)
595,200.00
102,160.00
178,979.76
752,500.00
400,500.00
100,100.00
10,670.00
36,030.00
2,176,139.76
2,176,140.00
590,000.00
36,000.00
2,475,000.00
68,625.00
480,624.00
132,808.00
170,249.04
260,325.00
35,035.00
104,104.00
105,105.00
26,141.50
19,816.50
4,503,833.04
4,503,833.00
796,500.00
48,000.00
34,500.00
3,300,000.00
91,500.00
480,624.00
132,808.00
170,249.04
323,737.50
35,035.00
156,156.00
140,140.00
35,317.70
20,417.00
5,764,984.24
5,764,984.00
796,500.00
48,000.00
34,500.00
2,475,000.00
91,500.00
480,624.00
132,808.00
170,249.04
323,737.50
35,035.00
156,156.00
140,140.00
35,317.70
20,417.00
4,939,984.24
4,939,984.00
HARGA
(Rp)
796,500.00
48,000.00
2,475,000.00
91,500.00
480,624.00
132,808.00
170,249.04
323,737.50
35,035.00
156,156.00
140,140.00
35,317.70
20,417.00
4,905,484.24
4,905,484.00
796,500.00
48,000.00
3,300,000.00
91,500.00
480,624.00
132,808.00
170,249.04
323,737.50
35,035.00
156,156.00
140,140.00
35,317.70
20,417.00
5,730,484.24
5,730,484.00
796,500.00
48,000.00
34,500.00
3,960,000.00
91,500.00
480,624.00
132,808.00
170,249.04
323,737.50
35,035.00
156,156.00
140,140.00
35,317.70
20,417.00
6,424,984.24
6,424,984.00
1,140,000.00
93,600.00
HARGA
(Rp)
110,000.00
1,980,000.00
49,860.00
HARGA
(Rp)
454,138.00
132,808.00
164,658.00
396,000.00
822,500.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
6,646,664.00
6,646,664.00
1,140,000.00
93,600.00
2,805,000.00
49,860.00
454,138.00
132,808.00
164,658.00
396,000.00
582,750.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,121,914.00
7,121,914.00
1,180,000.00
96,000.00
2,458,500.00
54,900.00
480,624.00
132,808.00
170,249.04
405,750.00
582,750.00
616,000.00
487,275.00
35,035.00
330,330.00
210,210.00
60,819.00
30,025.00
HARGA
(Rp)
7,331,275.04
7,331,275.00
1,180,000.00
96,000.00
3,465,000.00
54,900.00
480,624.00
132,808.00
170,249.04
616,000.00
487,275.00
35,035.00
330,330.00
210,210.00
60,819.00
30,025.00
7,349,275.04
7,349,275.00
1,180,000.00
96,000.00
4,290,000.00
54,900.00
480,624.00
132,808.00
170,249.04
616,000.00
487,275.00
35,035.00
330,330.00
210,210.00
60,819.00
30,025.00
8,174,275.04
8,174,275.00
1,180,000.00
96,000.00
3,465,000.00
54,900.00
HARGA
(Rp)
480,624.00
132,808.00
170,249.04
405,750.00
582,750.00
616,000.00
487,275.00
35,035.00
330,330.00
210,210.00
60,819.00
30,025.00
8,337,775.04
8,337,775.00
1,180,000.00
96,000.00
3,267,000.00
54,900.00
480,624.00
132,808.00
170,249.04
405,750.00
582,750.00
616,000.00
487,275.00
35,035.00
330,330.00
210,210.00
60,819.00
30,025.00
8,139,775.04
8,139,775.00
1,180,000.00
96,000.00
3,795,000.00
54,900.00
480,624.00
132,808.00
170,249.04
405,750.00
582,750.00
616,000.00
487,275.00
35,035.00
330,330.00
210,210.00
60,819.00
30,025.00
8,667,775.04
8,667,775.00
1,180,000.00
96,000.00
110,000.00
4,125,000.00
54,900.00
480,624.00
132,808.00
170,249.04
405,750.00
582,750.00
616,000.00
487,275.00
35,035.00
330,330.00
210,210.00
60,819.00
30,025.00
HARGA
(Rp)
9,107,775.04
9,107,775.00
1,180,000.00
96,000.00
2,887,500.00
54,900.00
480,624.00
132,808.00
170,249.04
405,750.00
582,750.00
616,000.00
487,275.00
35,035.00
330,330.00
210,210.00
60,819.00
30,025.00
7,760,275.04
7,760,275.00
1,180,000.00
96,000.00
3,465,000.00
54,900.00
480,624.00
132,808.00
170,249.04
405,750.00
582,750.00
616,000.00
487,275.00
35,035.00
330,330.00
210,210.00
60,819.00
30,025.00
8,337,775.04
8,337,775.00
1,180,000.00
96,000.00
110,000.00
3,300,000.00
54,900.00
480,624.00
132,808.00
170,249.04
405,750.00
582,750.00
616,000.00
487,275.00
35,035.00
330,330.00
210,210.00
60,819.00
30,025.00
8,282,775.04
8,282,775.00
HARGA
(Rp)
1,140,000.00
93,600.00
110,000.00
2,310,000.00
58,170.00
454,138.00
132,808.00
164,658.00
396,000.00
582,750.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
6,745,224.00
6,745,224.00
1,140,000.00
93,600.00
110,000.00
2,475,000.00
66,480.00
454,138.00
132,808.00
164,658.00
396,000.00
582,750.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
6,918,534.00
6,918,534.00
HARGA
(Rp)
1,140,000.00
93,600.00
110,000.00
2,970,000.00
74,790.00
454,138.00
132,808.00
164,658.00
396,000.00
582,750.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,421,844.00
7,421,844.00
1,140,000.00
93,600.00
110,000.00
3,300,000.00
83,100.00
454,138.00
132,808.00
164,658.00
396,000.00
582,750.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,760,154.00
7,760,154.00
1,140,000.00
93,600.00
110,000.00
4,125,000.00
103,875.00
454,138.00
132,808.00
164,658.00
396,000.00
582,750.00
560,000.00
HARGA
(Rp)
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
8,605,929.00
8,605,929.00
1,140,000.00
93,600.00
110,000.00
4,950,000.00
124,650.00
454,138.00
132,808.00
164,658.00
396,000.00
582,750.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
9,451,704.00
9,451,704.00
912,000.00
74,880.00
88,000.00
1,980,000.00
49,860.00
454,138.00
132,808.00
164,658.00
369,600.00
466,200.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
5,736,979.00
5,736,979.00
HARGA
(Rp)
912,000.00
74,880.00
88,000.00
2,475,000.00
62,325.00
454,138.00
132,808.00
164,658.00
369,600.00
466,200.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
6,244,444.00
6,244,444.00
912,000.00
74,880.00
3,630,000.00
62,325.00
454,138.00
132,808.00
164,658.00
369,600.00
466,200.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
7,311,444.00
7,311,444.00
912,000.00
74,880.00
2,970,000.00
62,325.00
454,138.00
132,808.00
164,658.00
369,600.00
466,200.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
6,651,444.00
6,651,444.00
912,000.00
74,880.00
-
HARGA
(Rp)
2,887,500.00
62,325.00
454,138.00
132,808.00
164,658.00
369,600.00
466,200.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
6,568,944.00
6,568,944.00
912,000.00
74,880.00
2,838,000.00
62,325.00
454,138.00
132,808.00
29,554.00
369,600.00
466,200.00
448,000.00
14,700.00
182,000.00
91,000.00
29,575.00
15,600.00
16,640.00
6,137,020.00
6,137,020.00
912,000.00
74,880.00
3,300,000.00
83,100.00
480,624.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
6,985,585.00
6,985,585.00
912,000.00
74,880.00
2,920,500.00
83,100.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
HARGA
(Rp)
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
6,579,599.00
6,579,599.00
912,000.00
74,880.00
3,300,000.00
83,100.00
454,138.00
132,808.00
164,658.00
369,600.00
466,200.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
7,002,219.00
7,002,219.00
912,000.00
74,880.00
2,887,500.00
165,000.00
454,138.00
132,808.00
164,658.00
369,600.00
466,200.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
6,671,619.00
6,671,619.00
912,000.00
74,880.00
2,310,000.00
83,100.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
HARGA
(Rp)
16,640.00
5,969,099.00
5,969,099.00
912,000.00
74,880.00
2,145,000.00
83,100.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
5,804,099.00
5,804,099.00
1,140,000.00
93,600.00
4,950,000.00
49,860.00
454,138.00
132,808.00
164,658.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
8,288,164.00
8,288,164.00
912,000.00
74,880.00
88,000.00
3,795,000.00
95,565.00
480,624.00
132,808.00
164,658.00
HARGA
(Rp)
369,600.00
423,080.00
448,000.00
250,320.00
HARGA
(Rp)
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
7,581,050.00
7,581,050.00
712,500.00
70,200.00
66,000.00
3,300,000.00
83,100.00
480,624.00
132,808.00
164,658.00
277,200.00
377,750.00
392,000.00
235,200.00
22,750.00
149,500.00
91,000.00
30,375.00
16,160.00
6,601,825.00
6,601,825.00
1,048,404.74
4,800,497.00
1,715,505.30
7,564,407.04
7,564,407.00
1,048,404.74
3,998,814.00
2,096,728.70
7,143,947.44
7,143,947.00
1,048,404.74
3,998,814.00
2,477,952.10
7,525,170.84
7,525,171.00
1,048,404.74
3,998,814.00
2,477,952.10
7,525,170.84
7,525,171.00
1,048,404.74
3,201,931.50
1,715,505.30
5,965,841.54
5,965,842.00
HARGA
(Rp)
1,048,404.74
3,201,931.50
2,192,034.55
6,442,370.79
6,442,371.00
5,700.00
234.00
49,500.00
1,246.50
5,952.00
1,532.40
1,899.90
2,520.00
1,300.00
1,300.00
1,300.00
450.00
240.00
73,174.80
73,175.00
8,550.00
468.00
59,400.00
1,385.00
8,184.00
2,298.60
3,166.50
4,200.00
2,145.00
2,145.00
2,145.00
750.00
400.00
95,237.10
95,237.00
85,500.00
595.20
11,000.00
52,800.00
52,885.00
84,000.00
11,200.00
21,360.00
3,303.30
3,521.10
720.60
326,885.20
326,885.00
HARGA
(Rp)
912,000.00
74,880.00
88,000.00
2,475,000.00
62,325.00
480,624.00
132,808.00
164,658.00
316,800.00
423,080.00
896,000.00
222,600.00
22,750.00
84,500.00
68,250.00
19,875.00
21,200.00
6,465,350.00
6,465,350.00
684,000.00
74,880.00
88,000.00
2,475,000.00
62,325.00
480,624.00
132,808.00
164,658.00
422,400.00
423,080.00
672,000.00
235,200.00
22,750.00
171,600.00
68,250.00
30,000.00
15,440.00
6,223,015.00
6,223,015.00
712,500.00
70,200.00
66,000.00
3,300,000.00
83,100.00
480,624.00
132,808.00
164,658.00
HARGA
(Rp)
277,200.00
423,080.00
392,000.00
237,300.00
22,750.00
101,400.00
91,000.00
24,225.00
22,640.00
6,601,485.00
6,601,485.00
614,544.00
108,704.63
143,688.73
69,300.00
27,527.50
2,100.00
6,640.00
972,504.86
972,505.00
523,776.00
116,685.88
145,096.07
69,300.00
27,527.50
2,100.00
6,640.00
891,125.44
891,125.00
571,392.00
110,460.50
146,221.93
69,300.00
27,527.50
2,100.00
6,640.00
933,641.93
933,642.00
Semen Portland
Kg
Pasir Pasang
M3
Pekerja
Oh
Tukang Batu
Oh
Kepala Tukang
Oh
Mandor
Oh
Jumlah
Dibulatkan
E-05 1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 4ps
- Bata Merah
Bh
- Semen Portland
Kg
- Pasir Pasang
M3
- Pekerja
Oh
- Tukang Batu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
140.0000
32.9500
0.0910
0.6500
0.2000
0.0200
0.0300
750.00
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
105,000.00
49,029.60
21,239.40
43,387.50
20,020.00
2,134.00
3,603.00
244,413.50
244,414.00
140.0000
26.5500
0.0930
0.6500
0.2000
0.0200
0.0300
750.00
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
105,000.00
39,506.40
21,706.20
43,387.50
20,020.00
2,134.00
3,603.00
235,357.10
235,357.00
140.0000
22.2000
0.1020
0.6500
0.2000
0.0200
0.0300
750.00
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
105,000.00
33,033.60
23,806.80
43,387.50
20,020.00
2,134.00
3,603.00
230,984.90
230,985.00
70.0000
750.00
52,500.00
14.3700
0.0400
0.3200
0.1000
0.0100
0.0150
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
21,382.56
9,336.00
21,360.00
10,010.00
1,067.00
1,801.50
117,457.06
117,457.00
70.0000
11.5000
0.0430
0.3200
0.1000
0.0100
0.0150
750.00
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
52,500.00
17,112.00
10,036.20
21,360.00
10,010.00
1,067.00
1,801.50
113,886.70
113,887.00
36.0000
12.8000
0.0350
0.3000
0.1000
0.0100
0.0150
576,000.00
19,046.40
8,169.00
20,025.00
10,010.00
1,067.00
1,801.50
636,118.90
636,119.00
36.0000
11.0000
0.0350
0.3000
0.1000
0.0100
0.0150
16,000.00
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
576,000.00
16,368.00
8,169.00
20,025.00
10,010.00
1,067.00
1,801.50
633,440.50
633,441.00
36.0000
12.8000
0.0350
0.3000
0.1000
0.0100
0.0150
16,000.00
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
576,000.00
19,046.40
8,169.00
20,025.00
10,010.00
1,067.00
1,801.50
636,118.90
Dibulatkan
E-10 1 M2 Pasang Dinding Batako Besar Pres uk. 8x20x30 adk. 1pc:4ps
- Batako
bh
13.0000
- PC
kg
12.0000
- Pasir Pasang
M3
0.0380
- Pekerja
Oh
0.3000
- Tukang Batu
Oh
0.1000
- Kepala Tukang
Oh
0.0100
- Mandor
Oh
0.0150
Jumlah
Dibulatkan
16,000.00
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
636,119.00
2,700.00
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
35,100.00
17,856.00
8,869.20
20,025.00
10,010.00
1,067.00
1,801.50
59,628.70
59,629.00
Bh
Kg
m3
Kg
Oh
Oh
Oh
Oh
12.5000
13.5000
0.0480
1.9500
0.3500
0.1500
0.0150
0.0170
5,700.00
1,488.00
233,400.00
16,500.00
66,750.00
100,100.00
106,700.00
120,100.00
71,250.00
20,088.00
11,203.20
32,175.00
23,362.50
15,015.00
1,600.50
2,041.70
176,735.90
176,736.00
Bh
Kg
m3
Kg
Oh
Oh
Oh
Oh
12.5000
10.4500
0.0380
1.9500
0.3200
0.1200
0.0120
0.0150
6,500.00
1,488.00
233,400.00
16,500.00
66,750.00
100,100.00
106,700.00
120,100.00
81,250.00
15,549.60
8,869.20
32,175.00
21,360.00
12,012.00
1,280.40
1,801.50
174,297.70
174,298.00
Bh
Kg
m3
Kg
Oh
Oh
Oh
Oh
12.5000
7.5000
0.0270
1.9500
0.3200
0.1200
0.0120
0.0150
3,500.00
1,488.00
233,400.00
16,500.00
66,750.00
100,100.00
106,700.00
120,100.00
43,750.00
11,160.00
6,301.80
32,175.00
21,360.00
12,012.00
1,280.40
1,801.50
129,840.70
129,841.00
Bh
Kg
M3
M3
Kg
kg
M3
kg
M3
Oh
Oh
Oh
Oh
Oh
12.5000
14.0500
0.0040
0.0420
3.8700
0.0060
0.0010
0.0300
0.0050
0.3700
0.1570
0.0070
0.0164
0.0185
5,700.00
1,488.00
255,400.00
233,400.00
16,500.00
23,400.00
2,850,000.00
27,700.00
211,100.00
66,750.00
100,100.00
106,700.00
106,700.00
120,100.00
71,250.00
20,906.40
1,021.60
9,802.80
63,855.00
140.40
2,850.00
831.00
1,055.50
24,697.50
15,715.70
746.90
1,749.88
2,221.85
216,844.53
216,845.00
Bh
Kg
M3
M3
Kg
kg
M3
kg
M3
Oh
Oh
Oh
Oh
Oh
12.5000
10.4600
0.0030
0.0320
0.8700
0.0040
0.0010
0.0200
0.0040
0.3400
0.1300
0.0070
0.0137
0.0170
6,500.00
1,488.00
255,400.00
233,400.00
16,500.00
23,400.00
2,850,000.00
27,700.00
211,100.00
66,750.00
100,100.00
106,700.00
106,700.00
120,100.00
81,250.00
15,564.48
766.20
7,468.80
14,355.00
93.60
2,850.00
554.00
844.40
22,695.00
13,013.00
746.90
1,461.79
2,041.70
163,704.87
163,705.00
Bh
Kg
M3
M3
Kg
kg
M3
kg
M3
Oh
Oh
Oh
Oh
Oh
12.5000
10.4600
0.0030
0.0320
0.8700
0.0040
0.0010
0.0200
0.0040
0.3400
0.1300
0.0070
0.0137
0.0170
3,500.00
1,488.00
255,400.00
233,400.00
16,500.00
23,400.00
2,850,000.00
27,700.00
211,100.00
66,750.00
100,100.00
106,700.00
106,700.00
120,100.00
43,750.00
15,564.48
766.20
7,468.80
14,355.00
93.60
2,850.00
554.00
844.40
22,695.00
13,013.00
746.90
1,461.79
2,041.70
126,204.87
Dibulatkan
E-17 1 M2 Dinding Keramik Corak 10 x 20 cm Setara Mulia
- Keramik Corak 10 x 20 cm
m2
- Semen abu-abu
Kg
- Pasir pasang
M3
- Semen warna
Kg
- Pekerja
Oh
- Tukang batu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
E-18 1 M2 Dinding Keramik polos 10 x 20 cm Setara Mulia
- Keramik 10 x 20 cm
m2
- Semen abu-abu
Kg
- Pasir pasang
M3
- Semen warna
Kg
- Pekerja
Oh
- Tukang batu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
126,205.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
75,000.00
1,488.00
233,400.00
15,000.00
66,750.00
100,100.00
106,700.00
120,100.00
75,000.00
11,904.00
4,201.20
195.00
12,515.63
37,537.50
4,801.50
2,257.88
148,412.71
148,413.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
70,000.00
1,488.00
233,400.00
15,000.00
66,750.00
100,100.00
106,700.00
120,100.00
70,000.00
11,904.00
4,201.20
195.00
12,515.63
37,537.50
4,801.50
2,257.88
143,412.71
143,413.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
60,000.00
1,488.00
233,400.00
15,000.00
66,750.00
100,100.00
106,700.00
120,100.00
133,413.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
70,000.00
1,488.00
233,400.00
15,000.00
66,750.00
100,100.00
106,700.00
120,100.00
Dibulatkan
70,000.00
11,904.00
4,201.20
195.00
12,515.63
37,537.50
4,801.50
2,257.88
143,412.71
143,413.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
62,500.00
1,488.00
233,400.00
15,000.00
66,750.00
100,100.00
106,700.00
120,100.00
Dibulatkan
60,000.00
11,904.00
4,201.20
195.00
12,515.63
37,537.50
4,801.50
2,257.88
133,412.71
62,500.00
11,904.00
4,201.20
195.00
12,515.63
37,537.50
4,801.50
2,257.88
135,912.71
135,913.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
60,000.00
1,488.00
233,400.00
15,000.00
66,750.00
100,100.00
106,700.00
120,100.00
60,000.00
11,904.00
4,201.20
195.00
12,515.63
37,537.50
4,801.50
2,257.88
133,412.71
133,413.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
65,500.00
1,488.00
233,400.00
15,000.00
66,750.00
100,100.00
106,700.00
120,100.00
65,500.00
11,904.00
4,201.20
195.00
12,515.63
37,537.50
4,801.50
2,257.88
138,912.71
138,913.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
55,500.00
1,488.00
233,400.00
15,000.00
66,750.00
100,100.00
106,700.00
120,100.00
55,500.00
11,904.00
4,201.20
195.00
12,515.63
37,537.50
4,801.50
2,257.88
128,912.71
128,913.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
57,000.00
1,488.00
233,400.00
15,000.00
66,750.00
100,100.00
106,700.00
120,100.00
57,000.00
11,904.00
4,201.20
195.00
12,515.63
37,537.50
4,801.50
2,257.88
130,412.71
130,413.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
66,000.00
1,488.00
233,400.00
15,000.00
66,750.00
100,100.00
106,700.00
120,100.00
66,000.00
11,904.00
4,201.20
195.00
12,515.63
37,537.50
4,801.50
2,257.88
139,412.71
139,413.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
67,500.00
1,488.00
233,400.00
15,000.00
66,750.00
100,100.00
106,700.00
120,100.00
67,500.00
11,904.00
4,201.20
195.00
12,515.63
37,537.50
4,801.50
2,257.88
140,912.71
140,913.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
65,500.00
1,488.00
233,400.00
15,000.00
66,750.00
100,100.00
106,700.00
120,100.00
65,500.00
11,904.00
4,201.20
195.00
12,515.63
37,537.50
4,801.50
2,257.88
138,912.71
138,913.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
67,500.00
1,488.00
233,400.00
15,000.00
66,750.00
100,100.00
106,700.00
120,100.00
67,500.00
11,904.00
4,201.20
195.00
12,515.63
37,537.50
4,801.50
2,257.88
140,912.71
140,913.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
81,500.00
1,488.00
233,400.00
15,000.00
66,750.00
100,100.00
106,700.00
120,100.00
81,500.00
11,904.00
4,201.20
195.00
12,515.63
37,537.50
4,801.50
2,257.88
154,912.71
154,913.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
83,000.00
1,488.00
233,400.00
15,000.00
66,750.00
100,100.00
106,700.00
120,100.00
83,000.00
11,904.00
4,201.20
195.00
12,515.63
37,537.50
4,801.50
2,257.88
156,412.71
156,413.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
81,500.00
1,488.00
233,400.00
15,000.00
66,750.00
100,100.00
106,700.00
120,100.00
81,500.00
11,904.00
4,201.20
195.00
12,515.63
37,537.50
4,801.50
2,257.88
154,912.71
154,913.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
76,000.00
1,488.00
233,400.00
15,000.00
66,750.00
100,100.00
106,700.00
120,100.00
76,000.00
11,904.00
4,201.20
195.00
12,515.63
37,537.50
4,801.50
2,257.88
149,412.71
149,413.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
62,500.00
1,488.00
233,400.00
15,000.00
66,750.00
100,100.00
106,700.00
120,100.00
62,500.00
11,904.00
4,201.20
195.00
12,515.63
37,537.50
4,801.50
2,257.88
135,912.71
135,913.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
80,000.00
1,488.00
233,400.00
15,000.00
66,750.00
100,100.00
106,700.00
120,100.00
80,000.00
11,904.00
4,201.20
195.00
12,515.63
37,537.50
4,801.50
2,257.88
153,412.71
153,413.00
M2
Bh
Kg
M3
Kg
Oh
Oh
Oh
Oh
1.0200
2.0000
12.4400
0.0250
1.5000
0.7200
0.6500
0.0650
0.0350
605,000.00
1,000.00
1,488.00
233,400.00
15,000.00
66,750.00
100,100.00
106,700.00
120,100.00
617,100.00
2,000.00
18,510.72
5,835.00
22,500.00
48,060.00
65,065.00
6,935.50
4,203.50
790,209.72
790,210.00
M2
Kg
M3
Oh
Oh
Oh
Oh
1.0500
11.7500
0.0350
0.6200
0.3500
0.0350
0.0300
100,110.00
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
105,115.50
17,484.00
8,169.00
41,385.00
35,035.00
3,734.50
3,603.00
214,526.00
214,526.00
M2
Kg
M3
Kg
Oh
Oh
Oh
Oh
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
Dibulatkan
E-40 1 M2 Wall paper
- Wall paper
M2
1.0500
- Lem
Kg
0.2500
- Pekerja
Oh
0.3500
- Tukang batu
Oh
0.1750
- Kepala tukang
Oh
0.0170
- Mandor
Oh
0.0020
Jumlah
Dibulatkan
E-41 1 M2 Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper Medan
- Kayu Balok Kamper Medan
M3
0.0280
- Paku Biasa 2" - 5"
Kg
0.1500
- Lem Kayu
Ltr
0.5600
- Teakwood 120 x 240 x 0,4 cm
Lbr
0.8600
- Pekerja
Oh
0.1500
- Tukang Kayu
Oh
0.4500
- Kepala Tukang
Oh
0.0450
- Mandor
Oh
0.0080
Jumlah
Dibulatkan
E-42 1 M2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper Medan
- Kayu Balok Kamper Medan
M3
0.0280
- Paku Biasa 2" - 5"
Kg
0.1500
- Lem Kayu
Ltr
0.5600
- Plywood 120 x 240 x 9 mm
Lbr
0.8600
- Pekerja
Oh
0.2000
- Tukang Kayu
Oh
0.6000
- Kepala Tukang
Oh
0.0600
- Mandor
Oh
0.0100
Jumlah
Dibulatkan
E-43 1 M2 Dinding Pemisah Triplek 4 mm Rangkap, Rangka Kayu Kamper Medan
- Kayu Balok Kamper Medan
M3
0.0280
- Paku Biasa 2" - 5"
Kg
0.1500
- Lem Kayu
Ltr
0.5600
- Triplek (120x240x0,4) cm
Lbr
0.8600
- Pekerja
Oh
0.2000
- Tukang Kayu
Oh
0.6000
- Kepala Tukang
Oh
0.0600
- Mandor
Oh
0.0100
Jumlah
Dibulatkan
2,700.00
1,488.00
233,400.00
15,000.00
66,750.00
100,100.00
106,700.00
120,100.00
2,700.00
11,904.00
4,201.20
195.00
12,515.63
37,537.50
4,801.50
2,257.88
76,112.71
76,113.00
61,500.00
39,300.00
66,750.00
100,100.00
106,700.00
120,100.00
64,575.00
9,825.00
23,362.50
17,517.50
1,813.90
240.20
117,334.10
117,334.00
6,262,000.00
24,000.00
26,300.00
145,000.00
66,750.00
100,100.00
106,700.00
120,100.00
175,336.00
3,600.00
14,728.00
124,700.00
10,012.50
45,045.00
4,801.50
960.80
379,183.80
379,184.00
6,262,000.00
24,000.00
26,300.00
260,000.00
66,750.00
100,100.00
106,700.00
120,100.00
175,336.00
3,600.00
14,728.00
223,600.00
13,350.00
60,060.00
6,402.00
1,201.00
498,277.00
498,277.00
6,262,000.00
24,000.00
26,300.00
68,500.00
66,750.00
100,100.00
106,700.00
120,100.00
175,336.00
3,600.00
14,728.00
58,910.00
13,350.00
60,060.00
6,402.00
1,201.00
333,587.00
333,587.00
0.4150
0.1500
0.3640
0.1100
4.0000
0.0720
0.1250
0.1000
0.0500
0.0050
0.0050
Dibulatkan
E-44 1 M2 Dinding Pemisah Gypsum t = 4 mm + rangka besi hollow
- Hollow 4/4 Zincromate
Btg
0.4150
- Hollow 2/4 Zincromate
Btg
0.1500
- Gypsum
Lbr
0.3640
- Paku GRC
kg
0.1100
- Ramset / dina bolt
Bh
4.0000
- Cotton plaster
Bh
0.0720
- Compoun
Zak
0.1250
- Pekerja
Oh
0.1000
- Tukang kayu
Oh
0.0500
- Kepala tukang
Oh
0.0050
- Mandor
Oh
0.0050
Jumlah
Dibulatkan
E-45 1 M2 Dinding Pemisah Plywood t = 4 mm + rangka besi hollow
- Hollow 4/4 Zincromate
Btg
0.4150
- Hollow 2/4 Zincromate
Btg
0.1500
- Plywood 120 x 240, 9 mm
Lbr
0.3640
- Paku
kg
0.1100
- Ramset / dina bolt
Bh
4.0000
- Pekerja
Oh
0.1000
- Tukang kayu
Oh
0.0500
- Kepala tukang
Oh
0.0050
- Mandor
Oh
0.0050
Jumlah
Dibulatkan
E-46 1 M2 Dinding Pemisah teakwood t = 4 mm + rangka besi hollow
- Hollow 4/4 Zincromate
Btg
0.4150
- Hollow 2/4 Zincromate
Btg
0.1500
- Teakwood ( 120 x 240 x 4 ) mm
Lbr
0.3640
- Paku
kg
0.1100
- Ramset / dina bolt
Bh
4.0000
- Pekerja
Oh
0.1000
- Tukang kayu
Oh
0.0500
- Kepala tukang
Oh
0.0050
- Mandor
Oh
0.0050
Jumlah
Dibulatkan
32,200.00
25,000.00
74,500.00
38,500.00
8,000.00
26,300.00
83,000.00
66,750.00
100,100.00
106,700.00
120,100.00
13,363.00
3,750.00
27,118.00
4,235.00
32,000.00
1,893.60
10,375.00
6,675.00
5,005.00
533.50
600.50
105,548.60
105,549.00
32,200.00
25,000.00
87,800.00
38,500.00
8,000.00
26,300.00
83,000.00
66,750.00
100,100.00
106,700.00
120,100.00
13,363.00
3,750.00
31,959.20
4,235.00
32,000.00
1,893.60
10,375.00
6,675.00
5,005.00
533.50
600.50
110,389.80
110,390.00
32,200.00
25,000.00
260,000.00
24,000.00
8,000.00
66,750.00
100,100.00
106,700.00
120,100.00
13,363.00
3,750.00
94,640.00
2,640.00
32,000.00
6,675.00
5,005.00
533.50
600.50
159,207.00
159,207.00
32,200.00
25,000.00
145,000.00
24,000.00
8,000.00
66,750.00
100,100.00
106,700.00
120,100.00
13,363.00
3,750.00
52,780.00
2,640.00
32,000.00
6,675.00
5,005.00
533.50
600.50
117,347.00
117,347.00
36.0000
11.0000
0.0350
0.3000
0.1000
0.0100
0.0150
24,200.00
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
871,200.00
16,368.00
8,169.00
20,025.00
10,010.00
1,067.00
1,801.50
928,640.50
928,641.00
1.5000
0.0140
0.0112
0.0030
0.1000
0.0500
0.0050
0.0020
25,000.00
3,692,500.00
24,000.00
5,810,000.00
66,750.00
100,100.00
106,700.00
120,100.00
37,500.00
51,695.00
268.80
17,430.00
6,675.00
5,005.00
533.50
240.20
119,347.50
119,348.00
URAIAN
SATUAN
VOLUME
8.5200
0.0170
0.2000
0.1500
0.0150
0.0100
HARGA SATUAN
(Rp)
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
HARGA
(Rp)
12,677.76
3,967.80
13,350.00
15,015.00
1,600.50
1,201.00
47,812.06
47,812.00
6.4800
0.0190
0.2000
0.1500
0.0150
0.0100
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
9,642.24
4,434.60
13,350.00
15,015.00
1,600.50
1,201.00
45,243.34
45,243.00
5.2000
0.0200
0.2000
0.1500
0.0150
0.0100
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
7,737.60
4,668.00
13,350.00
15,015.00
1,600.50
1,201.00
43,572.10
43,572.00
10.8000
0.0260
0.2500
0.2000
0.0200
0.0125
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
16,070.40
6,068.40
16,687.50
20,020.00
2,134.00
1,501.25
62,481.55
62,482.00
8.6800
0.0280
0.2500
0.2000
0.0200
0.0125
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
12,915.84
6,535.20
16,687.50
20,020.00
2,134.00
1,501.25
59,793.79
59,794.00
7.2900
0.0260
0.2500
0.2000
0.0200
0.0125
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
10,847.52
6,068.40
16,687.50
20,020.00
2,134.00
1,501.25
57,258.67
57,259.00
No.
URAIAN
SATUAN
VOLUME
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
HARGA
(Rp)
8,436.96
5,368.20
10,012.50
7,007.00
746.90
960.80
32,532.36
32,532.00
9.3000
0.0180
0.2600
0.2000
0.0200
0.0130
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
13,838.40
4,201.20
17,355.00
20,020.00
2,134.00
1,561.30
59,109.90
59,110.00
7.0700
0.0210
0.2600
0.2000
0.0200
0.0130
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
10,520.16
4,901.40
17,355.00
20,020.00
2,134.00
1,561.30
56,491.86
56,492.00
0.5000
0.0130
0.0800
0.4000
0.0400
0.0040
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
744.00
3,034.20
5,340.00
40,040.00
4,268.00
480.40
53,906.60
53,907.00
Kg
Oh
Oh
Oh
Oh
Dibulatkan
F-12 1 M2 Plesteran Siar adk. 1pc : 2ps batu belah
- Semen Portland
Kg
- Pasir Pasang
M3
- Pekerja
Oh
- Tukang Batu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
5.6700
0.0230
0.1500
0.0700
0.0070
0.0080
HARGA SATUAN
(Rp)
4.0000
0.1430
0.1070
0.0105
0.0105
1,488.00
66,750.00
100,100.00
106,700.00
120,100.00
5,952.00
9,545.25
10,710.70
1,120.35
1,261.05
28,589.35
28,589.00
6.3400
0.0120
0.3000
0.1500
0.0150
0.0150
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
9,433.92
2,800.80
20,025.00
15,015.00
1,600.50
1,801.50
50,676.72
50,677.00
No.
URAIAN
SATUAN
VOLUME
4.3200
0.0160
0.1500
0.0700
0.0070
0.0080
HARGA SATUAN
(Rp)
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
HARGA
(Rp)
6,428.16
3,734.40
10,012.50
7,007.00
746.90
960.80
28,889.76
28,890.00
Bh
Oh
Oh
Oh
Oh
25.0000
0.1500
0.0750
0.0080
0.0080
2,000.00
66,750.00
100,100.00
106,700.00
120,100.00
69,334.00
Bh
Kg
M3
Oh
Oh
Oh
Oh
5.0000
8.0000
0.0320
0.4000
0.2000
0.0200
0.0020
6,500.00
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
32,500.00
11,904.00
7,468.80
26,700.00
20,020.00
2,134.00
240.20
100,967.00
100,967.00
Bh
Kg
M3
Oh
Oh
Oh
Oh
5.0000
8.0000
0.0320
0.4000
0.2000
0.0200
0.0020
6,800.00
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
34,000.00
11,904.00
7,468.80
26,700.00
20,020.00
2,134.00
240.20
102,467.00
102,467.00
Lbr
Kg
Oh
Oh
Oh
Oh
0.6000
0.0500
0.1400
0.0670
0.0070
0.0070
110,000.00
24,000.00
66,750.00
100,100.00
106,700.00
120,100.00
66,000.00
1,200.00
9,345.00
6,706.70
746.90
840.70
84,839.30
84,839.00
) x 4 mm
Lbr
Kg
Oh
Oh
Oh
Oh
0.3500
0.1200
0.1400
0.0700
0.0070
0.0070
88,000.00
24,000.00
66,750.00
100,100.00
106,700.00
120,100.00
Dibulatkan
50,000.00
10,012.50
7,507.50
853.60
960.80
69,334.40
30,800.00
2,880.00
9,345.00
7,007.00
746.90
840.70
51,619.60
51,620.00
) x 4 mm
Lbr
Kg
Oh
Oh
Oh
Oh
Dibulatkan
G-06 1 M2 Pasang Atap Asbes Gelombang ( 2,40 x 1,05 m ) x 4 mm
- Asbes gelombang
Lbr
- Paku seng
Kg
0.4200
0.1200
0.1400
0.0700
0.0070
0.0070
81,000.00
24,000.00
66,750.00
100,100.00
106,700.00
120,100.00
34,020.00
2,880.00
9,345.00
7,007.00
746.90
840.70
54,839.60
54,840.00
0.4400
0.1200
72,500.00
24,000.00
31,900.00
2,880.00
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan
Oh
Oh
Oh
Oh
0.1400
0.0670
0.0070
0.0070
66,750.00
100,100.00
106,700.00
120,100.00
9,345.00
6,706.70
746.90
840.70
52,419.30
52,419.00
0.5100
0.1200
0.1400
0.0670
0.0070
0.0070
65,500.00
24,000.00
66,750.00
100,100.00
106,700.00
120,100.00
33,405.00
2,880.00
9,345.00
6,706.70
746.90
840.70
53,924.30
53,924.00
0.8000
0.1200
0.1400
0.0670
0.0070
0.0070
47,000.00
24,000.00
66,750.00
100,100.00
106,700.00
120,100.00
37,600.00
2,880.00
9,345.00
6,706.70
746.90
840.70
58,119.30
58,119.00
Lbr
Bh
Oh
Oh
Oh
Oh
2.1000
6.0000
0.0840
0.1250
0.0130
0.0040
39,000.00
850.00
66,750.00
100,100.00
106,700.00
120,100.00
81,900.00
5,100.00
5,607.00
12,512.50
1,387.10
480.40
106,987.00
106,987.00
bh
Kg
Oh
Oh
Oh
Oh
11.0000
0.0300
0.2000
0.1000
0.0100
0.0100
9,000.00
24,000.00
66,750.00
100,100.00
106,700.00
120,100.00
99,000.00
720.00
13,350.00
10,010.00
1,067.00
1,201.00
125,348.00
125,348.00
bh
Oh
Oh
Oh
Oh
18.0000
0.1500
0.0750
0.0080
0.0080
3,000.00
66,750.00
100,100.00
106,700.00
120,100.00
54,000.00
10,012.50
7,507.50
853.60
960.80
73,334.40
73,334.00
bh
Oh
Oh
Oh
Oh
18.0000
0.1500
0.0750
0.0080
0.0080
4,500.00
66,750.00
100,100.00
106,700.00
120,100.00
81,000.00
10,012.50
7,507.50
853.60
960.80
100,334.40
100,334.00
m2
Kg
Oh
Oh
Oh
Oh
1.0200
0.2000
0.2000
0.1000
0.0100
0.0010
225,000.00
24,000.00
66,750.00
100,100.00
106,700.00
120,100.00
229,500.00
4,800.00
13,350.00
10,010.00
1,067.00
120.10
258,847.10
258,847.00
Bh
Kg
Kg
M3
Kg
Oh
Oh
Oh
Oh
3.5000
0.0500
10.8000
0.0320
1.0000
0.4000
0.2000
0.0200
0.0200
11,000.00
24,000.00
1,488.00
233,400.00
15,000.00
66,750.00
100,100.00
106,700.00
120,100.00
38,500.00
1,200.00
16,070.40
7,468.80
15,000.00
26,700.00
20,020.00
2,134.00
2,402.00
129,495.20
129,495.00
Lbr
Kg
Oh
Oh
Oh
Oh
1.1000
0.0500
0.2500
0.1500
0.0150
0.0130
152,500.00
24,000.00
66,750.00
100,100.00
106,700.00
120,100.00
203,814.00
Lbr
Kg
Oh
Oh
Oh
Oh
0.7000
0.0200
0.1200
0.0600
0.0060
0.0060
91,500.00
24,000.00
66,750.00
100,100.00
106,700.00
120,100.00
Dibulatkan
64,050.00
480.00
8,010.00
6,006.00
640.20
720.60
79,906.80
79,907.00
Lbr
Kg
Oh
Oh
Oh
Oh
0.3000
0.0400
0.1500
0.0700
0.0080
0.0060
41,500.00
24,000.00
66,750.00
100,100.00
106,700.00
120,100.00
Dibulatkan
167,750.00
1,200.00
16,687.50
15,015.00
1,600.50
1,561.30
203,814.30
12,450.00
960.00
10,012.50
7,007.00
853.60
720.60
32,003.70
32,004.00
M2
Oh
Oh
Oh
Oh
1.0500
0.1500
0.0500
0.0050
0.0080
20,000.00
66,750.00
100,100.00
106,700.00
120,100.00
21,000.00
10,012.50
5,005.00
533.50
960.80
37,511.80
37,512.00
Lbr
Kg
Oh
Oh
Oh
Oh
1.0500
0.0200
0.1500
0.7500
0.0080
0.0060
155,000.00
18,400.00
66,750.00
100,100.00
106,700.00
120,100.00
162,750.00
368.00
10,012.50
75,075.00
853.60
720.60
249,779.70
249,780.00
Lbr
Kg
Oh
Oh
Oh
Oh
1.0500
0.0200
0.1500
0.7500
0.0080
0.0060
182,500.00
18,400.00
66,750.00
100,100.00
106,700.00
120,100.00
191,625.00
368.00
10,012.50
75,075.00
853.60
720.60
278,654.70
278,655.00
M2
Kg
Oh
Oh
Oh
Oh
1.2000
0.0400
0.1000
1.0000
0.0100
0.0100
78,500.00
18,400.00
66,750.00
100,100.00
106,700.00
120,100.00
94,200.00
736.00
6,675.00
100,100.00
1,067.00
1,201.00
203,979.00
203,979.00
M'
kg
Oh
Oh
Oh
Oh
1.1000
0.0500
0.1000
0.2000
0.0200
0.0050
27,450.00
38,500.00
66,750.00
100,100.00
106,700.00
120,100.00
30,195.00
1,925.00
6,675.00
20,020.00
2,134.00
600.50
61,549.50
61,550.00
M'
Kg
Oh
Oh
Oh
Oh
4.0000
0.0526
0.0840
0.1250
0.0130
0.0040
4,000.00
20,000.00
66,750.00
100,100.00
106,700.00
120,100.00
16,000.00
1,052.00
5,607.00
12,512.50
1,387.10
480.40
37,039.00
37,039.00
M'
Kg
Oh
Oh
Oh
Oh
4.0000
0.0526
0.0840
0.1250
0.0130
0.0040
10,700.00
20,000.00
66,750.00
100,100.00
106,700.00
120,100.00
42,800.00
1,052.00
5,607.00
12,512.50
1,387.10
480.40
63,839.00
63,839.00
1.1000
0.0100
0.0300
0.0700
0.0070
0.0015
27,500.00
240.00
2,002.50
7,007.00
746.90
180.15
37,676.55
37,677.00
1.1000
0.0100
0.0300
0.0700
0.0070
0.0015
21,500.00
24,000.00
66,750.00
100,100.00
106,700.00
120,100.00
23,650.00
240.00
2,002.50
7,007.00
746.90
180.15
33,826.55
33,827.00
Lbr
Kg
Oh
Oh
Oh
Oh
1.5000
0.0500
0.0600
0.1000
0.0100
0.0030
Dibulatkan
H-04 1 M2 Langit-langit Akustik ( 60 x 120 ) cm + Rangka Alluminium
- Profil Alluminium "T"
M
3.6000
- Kawat 4 mm
Kg
0.1500
- Ramset / dina bolt
Bh
1.0500
- Akustik 600 x 1200
Lbr
1.5000
- Pekerja
Oh
0.1500
- Tukang kayu
Oh
0.5000
- Kepala tukang
Oh
0.0500
- Mandor
Oh
0.0075
Jumlah
Dibulatkan
H-05 1 M2 Langit-langit teakwood (60 x 120) cm, t = 4 mm + rangka kayu borneo super
- Kayu Balok Borneo Super
M3
0.0230
- Paku biasa 2" - 5"
Kg
0.0600
- Teakwood 120 cm x 240 cm x 0,4 cm
Lbr
0.3900
- Pekerja
Oh
0.2700
- Tukang kayu
Oh
0.4000
- Kepala tukang
Oh
0.0400
- Mandor
Oh
0.0135
Jumlah
Dibulatkan
25,000.00
24,000.00
66,750.00
100,100.00
106,700.00
120,100.00
146,500.00
24,000.00
66,750.00
100,100.00
106,700.00
120,100.00
219,750.00
1,200.00
4,005.00
10,010.00
1,067.00
360.30
236,392.30
236,392.00
13,500.00
31,100.00
8,000.00
146,500.00
66,750.00
100,100.00
106,700.00
120,100.00
48,600.00
4,665.00
8,400.00
219,750.00
10,012.50
50,050.00
5,335.00
900.75
347,713.25
347,713.00
2,640,000.00
24,000.00
145,000.00
66,750.00
100,100.00
106,700.00
120,100.00
60,720.00
1,440.00
56,550.00
18,022.50
40,040.00
4,268.00
1,621.35
182,661.85
182,662.00
2,640,000.00
24,000.00
142,500.00
66,750.00
100,100.00
106,700.00
120,100.00
60,720.00
1,440.00
55,575.00
18,022.50
40,040.00
4,268.00
1,621.35
181,686.85
181,687.00
0.0230
0.0600
0.3900
0.2700
0.4000
0.0400
0.0135
2,640,000.00
24,000.00
68,500.00
66,750.00
100,100.00
106,700.00
120,100.00
60,720.00
1,440.00
26,715.00
18,022.50
40,040.00
4,268.00
1,621.35
152,826.85
152,827.00
2,640,000.00
24,000.00
87,800.00
19,500.00
66,750.00
100,100.00
106,700.00
120,100.00
162,499.00
0.0230
0.0600
0.3900
0.1100
0.2700
0.4000
0.0400
0.0135
2,640,000.00
24,000.00
74,500.00
38,500.00
66,750.00
100,100.00
106,700.00
120,100.00
Dibulatkan
60,720.00
1,440.00
34,242.00
2,145.00
18,022.50
40,040.00
4,268.00
1,621.35
162,498.85
60,720.00
1,440.00
29,055.00
4,235.00
18,022.50
40,040.00
4,268.00
1,621.35
159,401.85
159,402.00
M
Kg
Oh
Oh
Oh
Oh
1.0500
0.0100
0.0434
0.0500
0.0050
0.0030
1,500.00
24,000.00
66,750.00
100,100.00
106,700.00
120,100.00
1,575.00
240.00
2,896.95
5,005.00
533.50
360.30
10,610.75
10,610.00
380,000.00
- Semen portland
- Pasir pasang
Kg
M3
9.8000
0.0215
1,488.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
1.3000
0.2500
15,000.00
66,750.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1200
0.0120
100,100.00
106,700.00
- Mandor
Jumlah
Oh
0.0125
120,100.00
Dibulatkan
I-02 1 M2 Lantai Ubin Granito ukuran 30 x 30 cm Setara Essenza
- Granito 30 x 30 cm
m2
1.0500
355,500.00
- Semen portland
- Pasir pasang
Kg
M3
10.0000
0.0215
1,488.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
1.5000
0.2600
15,000.00
66,750.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1250
0.0125
100,100.00
106,700.00
- Mandor
Jumlah
Oh
0.0130
120,100.00
Dibulatkan
2.6500
2,200.00
- Semen portland
- Pasir pasang
Kg
M3
1.2000
0.0030
1,488.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.1000
0.0600
15,000.00
66,750.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.0300
0.0030
100,100.00
106,700.00
- Mandor
Jumlah
Oh
0.0030
120,100.00
3.3300
2,000.00
Dibulatkan
I-04 1 M Plint Ubin Granito ukuran 10 x 30 cm Setara Essenza
- Plint granito 10 x 30 cm
Bh
- Semen portland
- Pasir pasang
Kg
M3
1.6500
0.0032
1,488.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.1000
0.0900
15,000.00
66,750.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.0900
0.0090
100,100.00
106,700.00
- Mandor
Jumlah
Oh
0.0045
120,100.00
Dibulatkan
I-05 1 M2 Lantai Keramik Corak 10 x 20 cm setara Mulia
- Keramik corak 10 x 20 cm
m2
1.0000
75,000.00
- Semen portland
- Pasir pasang
Kg
M3
8.0000
0.0215
1,488.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.0130
0.2500
15,000.00
66,750.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1200
0.0120
100,100.00
106,700.00
- Mandor
Jumlah
Oh
0.0125
120,100.00
1.0000
60,000.00
Dibulatkan
- Semen portland
- Pasir pasang
Kg
M3
8.0000
0.0215
1,488.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.0130
0.2500
15,000.00
66,750.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1200
0.0120
100,100.00
106,700.00
- Mandor
Jumlah
Oh
0.0125
120,100.00
1.0000
65,500.00
Dibulatkan
I-08 1 M2 Lantai Keramik corak 30 x 30 cm Setara Mulia
- Keramik corak 30 x 30 cm
m2
- Semen portland
- Pasir pasang
Kg
M3
8.0000
0.0215
1,488.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.0130
0.2500
15,000.00
66,750.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1200
0.0120
100,100.00
106,700.00
- Mandor
Jumlah
Oh
0.0125
120,100.00
Dibulatkan
I-09 1 M2 Lantai Keramik polos 40 x 40 cm Setara Mulia
- Keramik polos 40 x 40 cm
- Semen portland
m2
Kg
1.0000
8.0000
55,500.00
1,488.00
- Pasir pasang
- Semen warna
M3
Kg
0.0215
0.0130
233,400.00
15,000.00
- Pekerja
- Tukang batu
- Kepala tukang
Oh
Oh
Oh
0.2500
0.1200
0.0120
66,750.00
100,100.00
106,700.00
- Mandor
Jumlah
Oh
0.0125
120,100.00
Dibulatkan
1.0000
66,000.00
- Semen portland
- Pasir pasang
Kg
M3
8.0000
0.0215
1,488.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.0130
0.2500
15,000.00
66,750.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1200
0.0120
100,100.00
106,700.00
- Mandor
Jumlah
Oh
0.0125
120,100.00
1.0000
65,500.00
Dibulatkan
I-12 1 M2 Lantai Keramik corak 20 x 20 cm setara Roman
- Keramik corak 20 x 20 cm
m2
- Semen portland
- Pasir pasang
Kg
M3
8.0000
0.0215
1,488.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.0130
0.2500
15,000.00
66,750.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1200
0.0120
100,100.00
106,700.00
- Mandor
Jumlah
Oh
0.0125
120,100.00
Dibulatkan
I-13 1 M2 Lantai Keramik polos 30 x 30 cm setara Roman
- Keramik polos 30 x 30 cm
m2
1.0000
81,500.00
- Semen portland
- Pasir pasang
Kg
M3
8.0000
0.0215
1,488.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.0130
0.2500
15,000.00
66,750.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1200
0.0120
100,100.00
106,700.00
- Mandor
Jumlah
Oh
0.0125
120,100.00
Dibulatkan
I-14 1 M2 Lantai Keramik corak 30 x 30 cm Setara Roman
- Keramik corak 30 x 30 cm
m2
1.0000
76,000.00
- Semen portland
- Pasir pasang
Kg
M3
8.0000
0.0215
1,488.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.0130
0.2500
15,000.00
66,750.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1200
0.0120
100,100.00
106,700.00
- Mandor
Jumlah
Oh
0.0125
120,100.00
1.0000
62,500.00
Dibulatkan
I-15 1 M2 Lantai Keramik Corak 40 x 40 cm setara Roman
- Keramik polos 40 x 40 cm
m2
- Semen portland
- Pasir pasang
Kg
M3
8.0000
0.0215
1,488.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.0130
0.2500
15,000.00
66,750.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1200
0.0120
100,100.00
106,700.00
- Mandor
Jumlah
Oh
0.0125
120,100.00
Dibulatkan
1.0000
80,000.00
- Semen portland
- Pasir pasang
Kg
M3
8.0000
0.0215
1,488.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.0130
0.2500
15,000.00
66,750.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1200
0.0120
100,100.00
106,700.00
- Mandor
Jumlah
Oh
0.0125
120,100.00
m2
1.0600
605,000.00
- Semen portland
- Pasir pasang
Kg
M3
8.1900
0.0450
1,488.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.6500
0.7000
15,000.00
66,750.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.3500
0.0350
100,100.00
106,700.00
- Mandor
Jumlah
Oh
0.0350
120,100.00
Dibulatkan
I-17 1 M2 Lantai Marmer
- Marmer
Dibulatkan
I-18 1 M2 Lantai Parquet Jati
- Parquet jati
M2
1.0500
413,500.00
- Lem vinyl
- Pekerja
Kg
Oh
0.6000
0.6500
48,500.00
66,750.00
- Tukang
- Kepala tukang
Oh
Oh
0.3500
0.0350
100,100.00
106,700.00
- Mandor
Jumlah
Oh
0.0325
120,100.00
Bh
Kg
M3
3.5000
1.6500
0.0032
4,000.00
1,488.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.1000
0.0900
15,000.00
66,750.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.0900
0.0090
100,100.00
106,700.00
- Mandor
Jumlah
Oh
0.0045
120,100.00
Dibulatkan
Dibulatkan
0.0024
9,596,800.00
- Paku
- Pekerja
Kg
Oh
0.0500
0.1200
24,000.00
66,750.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1200
0.0120
100,100.00
106,700.00
- Mandor
Jumlah
Oh
0.0060
120,100.00
- Plint keramik
- Semen abu-abu
- Pasir pasang
Bh
Kg
M3
5.3000
1.1400
0.0030
3,500.00
1,488.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.0250
0.0900
15,000.00
66,750.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.0900
0.0090
100,100.00
106,700.00
- Mandor
Jumlah
Oh
0.0050
120,100.00
- Karpet
- Lem
- Pekerja
M2
Kg
Oh
1.0500
0.3500
0.1700
389,000.00
39,300.00
66,750.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1700
0.0170
100,100.00
106,700.00
- Mandor
Jumlah
Oh
0.0085
120,100.00
M2
Kg
1.050
89,300.00
233,400.00
- Mandor
Jumlah
Oh
Dibulatkan
I-22 1 M' Plint keramik ukuran (10 x 20) cm
Dibulatkan
I-23 1 M2 Lantai karpet
Dibulatkan
I-24 1 M2 Paving block natural 8 cm
Oh
Oh
Oh
0.100
0.2500
0.5000
0.0250
0.00250
66,750.00
100,100.00
106,700.00
120,100.00
Dibulatkan
I-25 1 M2 Paving block warna 8 cm
- Paving block warna
- Pasir pasang
- Pekerja
- Tukang batu
M2
Kg
- Kepala tukang
- Mandor
Jumlah
Oh
Oh
Oh
Oh
1.050
0.100
0.2500
0.5000
0.0250
0.00250
119,500.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
Dibulatkan
I-26 1 M2 Paving block natural 6 cm
- Paving block natural
- Pasir pasang
- Pekerja
- Tukang batu
M2
Kg
- Kepala tukang
- Mandor
Oh
Oh
Jumlah
Dibulatkan
Oh
Oh
1.050
0.100
0.2500
0.5000
0.0250
0.00250
83,600.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
M2
- Pasir pasang
- Pekerja
Kg
Oh
- Tukang batu
- Kepala tukang
Oh
Oh
- Mandor
Jumlah
Oh
1.050
0.100
0.2500
0.5000
0.0250
0.00250
94,600.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
Dibulatkan
I-28 1 M2 Grass Block 20 x 20
- Grass block
- Pasir pasang
- Pekerja
Bh
Kg
Oh
- Tukang batu
- Kepala tukang
Oh
Oh
- Mandor
Jumlah
Oh
26.250
0.100
0.2500
0.5000
0.0250
0.00250
10,700.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
Dibulatkan
I-29 1 M2 Grass Block 30 x 30
- Grass block
- Pasir pasang
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
Bh
Kg
Oh
Oh
Oh
Oh
11.670
0.100
0.2500
0.5000
0.0250
0.00250
22,500.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
399,000.00
14,582.40
5,018.10
19,500.00
16,687.50
12,012.00
1,280.40
1,501.25
469,581.65
469,582.00
373,275.00
14,880.00
5,018.10
22,500.00
17,355.00
12,512.50
1,333.75
1,561.30
448,435.65
448,436.00
5,830.00
1,785.60
700.20
1,500.00
4,005.00
3,003.00
320.10
360.30
17,504.20
17,504.00
6,660.00
2,455.20
746.88
1,500.00
6,007.50
9,009.00
960.30
540.45
27,879.33
27,879.00
75,000.00
11,904.00
5,018.10
195.00
16,687.50
12,012.00
1,280.40
1,501.25
123,598.25
123,598.00
60,000.00
11,904.00
5,018.10
195.00
16,687.50
12,012.00
1,280.40
1,501.25
108,598.25
108,598.00
65,500.00
11,904.00
5,018.10
195.00
16,687.50
12,012.00
1,280.40
1,501.25
114,098.25
114,098.00
55,500.00
11,904.00
5,018.10
195.00
16,687.50
12,012.00
1,280.40
1,501.25
104,098.25
104,098.00
66,000.00
11,904.00
5,018.10
195.00
16,687.50
12,012.00
1,280.40
1,501.25
114,598.25
114,598.00
65,500.00
11,904.00
5,018.10
195.00
16,687.50
12,012.00
1,280.40
1,501.25
114,098.25
114,098.00
81,500.00
11,904.00
5,018.10
195.00
16,687.50
12,012.00
1,280.40
1,501.25
130,098.25
130,098.00
76,000.00
11,904.00
5,018.10
195.00
16,687.50
12,012.00
1,280.40
1,501.25
124,598.25
124,598.00
62,500.00
11,904.00
5,018.10
195.00
16,687.50
12,012.00
1,280.40
1,501.25
111,098.25
111,098.00
80,000.00
11,904.00
5,018.10
195.00
16,687.50
12,012.00
1,280.40
1,501.25
128,598.25
128,598.00
641,300.00
12,186.72
10,503.00
9,750.00
46,725.00
35,035.00
3,734.50
4,203.50
763,437.72
763,438.00
434,175.00
29,100.00
43,387.50
35,035.00
3,734.50
3,903.25
549,335.25
549,335.00
14,000.00
2,455.20
746.88
1,500.00
6,007.50
9,009.00
960.30
540.45
35,219.33
35,219.00
23,032.32
1,200.00
8,010.00
12,012.00
1,280.40
720.60
46,255.32
46,255.00
18,550.00
1,696.32
700.20
375.00
6,007.50
9,009.00
960.30
600.50
37,898.82
37,899.00
408,450.00
13,755.00
11,347.50
17,017.00
1,813.90
1,020.85
453,404.25
453,404.00
93,765.00
23,340.00
16,687.50
50,050.00
2,667.50
300.25
186,810.25
186,810.00
125,475.00
23,340.00
16,687.50
50,050.00
2,667.50
300.25
218,520.25
218,520.00
87,780.00
23,340.00
16,687.50
50,050.00
2,667.50
300.25
180,825.25
180,825.00
99,330.00
23,340.00
16,687.50
50,050.00
2,667.50
300.25
192,375.25
192,375.00
280,875.00
23,340.00
16,687.50
50,050.00
2,667.50
300.25
373,920.25
373,920.00
262,575.00
23,340.00
16,687.50
50,050.00
2,667.50
300.25
355,620.25
355,620.00
1.2000
6.0000
18.0000
2.0000
0.3000
9,500,000.00
66,750.00
100,100.00
106,700.00
120,100.00
13,851,730.00
1.2000
6.0000
18.0000
2.0000
0.3000
6,262,000.00
66,750.00
100,100.00
106,700.00
120,100.00
Dibulatkan
11,400,000.00
400,500.00
1,801,800.00
213,400.00
36,030.00
13,851,730.00
7,514,400.00
400,500.00
1,801,800.00
213,400.00
36,030.00
9,966,130.00
9,966,130.00
0.0400
0.0500
1.0000
2.5000
0.2500
0.0500
9,500,000.00
23,400.00
66,750.00
100,100.00
106,700.00
120,100.00
380,000.00
1,170.00
66,750.00
250,250.00
26,675.00
6,005.00
730,850.00
730,850.00
0.0400
0.0500
1.0000
2.5000
0.2500
0.0500
6,262,000.00
23,400.00
66,750.00
100,100.00
106,700.00
120,100.00
250,480.00
1,170.00
66,750.00
250,250.00
26,675.00
6,005.00
601,330.00
601,330.00
0.0350
0.8000
2.0000
0.2000
0.0400
6,262,000.00
66,750.00
100,100.00
106,700.00
120,100.00
219,170.00
53,400.00
200,200.00
21,340.00
4,804.00
498,914.00
498,914.00
M3
Oh
Oh
Oh
Oh
Dibulatkan
J-08 1 M2 Pintu & Jendela Jalusi Kayu Kamper Medan
- Kayu Papan Kamper Medan
M3
- Pekerja
Oh
- Tukang Kayu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
0.0350
0.8000
2.0000
0.2000
0.0400
215,442.50
53,400.00
200,200.00
21,340.00
4,804.00
495,186.50
495,187.00
0.0640
1.0000
3.0000
0.3000
0.5000
Dibulatkan
J-09 1 M2 Pintu Triplek Rangkap, Rangka Tertutup Kayu Kamper Medan
- Kayu Papan Kamper Medan
M3
0.0196
- Paku Biasa " - 1"
Kg
0.0300
- Lem Kayu
Ltr
0.3000
- Triplek 120 x 240 x 0,4 cm
Lbr
1.0000
- Pekerja
Oh
0.6000
- Tukang Kayu
Oh
2.0000
- Kepala Tukang
Oh
0.2000
- Mandor
Oh
0.0300
Jumlah
Dibulatkan
6,155,500.00
66,750.00
100,100.00
106,700.00
120,100.00
6,262,000.00
66,750.00
100,100.00
106,700.00
120,100.00
400,768.00
66,750.00
300,300.00
32,010.00
60,050.00
859,878.00
859,878.00
6,262,000.00
24,000.00
26,300.00
68,500.00
66,750.00
100,100.00
106,700.00
120,100.00
122,735.20
720.00
7,890.00
68,500.00
40,050.00
200,200.00
21,340.00
3,603.00
465,038.20
465,038.00
6,262,000.00
24,000.00
26,300.00
68,500.00
147,500.00
66,750.00
100,100.00
106,700.00
120,100.00
122,735.20
7,200.00
21,040.00
68,500.00
73,750.00
53,400.00
250,250.00
26,675.00
4,804.00
628,354.20
628,354.00
6,262,000.00
24,000.00
26,300.00
145,000.00
262,500.00
66,750.00
100,100.00
106,700.00
120,100.00
122,735.20
7,200.00
21,040.00
145,000.00
131,250.00
53,400.00
250,250.00
26,675.00
4,804.00
762,354.20
762,354.00
M3
Kg
Kg
Oh
Oh
Oh
Oh
1.1000
15.0000
0.8000
4.0000
12.0000
1.2000
0.2000
6,262,000.00
29,500.00
24,000.00
66,750.00
100,100.00
106,700.00
120,100.00
6,888,200.00
442,500.00
19,200.00
267,000.00
1,201,200.00
128,040.00
24,020.00
8,970,160.00
8,970,160.00
M3
Kg
Kg
Oh
Oh
Oh
Oh
1.1000
15.0000
0.8000
4.0000
12.0000
1.2000
0.2000
5,810,000.00
29,500.00
24,000.00
66,750.00
100,100.00
106,700.00
120,100.00
6,391,000.00
442,500.00
19,200.00
267,000.00
1,201,200.00
128,040.00
24,020.00
8,472,960.00
8,472,960.00
0.0140
0.1500
0.1000
0.1000
0.0100
0.0050
5,810,000.00
24,000.00
66,750.00
100,100.00
106,700.00
120,100.00
81,340.00
3,600.00
6,675.00
10,010.00
1,067.00
600.50
103,292.50
103,293.00
0.0072
0.0500
0.1000
0.2000
0.0200
0.0050
6,405,800.00
24,000.00
66,750.00
100,100.00
106,700.00
120,100.00
46,121.76
1,200.00
6,675.00
20,020.00
2,134.00
600.50
76,751.26
Dibulatkan
76,751.00
M'
Oh
Oh
Oh
Oh
1.0500
0.0210
0.0210
0.0020
0.0010
32,400.00
66,750.00
100,100.00
106,700.00
120,100.00
37,857.00
M3
Lbr
Kg
Lbr
Bh
Bh
Oh
Oh
Oh
Oh
0.1050
5.0000
2.0000
2.0000
4.0000
4.0000
0.3000
1.3000
0.1300
0.0130
5,810,000.00
68,500.00
24,000.00
5,500.00
23,100.00
35,000.00
66,750.00
100,100.00
106,700.00
120,100.00
Dibulatkan
610,050.00
342,500.00
48,000.00
11,000.00
92,400.00
140,000.00
20,025.00
130,130.00
13,871.00
1,561.30
1,409,537.30
194,151.14
194,151.00
34,020.00
1,401.75
2,102.10
213.40
120.10
37,857.35
kg
Oh
Oh
Oh
Oh
0.1000
0.1500
0.2500
0.0250
0.0750
2,640,000.00
24,000.00
66,750.00
100,100.00
106,700.00
120,100.00
31,680.00
2,400.00
10,012.50
25,025.00
2,667.50
9,007.50
Jumlah
Dibulatkan
80,792.50
80,793.00
2,640,000.00
24,000.00
66,750.00
100,100.00
106,700.00
120,100.00
40,656.00
4,800.00
10,012.50
30,030.00
3,201.00
9,007.50
97,707.00
97,707.00
2,640,000.00
66,750.00
100,100.00
106,700.00
120,100.00
10,560.00
6,675.00
20,020.00
2,134.00
600.50
39,989.50
39,990.00
m
Kg
Kg
Oh
Oh
Oh
Oh
1.1000
15.0000
3.0000
2.4000
7.2000
0.7200
0.1200
6,262,000.00
29,500.00
24,000.00
66,750.00
100,100.00
106,700.00
120,100.00
6,888,200.00
442,500.00
72,000.00
160,200.00
720,720.00
76,824.00
14,412.00
8,374,856.00
8,374,856.00
m2
m3
Kg
m3
Oh
Oh
Oh
Oh
1.1000
0.0140
0.0120
0.0030
0.1000
0.0500
0.0050
0.0050
25,000.00
2,640,000.00
24,000.00
10,500.00
66,750.00
100,100.00
106,700.00
120,100.00
27,500.00
36,960.00
288.00
31.50
6,675.00
5,005.00
533.50
600.50
77,593.50
77,594.00
Kg
Kg
Oh
Oh
Oh
Oh
1.1000
0.0800
0.0600
0.0060
0.0060
0.0003
26,400.00
33,500.00
66,750.00
100,100.00
106,700.00
120,100.00
29,040.00
2,680.00
4,005.00
600.60
640.20
36.03
37,001.83
37,002.00
m'
m'
jam
Oh
Oh
Oh
Oh
0.0100
0.0010
0.0080
0.0010
0.00001
0.00001
0.00005
7,500.0000
57,500.0000
100,000.0000
66,750.0000
100,100.0000
106,700.0000
120,100.0000
75.00
57.50
800.00
66.75
1.00
1.07
6.01
1,007.32
1,007.00
kg
ltr
ltr
jam
org
org
org
org
0.0400
0.0300
0.0040
0.0170
0.0040
0.0020
0.0002
0.0002
26,000.00
7,500.00
57,500.00
100,000.00
66,750.00
100,100.00
106,700.00
120,100.00
1,040.00
225.00
230.00
1,700.00
267.00
200.20
21.34
24.02
2,667.56
2,668.00
M2
Oh
Oh
Oh
Oh
1.0000
1.0500
1.5000
0.1050
0.0052
337,300.00
66,750.00
100,100.00
106,700.00
120,100.00
337,300.00
70,087.50
150,150.00
11,203.50
624.52
569,365.52
569,366.00
m2
Oh
Oh
Oh
Oh
Dibulatkan
1.0000
1.0500
1.0500
0.1050
0.0052
207,500.00
66,750.00
100,100.00
106,700.00
120,100.00
207,500.00
70,087.50
105,105.00
11,203.50
624.52
394,520.52
394,521.00
Page 96
m'
Oh
Oh
Oh
Oh
11.5000
1.2000
1.2000
0.0120
0.0006
6,050.00
66,750.00
100,100.00
106,700.00
120,100.00
69,575.00
80,100.00
120,120.00
1,280.40
72.06
271,147.46
271,147.00
M2
kg
M2
Oh
Oh
Oh
Oh
1.1000
0.0200
0.0018
0.1000
0.1000
0.0100
0.0050
37,000.00
24,000.00
6,405,800.00
66,750.00
100,100.00
106,700.00
120,100.00
40,700.00
480.00
11,530.44
6,675.00
10,010.00
1,067.00
600.50
71,062.94
71,063.00
m'
Kg
M3
Kg
Oh
Oh
Oh
Oh
1.0500
0.0150
0.0096
0.2500
0.1500
0.4000
0.0250
0.0013
22,885.00
24,000.00
6,155,500.00
33,500.00
66,750.00
100,100.00
106,700.00
120,100.00
Dibulatkan
24,029.25
360.00
59,092.80
8,375.00
10,012.50
40,040.00
2,667.50
156.13
144,733.18
144,733.00
K-10 1 m' Talang 1/2 lingkaran D-15 cm, seng pelat BJLS 28 lebar 90 cm
- Seng plat 3' x 6' BJLS 30
m'
- Paku biasa " - 1"
Kg
- Kayu papan borneo super
kg
- Besi strip
Kg
- Pekerja
Oh
- Tukang kayu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1.0500
0.1000
0.0190
0.5000
0.1500
0.3000
0.0300
0.0080
22,885.00
24,000.00
6,155,500.00
29,500.00
66,750.00
100,100.00
106,700.00
120,100.00
24,029.25
2,400.00
116,954.50
14,750.00
10,012.50
30,030.00
3,201.00
960.80
202,338.05
202,338.00
Page 97
K-11
Dibulatkan
K-12 1 m' Pasang kusen pintu/jendela alluminium warna 4"
- Alumunium profil warna 4"
- Skrup fixer
- Sealant
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
K-13 1 m' Pasang kusen pintu/jendela alluminium natural 3"
- Alumunium profil natural 3"
- Skrup fixer
- Sealant
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
K-14 1 m' Pasang kusen pintu/jendela alluminium warna 3"
- Alumunium profil warna 3"
- Skrup fixer
- Sealant
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
K-15 1 m2 Pintu alluminium strip lebar 8 cm
- Alumunium profil 4" natural
- Alumunium strip 6mm
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
m'
bh
m'
Oh
Oh
Oh
Oh
1.1000
2.0000
1.0000
0.0430
0.0430
0.0043
0.0021
151,100.00
300.00
8,300.00
66,750.00
100,100.00
106,700.00
120,100.00
166,210.00
600.00
8,300.00
2,870.25
4,304.30
458.81
252.21
182,995.57
182,996.00
m'
bh
m'
Oh
Oh
Oh
Oh
1.1000
2.0000
1.0000
0.0430
0.0430
0.0043
0.0021
163,000.00
300.00
8,300.00
66,750.00
100,100.00
106,700.00
120,100.00
179,300.00
600.00
8,300.00
2,870.25
4,304.30
458.81
252.21
196,085.57
196,086.00
m'
bh
m'
Oh
Oh
Oh
Oh
1.1000
2.0000
1.0000
0.0430
0.0430
0.0043
0.0021
89,100.00
300.00
8,300.00
66,750.00
100,100.00
106,700.00
120,100.00
98,010.00
600.00
8,300.00
2,870.25
4,304.30
458.81
252.21
114,795.57
114,796.00
m'
bh
m'
Oh
Oh
Oh
Oh
1.1000
2.0000
1.0000
0.0430
0.0430
0.0043
0.0021
112,200.00
300.00
8,300.00
66,750.00
100,100.00
106,700.00
120,100.00
123,420.00
600.00
8,300.00
2,870.25
4,304.30
458.81
252.21
140,205.57
140,206.00
m'
m2
Oh
Oh
Oh
Oh
Dibulatkan
4.4000
1.0500
0.0850
0.0850
0.0085
0.0042
151,100.00
189,000.00
66,750.00
100,100.00
106,700.00
120,100.00
664,840.00
198,450.00
5,673.75
8,508.50
906.95
504.42
878,883.62
878,884.00
Page 98
m'
m'
tube
Oh
Oh
Oh
Oh
Dibulatkan
1 m2 Rangka jendela besi square tube (5 x 5) cm
- Besi square tube
- Besi lis kaca (1 x 1) cm
- Pengelasan
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
151,100.00
13,500.00
8,300.00
66,750.00
100,100.00
106,700.00
120,100.00
664,840.00
60,750.00
2,241.00
5,673.75
8,508.50
906.95
600.50
743,520.70
743,521.00
m'
m'
tube
Oh
Oh
Oh
Oh
4.4000
4.5000
0.2700
0.0850
0.0850
0.0085
0.0050
163,000.00
13,500.00
8,300.00
66,750.00
100,100.00
106,700.00
120,100.00
717,200.00
60,750.00
2,241.00
5,673.75
8,508.50
906.95
600.50
795,880.70
795,881.00
m2
bh
m'
Oh
Oh
Oh
Oh
Dibulatkan
K-19 1 m2 Pintu pelat baja tebal 2mm rangkap, rangka baja siku
- Besi siku L 30.30.3
Kg
- Baja pelat
Kg
- kawat las
Kg
- Pekerja
Oh
- Tukang kayu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
K-20
4.4000
4.5000
0.2700
0.0850
0.0850
0.0085
0.0050
1.1000
10.0000
7.0000
0.2000
0.2000
0.0200
0.0010
330,000.00
300.00
6,050.00
66,750.00
100,100.00
106,700.00
120,100.00
363,000.00
3,000.00
42,350.00
13,350.00
20,020.00
2,134.00
120.10
443,974.10
443,974.00
15.0000
32.8000
0.0500
0.2000
0.2000
0.0200
0.0010
26,400.00
26,400.00
26,000.00
66,750.00
100,100.00
106,700.00
120,100.00
396,000.00
865,920.00
1,300.00
13,350.00
20,020.00
2,134.00
120.10
1,298,844.10
1,298,844.00
M
Kg
Cm
Oh
Oh
Oh
Oh
Dibulatkan
4.7600
4.5220
20.0000
0.6500
0.6500
0.0650
0.0320
8,050.00
26,400.00
2,668.00
66,750.00
100,100.00
106,700.00
120,100.00
38,318.00
119,380.80
53,360.00
43,387.50
65,065.00
6,935.50
3,843.20
330,290.00
330,290.00
Page 99
K-21
M2
Oh
Oh
Oh
Oh
1.0000
1.0500
1.0500
0.1050
0.0052
551,900.00
66,750.00
100,100.00
106,700.00
120,100.00
551,900.00
70,087.50
105,105.00
11,203.50
624.52
738,920.52
738,921.00
M2
Oh
Oh
Oh
Oh
1.0000
0.3500
0.3500
0.0350
0.0018
592,000.00
66,750.00
100,100.00
106,700.00
120,100.00
592,000.00
23,362.50
35,035.00
3,734.50
216.18
654,348.18
Dibulatkan
654,348.00
Page 100
L-01
Bh
Oh
Oh
Oh
Oh
1.0000
0.0600
0.6000
0.0600
0.0030
369,500.00
66,750.00
100,100.00
106,700.00
120,100.00
Dibulatkan
L-03
440,327.00
1.0000
0.0050
0.5000
0.0050
0.0025
104,000.00
66,750.00
100,100.00
106,700.00
120,100.00
Dibulatkan
L-05
L-06
Dibulatkan
104,000.00
333.75
50,050.00
533.50
300.25
155,217.50
155,218.00
369,500.00
4,005.00
60,060.00
6,402.00
360.30
440,327.30
1.0000
0.0100
0.1000
0.0100
0.0005
16,500.00
66,750.00
100,100.00
106,700.00
120,100.00
16,500.00
667.50
10,010.00
1,067.00
60.05
28,304.55
28,305.00
Bh
Oh
Oh
Oh
Oh
1.0000
0.0150
0.1500
0.0150
0.0008
4,000.00
66,750.00
100,100.00
106,700.00
120,100.00
4,000.00
1,001.25
15,015.00
1,600.50
96.08
21,712.83
21,713.00
L-07
L-08
L-09
1.0000
0.0500
0.5000
0.0500
0.0025
462,000.00
66,750.00
100,100.00
106,700.00
120,100.00
462,000.00
3,337.50
50,050.00
5,335.00
300.25
521,022.75
521,023.00
1.0000
0.0500
0.5000
0.0500
0.0025
226,000.00
66,750.00
100,100.00
106,700.00
120,100.00
226,000.00
3,337.50
50,050.00
5,335.00
300.25
285,022.75
285,023.00
M2
Oh
Oh
Oh
Oh
1.1000
0.0150
0.1500
0.0150
0.0008
96,200.00
66,750.00
100,100.00
106,700.00
120,100.00
105,820.00
1,001.25
15,015.00
1,600.50
90.08
123,526.83
123,527.00
M. PEKERJAAN SANITASI
No.
M-02
M-03
M-04
M-05
URAIAN
1 Buah Urinoir
Urinoir
P.C (50 gk)
Pasir pasang
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 30 % harga urinoir
Jumlah
Dibulatkan
1 Buah Wastafel
wastafel standar
P.C (50 gk)
Pasir pasang
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 12 % harga wastafel
Jumlah
Dibulatkan
SAT
VOLUME
HARGA SAT
(Rp)
HARGA
(Rp)
bh
Kg
m3
org
org
org
org
lot
1.00
6.00
0.01
1.0000
1.0000
0.1000
0.0010
0.3000
1,952,500.00
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
1,952,500.00
1,952,500.00
8,928.00
2,334.00
66,750.00
100,100.00
10,670.00
120.10
585,750.00
2,727,152.10
2,727,152.00
unit
Kg
m3
org
org
org
org
lot
1.00
6.00
0.01
1.2000
1.4500
0.1500
0.1000
0.1200
1,115,000.00
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
1,952,500.00
1,115,000.00
8,928.00
2,334.00
80,100.00
145,145.00
16,005.00
12,010.00
234,300.00
1,613,822.00
1,613,822.00
1.00
1.8000
2.7000
0.5400
0.1100
0.1800
281,000.00
66,750.00
100,100.00
106,700.00
120,100.00
281,000.00
281,000.00
120,150.00
270,270.00
57,618.00
13,211.00
50,580.00
792,829.00
792,829.00
1.10
25.00
10.300
0.061
0.069
0.3800
0.1900
0.0190
0.0190
68,000.00
750.00
1,488.00
233,400.00
181,232.00
66,750.00
100,100.00
106,700.00
120,100.00
74,800.00
18,750.00
15,326.40
14,237.40
12,505.01
25,365.00
19,019.00
2,027.30
2,281.90
184,312.01
184,312.00
No.
M-06
M-09
M-10
URAIAN
SAT
VOLUME
HARGA SAT
(Rp)
HARGA
(Rp)
186.00
114.000
0.184
0.033
4.850
0.120
2.1600
0.7200
0.0720
0.1080
0.1000
750.00
1,488.00
233,400.00
211,100.00
16,500.00
255,400.00
66,750.00
100,100.00
106,700.00
120,100.00
66,750.00
139,500.00
169,632.00
42,945.60
6,966.30
80,025.00
30,648.00
144,180.00
72,072.00
7,682.40
12,970.80
6,675.00
713,297.10
713,297.00
m'
org
org
org
org
lot
1.2000
0.0360
0.0600
0.0060
0.0018
0.3500
16,250.00
66,750.00
100,100.00
106,700.00
120,100.00
19,500.00
19,500.00
2,403.00
6,006.00
640.20
216.18
6,825.00
35,590.38
35,590.00
m'
org
org
org
org
lot
1.2000
0.0360
0.0600
0.0060
0.0018
0.3500
27,500.00
66,750.00
100,100.00
106,700.00
120,100.00
33,000.00
33,000.00
2,403.00
6,006.00
640.20
216.18
11,550.00
53,815.38
53,815.00
No.
M-11
M-14
URAIAN
1 M' Pipa PVC 2" (AW)
Pipa pvc 2"
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 35 % harga pipa
Jumlah
Dibulatkan
SAT
VOLUME
HARGA SAT
(Rp)
HARGA
(Rp)
m'
org
org
org
org
lot
1.2000
0.0360
0.0600
0.0060
0.0018
0.3500
30,000.00
66,750.00
100,100.00
106,700.00
120,100.00
36,000.00
36,000.00
2,403.00
6,006.00
640.20
216.18
12,600.00
57,865.38
57,865.00
bh
org
org
org
org
1.0000
0.0300
0.3000
0.0300
0.0015
374,000.00
66,750.00
100,100.00
106,700.00
120,100.00
374,000.00
2,002.50
30,030.00
3,201.00
180.15
409,413.65
409,414.00
No.
M-17
M-18
M-19
M-20
M-21
URAIAN
1 M' Grafel beton U 20 cm -60 cm
Pipa beton U
Bata merah
P.C (50 gk)
Pasir pasang
Pasir urug
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 M' Pasang Talang Plastik PVC U 15 cm (AW)
Talang plastik PVC
Perlengkapan 35 % harga talang
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 M' Saluran Air Limbah Buis Beton 60 cm
Buis beton 60 cm
Bata merah
P.C (50 gk)
Pasir pasang
Pasir urug
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 M' Pasang Talang Seng Datar
Seng pelat 3" x 6"
Paku
Kayu kelas II
Meni besi
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 Buah Closet Duduk
Closet duduk
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 6 % harga closet
Jumlah
Dibulatkan
SAT
VOLUME
HARGA SAT
(Rp)
HARGA
(Rp)
bh
bh
zak
m3
m3
org
org
org
org
1.1000
28.0000
0.1030
0.0305
0.0345
0.0100
0.1000
0.0100
0.0050
48,000.00
750.00
1,488.00
233,400.00
181,232.00
66,750.00
100,100.00
106,700.00
120,100.00
52,800.00
21,000.00
153.26
7,118.70
6,252.50
667.50
10,010.00
1,067.00
600.50
99,669.47
99,669.00
m'
lot
org
org
org
org
1.05000
0.3500
0.1500
0.4000
0.0250
0.0013
15,000.00
15,750.00
66,750.00
100,100.00
106,700.00
120,100.00
15,750.00
5,512.50
10,012.50
40,040.00
2,667.50
150.13
74,132.63
74,133.00
bh
bh
zak
m3
m3
org
org
org
org
1.10
25.00
0.206
0.061
0.069
0.3800
0.1900
0.0190
0.0190
135,000.00
750.00
1,488.00
233,400.00
181,232.00
66,750.00
100,100.00
106,700.00
120,100.00
148,500.00
18,750.00
306.53
14,237.40
12,505.01
25,365.00
19,019.00
2,027.30
2,281.90
242,992.14
242,992.00
lbr
kg
m3
kg
org
org
org
org
0.50000
0.01500
0.00960
0.2500
0.1500
0.4000
0.0250
0.0013
22,885.00
23,400.00
2,850,000.00
33,500.00
66,750.00
100,100.00
106,700.00
120,100.00
11,442.50
351.00
27,360.00
8,375.00
10,012.50
40,040.00
2,667.50
150.13
100,398.63
100,399.00
bh
org
org
org
org
lot
1.00
3.3000
1.1000
0.0010
0.1600
0.0600
1,897,500.00
66,750.00
100,100.00
106,700.00
120,100.00
1,897,500.00
1,897,500.00
220,275.00
110,110.00
106.70
19,216.00
113,850.00
2,361,057.70
2,361,058.00
No.
M-22
M-23
M-24
URAIAN
1 Buah Tangki Air fibreglass Volume 1 m3
Bak fibreglass kapasitas 1 m3
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 6 % harga bak
Jumlah
Dibulatkan
1 Unit Septictank 2x1,50x1,50 m + Rembesan
Galian tanah
Pasir urug
lantai kerja
Pas bata adk 1pc : 3ps
Pelat beton K-225
Plesteran adk 1pc : 3ps
Pipa PVC 4" jenis AW
Pipa GIP 1 1/2"
Galian tanah untuk rembesan
Pas ijuk
Urugan kerikil 3/5
Pipa PVC 4" berlubang jenis AW
Urugan dan perataan tanah
Jumlah
Dibulatkan
1 Unit Septictank 1x1,50x1,50 m + Rembesan
Galian tanah
Pasir urug
lantai kerja
Pas bata adk 1pc : 3ps
Pelat beton K-225
Plesteran adk 1pc : 3ps
Pipa PVC 4" jenis AW
Pipa GIP 1 1/2"
Galian tanah untuk rembesan
Pas ijuk
Urugan kerikil 3/5
Pipa PVC 4" berlubang jenis AW
Urugan dan perataan tanah
Jumlah
Dibulatkan
SAT
VOLUME
HARGA SAT
(Rp)
HARGA
(Rp)
bh
org
org
org
org
lot
1.00
3.3000
1.1000
0.0010
0.1600
0.0600
1,448,500.00
66,750.00
100,100.00
106,700.00
120,100.00
1,448,500.00
1,448,500.00
220,275.00
110,110.00
106.70
19,216.00
86,910.00
1,885,117.70
1,885,118.00
m3
m3
m3
m2
m3
m2
m'
m'
m3
kg
m3
m'
m3
4.500
0.214
2.250
15.000
0.300
15.000
5.400
5.000
3.375
5.400
1.050
9.000
1.125
41,355.70
181,232.00
794,523.16
244,413.50
6,465,350.00
56,491.86
265,000.00
51,433.33
31,504.00
25,800.00
211,970.00
40,500.00
54,477.90
186,100.65
38,783.65
1,787,677.11
3,666,202.50
1,939,605.00
847,377.90
1,431,000.00
257,166.67
106,326.00
139,320.00
222,568.50
364,500.00
61,287.64
11,047,915.61
11,047,916.00
m3
m3
m3
m2
m3
m2
m'
m'
m3
kg
m3
m'
m3
2.250
0.107
1.125
7.500
0.150
7.500
9.000
2.500
1.688
2.700
0.525
9.000
0.563
31,504.00
181,232.00
794,523.16
244,413.50
6,465,350.00
56,491.86
265,000.00
51,433.33
31,504.00
25,800.00
211,970.00
40,500.00
54,477.90
70,884.00
19,391.82
893,838.56
1,833,101.25
969,802.50
423,688.95
2,385,000.00
128,583.33
53,178.75
69,660.00
111,284.25
364,500.00
30,671.06
7,353,584.47
7,353,584.00
N-01
N-02
0.0500
0.1500
0.0025
39,500.00
66,750.00
120,100.00
1,975.00
10,012.50
300.25
12,287.75
12,288.00
0.0800
0.0200
0.0100
0.0400
0.0400
0.0040
0.0025
40,000.00
42,300.00
30,644.00
66,750.00
100,100.00
106,700.00
120,100.00
3,200.00
846.00
306.44
2,670.00
4,004.00
426.80
300.25
11,753.49
Dibulatkan
N-04
N-04
0.2000
0.1500
0.1700
0.3500
0.0700
0.1050
0.0040
0.0025
33,500.00
27,500.00
35,000.00
45,900.00
66,750.00
100,100.00
106,700.00
120,100.00
Dibulatkan
1 M2 Pengecatan Bidang Kayu Baru Setara Sieve 2 x Laburan
Pengecat 2 X Laburan
N-06
11,753.00
6,700.00
4,125.00
5,950.00
16,065.00
4,672.50
10,510.50
426.80
300.25
48,750.05
48,750.00
48,750.0000
0.67
32,500.00
Jumlah
32,500.00
Dibulatkan
32,500.00
0.3500
0.1000
9,000.00
66,750.00
3,150.00
6,675.00
- Mandor
Jumlah
Dibulatkan
Oh
0.0060
120,100.00
720.60
10,545.60
10,546.00
N-07
Kg
Kg
Kg
Oh
Oh
Oh
Oh
0.1000
0.1000
0.2600
0.0200
0.0630
0.0063
0.0025
27,500.00
35,000.00
82,500.00
66,750.00
100,100.00
106,700.00
120,100.00
Dibulatkan
N-09
2,750.00
3,500.00
21,450.00
1,335.00
6,306.30
672.21
300.25
36,313.76
36,314.00
Kg
Kg
Bh
Ls
Lbr
Oh
Oh
Oh
Oh
0.2000
0.1600
0.0100
1.0000
0.5000
0.2000
0.3000
0.0300
0.0100
82,500.00
27,500.00
35,000.00
1,000.00
5,500.00
66,750.00
100,100.00
106,700.00
120,100.00
Dibulatkan
16,500.00
4,400.00
350.00
1,000.00
2,750.00
13,350.00
30,030.00
3,201.00
1,201.00
72,782.00
72,782.00
0.3333
61,782.00
20,594.00
Jumlah
20,594.00
Dibulatkan
20,594.00
Kg
Kg
Bh
Ls
Lbr
Oh
Oh
Oh
Oh
0.1300
0.0100
0.6700
0.2200
0.1000
0.1500
0.0200
0.0100
26,000.00
27,500.00
35,000.00
1,000.00
5,500.00
66,750.00
100,100.00
106,700.00
120,100.00
3,380.00
0.00
350.00
670.00
1,210.00
6,675.00
15,015.00
2,134.00
1,201.00
N-11
Jumlah
30,635.00
Dibulatkan
30,635.00
1 M2 Memasang Wallpaper
- Wallpaper
- Lem Perekat
- Pekerja
- Tukang cat
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
m2
Kg
Oh
Oh
Oh
Oh
1.2000
0.2500
0.3500
0.1750
0.0170
0.0017
61,500.00
39,300.00
66,750.00
100,100.00
106,700.00
120,100.00
73,800.00
9,825.00
23,362.50
17,517.50
1,813.90
204.17
126,523.07
126,523.00
N-12
N-13
N-14
N-15
33,500.00
16,500.00
66,750.00
100,100.00
106,700.00
120,100.00
3,350.00
165.00
1,335.00
20,020.00
2,134.00
1,201.00
28,205.00
28,205.00
33,500.00
16,500.00
2,276,800.00
66,750.00
100,100.00
106,700.00
120,100.00
3,350.00
165.00
4,553.60
16,687.50
22,522.50
2,400.75
900.75
50,580.10
Dibulatkan
1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara manual 1 lps cat 2 um
- Cat besi setara ICI
Kg
0.3000
74,500.00
- Pekerja
Oh
0.0060
66,750.00
- Tukang cat
Oh
0.0600
100,100.00
- Kepala tukang
Oh
0.0120
106,700.00
- Mandor
Oh
0.0060
120,100.00
Jumlah
50,580.00
Dibulatkan
1 M2 Pengecatan Tembok Baru Setara Vinilex (2 x laburan)
- Plamir tembok
Kg
- Cat dasar
Kg
- Cat penutup 2x setara vinilex
Kg
- Pekerja
Oh
- Tukang cat
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
30,758.00
Dibulatkan
N-15r' 1 M2 Pengecatan Tembok Baru Setara Vinilex (3 x laburan)
- Plamir tembok
Kg
- Cat dasar
Kg
- Cat penutup 3x setara vinilex
Kg
- Pekerja
Oh
- Tukang cat
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
0.1000
0.1000
0.2600
0.0200
0.0630
0.0063
0.0025
27,500.00
35,000.00
27,500.00
66,750.00
100,100.00
106,700.00
120,100.00
2,750.00
3,500.00
7,150.00
1,335.00
6,306.30
672.21
300.25
22,013.76
22,014.00
0.1000
0.1000
0.3900
0.0300
0.0945
0.0095
0.0038
27,500.00
35,000.00
27,500.00
66,750.00
100,100.00
106,700.00
120,100.00
Dibulatkan
N-16
22,350.00
400.50
6,006.00
1,280.40
720.60
30,757.50
2,750.00
3,500.00
10,725.00
2,002.50
9,459.45
1,013.65
456.38
29,906.98
29,907.00
Kg
Kg
Oh
Oh
Oh
Oh
0.1200
0.2600
0.0280
0.0420
0.0042
0.0025
35,000.00
27,500.00
66,750.00
100,100.00
106,700.00
120,100.00
4,200.00
7,150.00
1,869.00
4,204.20
448.14
300.25
18,171.59
18,172.00
1 UNIT Pasang partisi Alumunium, Daun partisi Multiplek rangka kayu Kamper
Bahan
7.6200
m'
Kusen Alumunium Natural Uk 4" + upah 20%
1.3500
lbr
Multiplek 9 mm
0.0300
m3
Kayu papan kamper medan
11.7000
m'
List kayu profil 1 cm
0.1000
kg
Paku biasa " - 1"
0.2500
kg
Lem putih FOX
4.0000
bh
Grendel jendela 2"
2.0000
bh
Handle partisi
1.5400
m2
Cat kayu
4.8600
m2
Cat tembok
181,320.00
166,500.00
6,405,800.00
9,800.00
24,000.00
26,300.00
6,000.00
36,300.00
48,750.00
22,014.00
1,381,658.40
224,775.00
192,174.00
114,660.00
2,400.00
6,575.00
24,000.00
72,600.00
75,075.00
106,988.04
2,200,905.44
66,750.00
100,100.00
106,700.00
120,100.00
20,025.00
130,130.00
13,871.00
1,561.30
165,587.30
2,366,492.74
Jumlah I
Tenaga
0.3000
1.3000
0.1300
0.0130
Oh
Oh
Oh
Oh
Pekerja Terampil
Tukang kayu Terampil
Kepla Tukang Kayu
Mandor
Jumlah II
Jumlah I + II
2
1 UNIT Pek. Kusen Jendela Alumunium uk. 2 X 1,50 M' ( 3 lubang ) dgn 2 Daun Jendela
Bahan
12.0000
m'
Profil aluminium 4" natural + upah 20%
5.4000
m'
Profil daun jendela alm. + upah 20%
1.8100
m2
Kaca polos 5 mm
2.0000
ps
Engsel jendela 3"
2.0000
bh
Slot Handle jendela
2.0000
bh
Hak Kait angin jendela biasa
0.0000
ls
Acesories ( 5 % )
181,320.00
118,560.00
122,100.00
16,500.00
36,300.00
8,000.00
151,853.25
2,175,840.00
640,224.00
221,001.00
33,000.00
72,600.00
16,000.00
151,853.25
3,310,518.250
1 UNIT Pek. Kusen Jendela Alumunium uk. 1,35 X 1,50 M' ( 2 lubang ) dgn 1 Daun Jendela
Bahan
9.0000
m'
Profil aluminium 4" natural + upah 20%
2.7000
m'
Profil daun jendela alm. + upah 20%
1.4850
m2
Kaca polos 5 mm
1.0000
ps
Engsel jendela 3"
1.0000
bh
Slot Handle jendela
1.0000
bh
Hak Kait angin jendela biasa
0.0000
ls
Acesories ( 5 % )
181,320.00
118,560.00
122,100.00
16,500.00
36,300.00
8,000.00
106,665.53
1,631,880.00
320,112.00
181,318.50
16,500.00
36,300.00
8,000.00
106,665.53
2,300,776.025
181,320.00
118,560.00
122,100.00
465,038.00
2,556,612.00
320,112.00
201,465.00
781,263.84
16,500.00
36,300.00
8,000.00
23,100.00
6,000.00
139,500.00
153,909.45
16,500.00
36,300.00
16,000.00
34,650.00
6,000.00
139,500.00
153,909.45
4,262,312.290
181,320.00
122,100.00
465,038.00
1,269,240.00
45,177.00
781,263.84
23,100.00
6,000.00
139,500.00
104,784.04
34,650.00
6,000.00
139,500.00
104,784.04
2,380,614.882
181,320.00
122,100.00
465,038.00
1,269,240.00
45,177.00
781,263.84
147,500.00
23,100.00
6,000.00
139,500.00
104,784.04
247,800.00
34,650.00
6,000.00
139,500.00
104,784.04
2,523,630.840
1 UNIT Pek. Kusen Pintu Jendela Alumunium uk. 2,2 X 2,70 M' ( 2 lb. Jendela + 1 lb. Pintu )
Bahan
14.1000
m'
Profil aluminium 4" natural + upah 20%
2.7000
m'
Profil daun jendela alm. + upah 20%
1.6500
m2
Kaca polos 5 mm
1.6800
m2
Daun pintu panel Multiplek 9 mm
rangka ky. Kamper Medan/Kruing
1.0000
ps
Engsel jendela 3"
1.0000
bh
Slot Handle jendela
2.0000
bh
Hak Kait angin jendela biasa
1.5000
ps
Engsel pintu 4"
1.0000
bh
Grendel pintu 2"
1.0000
bh
Kunci tanam 2 slaagh (Royal)
0.0000
ls
Acesories ( 5 % )
1 UNIT Pekerjaan Kusen Pintu Alumunium uk. KM lapis pormika 0,8 X 2,70 M'
Bahan
7.0000
m'
Profil aluminium 4" natural + upah 20%
0.3700
m2
Kaca polos 5 mm
1.6800
m2
Daun pintu panel Multiplek 9 mm
rangka ky. Kamper Medan/Kruing
1.6800
m2
Plat Alm
1.5000
ps
Engsel pintu 4"
1.0000
bh
Grendel pintu 2"
1.0000
bh
Kunci tanam 2 slaagh (Royal)
0.0000
ls
Acesories ( 5 % )
1 UNIT Pek. Kusen Jendela Alumunium uk. 2,65 X 1,50 M' ( 4 lubang ) dgn 2 Daun Jendela
Page 114
K (2)
Bahan
15.4500
5.4000
2.5500
2.0000
2.0000
2.0000
0.0000
m'
m'
m2
ps
bh
bh
ls
Page 115
181,320.00
118,560.00
122,100.00
16,500.00
36,300.00
8,000.00
187,648.65
2,801,394.00
640,224.00
311,355.00
33,000.00
72,600.00
16,000.00
187,648.65
4,062,221.650
K (2)
10
11
12
1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk. 2,85 X 2,70 M' ( 3 lb. Jendela + 1 lb. Pintu )
Bahan
17.5500
m'
Profil aluminium 4" natural + upah 20%
5.4000
m'
Profil daun jendela alm. + upah 20%
2.4000
m2
Kaca polos 5 mm
1.6800
m2
Daun pintu panel Multiplek 9 mm
rangka ky. Kamper Medan/Kruing
2.0000
ps
Engsel jendela 3"
2.0000
bh
Slot Handle jendela
2.0000
bh
Hak Kait angin jendela biasa
1.5000
ps
Engsel pintu 4"
1.0000
bh
Grendel pintu 2"
1.0000
bh
Kunci tanam 2 slaagh (Royal)
0.0000
ls
Acesories ( 5 % )
181,320.00
118,560.00
122,100.00
465,038.00
3,182,166.00
640,224.00
293,040.00
781,263.84
16,500.00
36,300.00
8,000.00
23,100.00
6,000.00
139,500.00
205,771.50
33,000.00
72,600.00
16,000.00
34,650.00
6,000.00
139,500.00
205,771.50
5,404,215.340
181,320.00
122,100.00
465,038.00
1,613,748.00
79,365.00
1,269,553.74
23,100.00
56,800.00
139,500.00
148,133.34
34,650.00
56,800.00
139,500.00
148,133.34
3,341,750.077
181,320.00
122,100.00
465,038.00
1,595,616.00
85,470.00
1,367,211.72
23,100.00
56,800.00
139,500.00
152,414.89
34,650.00
56,800.00
139,500.00
152,414.89
3,431,662.606
181,320.00
122,100.00
465,038.00
1,949,190.00
130,647.00
781,263.84
23,100.00
56,800.00
139,500.00
143,055.04
34,650.00
56,800.00
139,500.00
143,055.04
3,235,105.882
181,320.00
38,500.00
61,636.60
924,732.00
308,000.00
61,636.60
1,294,368.600
181,320.00
122,100.00
37,729.20
725,280.00
29,304.00
37,729.20
792,313.200
181,320.00
122,100.00
43,727.40
815,940.00
58,608.00
43,727.40
918,275.400
1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,30 X 2,80 M' ( 2 Daun Pintu )
Bahan
8.9000
m'
Profil aluminium 4" natural + upah 20%
0.6500
m2
Kaca polos 5 mm
2.7300
m2
Daun pintu panel Multiplek 9 mm
rangka ky. Kamper Medan/Kruing
1.5000
ps
Engsel pintu 4"
1.0000
ps
spagnolet tanam
1.0000
bh
Kunci tanam 2 slaagh (Royal)
0.0000
ls
Acesories ( 5 % )
1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,50 X 2,70 M' ( 2 Daun Pintu )
Bahan
8.8000
m'
Profil aluminium 4" natural + upah 20%
0.7000
m2
Kaca polos 5 mm
2.9400
m2
Daun pintu panel Multiplek 9 mm
rangka ky. Kamper Medan/Kruing
1.5000
ps
Engsel pintu 4"
1.0000
ps
spagnolet tanam
1.0000
bh
Kunci tanam 2 slaagh (Royal)
0.0000
ls
Acesories ( 5 % )
1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk.1,55 X 2,70 M' ( 1 lb. Jendela + 1 lb. Pintu )
Bahan
10.7500
m'
Profil aluminium 4" natural + upah 20%
1.0700
m2
Kaca polos 5 mm
1.6800
m2
Daun pintu panel Multiplek 9 mm
rangka ky. Kamper Medan/Kruing
1.5000
ps
Engsel pintu 4"
1.0000
ps
spagnolet tanam
1.0000
bh
Kunci tanam 2 slaagh (Royal)
0.0000
ls
Acesories ( 5 % )
Page 116
K (2)
13
14
181,320.00
122,100.00
62,418.00
1,160,448.00
87,912.00
62,418.00
1,310,778.000
181,320.00
122,100.00
81,108.60
1,504,956.00
117,216.00
81,108.60
1,703,280.600
Page 117
K (2)
NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
URAIAN
Mandor
Kepala Tukang Batu
Kepala Tukang Kayu
Kepala Tukang Besi
Kepala Tukang Cat
Kepala Tukang Listrik
Kepala Tukang
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Tukang Cat
Tukang Listrik
Tukang Pipa
Tukang Plitur
Tukang Taman
Tukang
Pembantu Tukang
Pekerja Biasa
Penjaga Malam
Sopir
Operator
Mekanik
Pembantu Sopir
Pembantu Operator
Pembantu Mekanik
SATUAN
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
UPAH (Rp.)
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
120,100.00
106,700.00
106,700.00
106,700.00
106,700.00
106,700.00
106,700.00
100,100.00
100,100.00
100,100.00
100,100.00
100,100.00
100,100.00
100,100.00
100,100.00
100,100.00
66,750.00
66,750.00
66,750.00
93,400.00
93,400.00
100,100.00
80,000.00
80,000.00
86,700.00
AH
KETERANGAN
NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
MATERIAL
Pasir Urug
Pasir Pasang Kali
Pasir Beton
Batu Pecah Mesin 2/3
Batu Belah Pondasi
Bata Merah Bakar kelas II
Semen PC /50 kg
Semen Warna
Plamir Tembok
Cat Tembok ICI Interior ( Plafon Dan Dinding )
Cat Dasar
Rool Cat Tembok
Soligneum 1 Blek
Politur
Politur Jadi
Ampelas
Cat Kayu Sieve
Kayu Balok Borneo Super
Kayu Papan Borneo Super
Kayu Balok Kamper Medan (Kruing )
Kayu Papan Kamper Medan (Kruing )
Kayu Balok Albasia
Kayu Papan Albasia
Dolken 7 s/d 10
List Profil Kamper 2 cm
Kayu Kaso 4/6
Kayu Kaso 5/7
Kayu Reng 3/4 Kamper Banjar
Kayu Papan Terentang
Kayu Balok Terentang
Gypsum 120 x 240 t= 9 mm ex DN
Tepung gypsum
Cotton Plester
GRC (120 x 240) cm, t = 4 mm
Cornice Coumpound
List gypsum
Triplek 4 mm 120 x 240
MultiPlek 9 mm 120 x 240
Teak Wood 4 mm 120 x 240
Keramik 20 x 25 Dinding KM KW I DN Corak Mulia
Keramik 40 x 40 KWI DN Warna/Corak (ANTI SLIP) Mulia
Besi Beton U-24 Rata-rata
Spandek zincalume
Bubungan Atap Spandek
Kawat Beton
Lem Fox
SAT
m3
m3
m3
m3
m3
bh
zak
kg
kg
lt
kg
bh
kg
lt
lt
lbr
lt
m3
m3
m3
m3
m3
m3
bt
m1
m3
m3
m1
m3
m3
lbr
kg
bh
lbr
zak
m'
lbr
lbr
lbr
m2
m2
kg
m2
kg
kg
NO
47 Kaca Polos 5 mm ( ASAHI )
48 Paku 1/2" s/d 2"
MATERIAL
SAT
m2
kg
NO
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
MATERIAL
Paku 2" s/d 5"
Paku skrup 3"
Paku GRC
Paku gypsum
Pipa PVC RUCIKA type AW 1/2"
Pipa PVC RUCIKA type AW 3/4"
Pipa PVC RUCIKA type AW 3"
Pipa PVC RUCIKA type AW 4"
Solatip Ledeng
Saringan Air Lt. KM Stainless Steel
Kran Tembok ITAP dia. 1/2"
Kran Bebek ITAP 1/2"
Closet Jongkok Standard Putih Poslin TOTO
Kitchen Zink Stainless Standard Lokal ( 1 Lubang )
Saklar Broko Tunggal Standard ( 1 Phase )
Saklar Broko Seri Standard ( 1 Phase )
Stop Kontak Broko Standard ( 1 Phase )
Stop Kontak AC
Stop kontak Lantai (Floor Dak) Power
Stop kontak Lantai (Floor Dak) Sound System
Instalas Titik Lampu / Stop Kontak (Upah dan Alat)
Lampu TL 36 Watt
Down Light + SL 25 W
Lampu SL Philip 25 W
SAT
kg
bh
kg
kg
bt
bt
bt
bt
gl
bh
bh
bh
unit
bh
bh
bh
bh
bh
bh
bh
ttk
bh
bh
bh
NO
73
74
75
76
77
78
79
MATERIAL
Lampu RMI 2x36 W Lengkap
Kunci 2 Slaag ROYAL
Sloot Pintu Berikut Rantai
Engsel Pintu Unilon Standard
Bak KM Fiber 60 x 60
Stereofoam
Oil Mesran 40 SAE (minyak bekisting)
SAT
bh
bh
bh
ps
bh
m2
lt
NAN
HARGA (Rp)
181,232.00
233,400.00
255,400.00
218,268.00
212,534.00
750.00
74,400.00
15,000.00
27,500.00
82,500.00
35,000.00
35,000.00
26,000.00
55,000.00
125,000.00
5,500.00
45,900.00
5,810,000.00
6,155,500.00
6,262,000.00
6,405,800.00
2,058,000.00
2,279,000.00
30,800.00
10,500.00
3,049,500.00
3,692,500.00
4,300.00
2,950,000.00
2,705,000.00
87,800.00
13,800.00
16,500.00
74,500.00
83,000.00
9,000.00
68,500.0
166,500.0
145,000.0
65,000.00
57,000.00
16,500.00
93,555.0
172,900.0
30,500.00
26,300.00
HARGA (Rp)
122,100.00
24,000.00
HARGA (Rp)
24,000.00
850.00
38,500.00
19,500.00
42,500.00
55,500.00
215,000.00
360,000.00
4,500.00
73,500.00
45,000.00
57,500.00
207,500.00
374,000.00
26,500.00
29,000.00
26,500.00
56,000.00
450,000.00
350,000.00
179,600.00
115,000.00
98,000.00
50,000.00
HARGA (Rp)
360,000.00
139,500.00
35,000.00
23,100.00
281,000.00
10,000.00
57,500.00
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
M3
Kg
0.0120
0.0200
2,058,000.00
24,000.00
M3
Oh
0.0070
0.1000
2,279,000.00
66,750.00
- Tukang Kayu
Oh
0.1000
100,100.00
- Kepala Tukang
- Mandor
Oh
Oh
0.0100
0.0050
106,700.00
120,100.00
Oh
Oh
0.1200
0.0090
66,750.00
120,100.00
Oh
Oh
0.1000
0.0090
66,750.00
120,100.00
0.0400
0.0050
0.0050
66,750.00
106,700.00
120,100.00
0.4000
0.0400
66,750.00
120,100.00
Oh
Oh
0.1920
0.0190
66,750.00
120,100.00
M3
Oh
Oh
1.2000
0.3000
0.0100
181,232.00
66,750.00
120,100.00
Jumlah
2
Dibulatkan
1 M2 Bongkaran Dinding Tembok Bata Merah
- Pekerja
- Mandor
Jumlah
Dibulatkan
1 M2 Bongkaran Tegel
- Pekerja
- Mandor
Jumlah
Dibulatkan
1 M2 Bongkaran Langit-langit (Plapond)
- Pekerja
- Kepala tukang
- Mandor
Jumlah
Oh
Oh
Oh
Dibulatkan
1 M3 Galian Tanah Biasa sedalam 1 m
- Pekerja
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1 M3 Urugan Kembali
- Pekerja
- Mandor
Jumlah
Dibulatkan
1 M3 Urugaan Pasir
- Pasir Urug
- Pekerja
- Mandor
Jumlah
Dibulatkan
10
M3
1.1000
212,534.00
- Semen Portland
- Pasir Pasang
- Pekerja
Kg
M3
Oh
136.0000
0.5440
1.5000
1,488.00
233,400.00
66,750.00
- Tukang Batu
- Kepala Tukang
Oh
Oh
0.6000
0.0600
100,100.00
106,700.00
- Mandor
Jumlah
Oh
0.0750
120,100.00
Dibulatkan
1 M3 Membuat Beton Tumbuk adk 1pc:2ps:4kr
- Semen Portland
Kg
291.0000
1,488.00
- Pasir Beton
- Batu Pecah Mesin 2/3
M3
M3
0.4700
0.9300
255,400.00
218,268.00
- Pekerja
Oh
2.0000
66,750.00
- Tukang Batu
- Kepala Tukang
Oh
Oh
0.3500
0.0350
100,100.00
106,700.00
- Mandor
Jumlah
Oh
1.0000
120,100.00
Dibulatkan
1 Kg Pembesian Dengan Besi Polos/ulir
- Besi Beton ( Polos / Ulir )
Kg
1.0500
16,500.00
- Kawat Beton
- Pekerja
- Tukang Besi
Kg
Oh
Oh
0.0150
0.0070
0.0070
30,500.00
66,750.00
100,100.00
- Kepala Tukang
- Mandor
Oh
Oh
0.0007
0.0003
106,700.00
120,100.00
0.0400
0.4000
0.2000
0.0150
0.3500
6.0000
0.3000
0.3300
0.0330
0.0060
2,950,000.00
24,000.00
57,500.00
2,705,000.00
166,500.00
30,800.00
66,750.00
100,100.00
106,700.00
120,100.00
Jumlah
11
Dibulatkan
1 M2 Pasang Bekesting Untuk Lantai
- Kayu papan terentang
M3
- Paku Biasa 2" - 5"
Kg
- Minyak Bekisting
Ltr
- Kayu balok terentang
M3
- MultiPlek 9 mm 120 x 240
Lbr
- Dolken -8-10/4m
Btg
- Pekerja
Oh
- Tukang Kayu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
12
1 M3 Sloof Beton Tulang 15/20 (180 kg besi + bekisting) 4 dia. 12 ring 8-15
- Kayu papan terentang
M3
0.2700
2,950,000.00
Kg
Kg
Kg
2.0000
180.0000
3.0000
24,000.00
16,500.00
30,500.00
- Semen Portland
- Pasir Beton
Kg
M3
323.0000
0.5200
1,488.00
255,400.00
M3
Oh
0.7800
4.8500
218,268.00
66,750.00
- Tukang Batu
Oh
0.3500
100,100.00
- Tukang Kayu
- Tukang Besi
Oh
Oh
1.5600
1.4000
100,100.00
100,100.00
- Kepala Tukang
- Mandor
Oh
Oh
0.3310
0.1700
106,700.00
120,100.00
Jumlah
13
14
Dibulatkan
1 M3 Kolom Beton Tulang 15/20 (180kg besi + bekisting) 4 dia.12 8-15
- Kayu papan terentang
- Paku Biasa 2" - 5"
M3
Kg
0.4000
4.0000
2,950,000.00
24,000.00
- Besi Beton
Kg
180.0000
16,500.00
- Kawat Beton
- Semen Portland
Kg
Kg
1.8000
323.0000
30,500.00
1,488.00
- Pasir Beton
- Koral Beton 2/3
- Kayu Balok Terentang
M3
M3
M3
0.5200
0.7800
0.1500
255,400.00
218,268.00
2,705,000.00
Lbr
Btg
3.5000
20.0000
166,500.00
30,800.00
Oh
Oh
Oh
Oh
Oh
Oh
7.3000
0.3500
3.3000
2.1000
0.5700
0.2500
66,750.00
100,100.00
100,100.00
100,100.00
106,700.00
120,100.00
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang Praktis 12/12 (175 kg besi + bekisting)
- Kayu papan terentang
M3
0.4000
2,950,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
24,000.00
- Besi Beton
Kg
175.0000
16,500.00
- Kawat Beton
Kg
1.8000
30,500.00
- Semen Portland
Kg
323.0000
1,488.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
218,268.00
- Dolken -8-10/4m
Btg
20.0000
30,800.00
- Pekerja
Oh
7.3000
66,750.00
- Tukang Batu
Oh
0.3500
100,100.00
- Tukang Kayu
Oh
3.3000
100,100.00
- Tukang Besi
Oh
2.1000
100,100.00
- Kepala Tukang
Oh
0.5700
106,700.00
- Mandor
Oh
0.2500
120,100.00
Jumlah
Dibulatkan
15
M3
0.4000
2,950,000.00
Kg
Kg
Kg
4.0000
234.0000
1.8000
24,000.00
16,500.00
30,500.00
- Semen Portland
- Pasir Beton
Kg
M3
323.0000
0.5200
1,488.00
255,400.00
M3
Btg
0.7800
20.0000
218,268.00
30,800.00
- Pekerja
Oh
7.3000
66,750.00
- Tukang Batu
- Tukang Kayu
Oh
Oh
0.3500
3.3000
100,100.00
100,100.00
- Tukang Besi
- Kepala Tukang
Oh
Oh
2.1000
0.5700
100,100.00
106,700.00
- Mandor
Oh
0.2500
120,100.00
Jumlah
16
17
18
Dibulatkan
1 M3 Plat Beton Tulang T= 8 cm (77,5 kg besi + bekisting)
- Beton tulang ad. 1Pc : 2Ps : 3Kr
M3
1.0000
1,048,404.74
M2
10.0000
480,049.70
Kg
50.0000
19,061.17
Dibulatkan
1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 5ps
- Bata Merah
Bh
70.0000
750.00
- Semen Portland
- Pasir Pasang
Kg
M3
9.6800
0.0450
1,488.00
233,400.00
Oh
Oh
Oh
Oh
0.3200
0.1000
0.0100
0.0150
66,750.00
100,100.00
106,700.00
120,100.00
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 M2 Dinding Keramik Corak 20 x 25 cm Setara Mulia
- Keramik corak 20 x 25 cm
m2
1.0000
- Semen abu-abu
Kg
8.0000
- Pasir pasang
M3
0.0180
- Semen warna
Kg
0.0130
- Pekerja
Oh
0.1875
- Tukang batu
Oh
0.3750
- Kepala tukang
Oh
0.0450
- Mandor
Oh
0.0188
Jumlah
Dibulatkan
65,000.00
1,488.00
233,400.00
15,000.00
66,750.00
100,100.00
106,700.00
120,100.00
19
m2
1.0000
57,000.00
- Semen portland
- Pasir pasang
- Semen warna
Kg
M3
Kg
8.0000
0.0215
0.0130
1,488.00
233,400.00
15,000.00
- Pekerja
- Tukang batu
Oh
Oh
0.2500
0.1200
66,750.00
100,100.00
- Kepala tukang
- Mandor
Oh
Oh
0.0120
0.0125
106,700.00
120,100.00
Jumlah
20
21
Dibulatkan
1 M2 Plesteran adk. 1pc:5ps tebal 15 mm + Acian
- Semen Portland
- Pasir Pasang
Kg
M3
4.3200
0.0220
1,488.00
233,400.00
- Pekerja
Oh
0.2000
66,750.00
- Tukang Batu
- Kepala Tukang
Oh
Oh
0.1500
0.0150
100,100.00
106,700.00
- Mandor
Jumlah
Oh
0.0100
120,100.00
Dibulatkan
1 M2 Pasang Atap Spandek zinczlume
- Spandek zinczlume
m2
1.0500
93,555.00
- Paku hak
- Pekerja
- Tukang kayu
Kg
Oh
Oh
0.0200
0.1400
0.0700
24,000.00
66,750.00
100,100.00
- Kepala tukang
- Mandor
Oh
Oh
0.0070
0.0070
106,700.00
120,100.00
M'
bh
Oh
Oh
Oh
Oh
1.0500
4.0000
0.1000
0.0700
0.0080
0.0060
172,900.00
850.00
66,750.00
100,100.00
106,700.00
120,100.00
Jumlah
22
23
Dibulatkan
1 M2 Pasang Nok Spandek
- Seng plat 3" x 6" BJLS 30
- Paku skrup 3"
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
1 M2 Langit-langit Gypsum Board, tebal 9 mm + rangka kayu tambal sulam
- Kayu Kaso
Btg
0.3750
51,284.72
- Gypsum board ( 120 x 240 x 9 ) mm
Lbr
0.3640
87,800.00
- Paku gypsum
kg
0.1100
19,500.00
- Cotton plaster
Bh
0.0720
16,500.00
- Compoun
Zak
0.1250
83,000.00
- Pekerja
Oh
0.1000
66,750.00
- Tukang kayu
Oh
0.0500
100,100.00
- Kepala tukang
Oh
0.0050
106,700.00
- Mandor
Oh
0.0050
120,100.00
Jumlah
Dibulatkan
24
Btg
0.3750
51,284.72
Lbr
kg
Bh
0.3640
0.1100
0.0720
74,500.00
38,500.00
16,500.00
- Compoun
- Pekerja
Zak
Oh
0.1250
0.1000
83,000.00
66,750.00
- Tukang kayu
- Kepala tukang
Oh
Oh
0.0500
0.0050
100,100.00
106,700.00
- Mandor
Oh
0.0050
120,100.00
Dibulatkan
1 M2 Langit-langit Kayu 3/4
- Kayu Kaso 4/6
Btg
1.2500
29,322.12
- Kayu 3/4
M'
16.6600
4,300.00
- Paku
- Pekerja
kg
Oh
0.2500
0.1000
24,000.00
66,750.00
- Tukang kayu
- Kepala tukang
Oh
Oh
0.0500
0.0050
100,100.00
106,700.00
- Mandor
Oh
0.0050
120,100.00
Dibulatkan
1 M List Langit-langit Kayu Profil 4cm
- List Kayu profil
M
- Paku
Kg
1.0500
0.0100
10,500.00
24,000.00
- Pekerja
- Tukang kayu
Oh
Oh
0.0500
0.0500
66,750.00
100,100.00
- Kepala tukang
- Mandor
Jumlah
Oh
Oh
0.0050
0.0030
106,700.00
120,100.00
1.0500
0.1500
0.0500
0.0500
0.0050
0.0030
9,000.00
13,800.00
66,750.00
100,100.00
106,700.00
120,100.00
1.2000
6.0000
18.0000
2.0000
0.3000
5,810,000.00
66,750.00
100,100.00
106,700.00
120,100.00
Jumlah
25
Jumlah
26
27
28
Dibulatkan
1 M List Langit-langit Gypsum 10 cm
- List gypsum
M
- Tepung gypsum
Kg
- Pekerja
Oh
- Tukang kayu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1 M3 Kusen Pintu & jendela kayu Borneo Super
- Kayu Borneo Balok Super
M3
- Pekerja
Oh
- Tukang Kayu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
29
M3
0.0600
6,262,000.00
Kg
Oh
Oh
0.1500
0.5000
2.0000
24,000.00
66,750.00
100,100.00
- Kepala Tukang
- Mandor
Oh
Oh
0.2000
0.0250
106,700.00
120,100.00
Jumlah
30
Dibulatkan
1 M2 Pintu Triplek Rangkap, Rangka Kayu Borneo Super
- Kayu Papan Borneo Super
- Paku Biasa " - 1"
M3
Kg
0.0196
0.0300
6,155,500.00
24,000.00
- Lem Kayu
- Triplek 120 x 240 x 0,4 cm
Ltr
Lbr
0.3000
1.0000
26,300.00
68,500.00
- Stereofoam
m2
1.0000
10,000.00
- Pekerja
- Tukang Kayu
Oh
Oh
0.6000
2.0000
66,750.00
100,100.00
- Kepala Tukang
- Mandor
Oh
Oh
0.2000
0.0300
106,700.00
120,100.00
Kg
Ltr
Lbr
0.1000
0.1500
0.3400
24,000.00
26,300.00
145,000.00
- Pekerja
- Tukang Kayu
Oh
Oh
0.3000
0.2500
66,750.00
100,100.00
- Kepala Tukang
- Mandor
Jumlah
Oh
Oh
0.1000
0.0150
106,700.00
120,100.00
Jumlah
31
32
33
Dibulatkan
1 M2 Pintu Pas Teakwood
Dibulatkan
1 M2 Kaso + Reng Genteng Plentong Kayu Borneo Super
- Kayu balok Borneo super
m3
0.0120
- Paku Biasa 2" - 5"
Kg
0.1500
- Pekerja
Oh
0.1000
- Tukang Kayu
Oh
0.1000
- Kepala Tukang
Oh
0.0100
- Mandor
Oh
0.0050
Jumlah
Dibulatkan
1 M' Lisplang uk (3x30)cm, Kayu Kamper Medan
- Kayu Papan Kamper Medan
M3
- Paku Biasa 2" - 5"
Kg
- Pekerja
Oh
- Tukang Kayu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
0.0110
0.0500
0.1100
0.2200
0.0220
0.0050
5,810,000.00
24,000.00
66,750.00
100,100.00
106,700.00
120,100.00
6,405,800.00
24,000.00
66,750.00
100,100.00
106,700.00
120,100.00
34
M3
0.1050
5,810,000.00
Lbr
Kg
Lbr
5.0000
2.0000
2.0000
74,500.00
24,000.00
5,500.00
- Engsel
- Slot
Bh
Bh
4.0000
4.0000
23,100.00
35,000.00
- Pekerja
- Tukang Kayu terampil
Oh
Oh
0.3000
1.3000
66,750.00
100,100.00
Oh
0.1300
106,700.00
- Mandor
Jumlah
Oh
0.0130
120,100.00
Dibulatkan
1 Buah Pasang Kunci Tanam Biasa
- Kunci tanam biasa
- Pekerja
Bh
Oh
1.0000
0.0100
139,500.00
66,750.00
- Tukang kayu
- Kepala tukang
Oh
Oh
0.5000
0.0100
100,100.00
106,700.00
- Mandor
Oh
0.0050
120,100.00
Dibulatkan
1 Buah Pasang Engsel Pintu
- Engsel pintu
- Pekerja
ps
Oh
1.0000
0.0150
23,100.00
66,750.00
- Tukang kayu
- Kepala tukang
Oh
Oh
0.1500
0.0150
100,100.00
106,700.00
- Mandor
Jumlah
Oh
0.0008
120,100.00
M2
Oh
Oh
Oh
Oh
1.1000
0.0150
0.1500
0.0150
0.0008
122,100.00
66,750.00
100,100.00
106,700.00
120,100.00
1.00
6.00
0.01
1.0000
0.5000
0.5000
0.1600
207,500.00
1,488.00
233,400.00
66,750.00
100,100.00
106,700.00
120,100.00
Jumlah
36
37
38
Dibulatkan
1 M2 Pasang Kaca , tebal 5 mm
- Kaca
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
1 Buah Closet jongkok Porselen Standar
Closet jongkok
bh
P.C (50 gk)
Kg
Pasir pasang
m3
Pekerja
org
Tukang batu
org
Kepala Tukang
org
Mandor
org
Jumlah
Dibulatkan
39
750.00
Kg
m3
m3
44.000
0.070
0.070
1,488.00
233,400.00
211,100.00
Besi beton
Pasir beton
m3
m3
1.600
0.060
Pekerja
org
3.2000
66,750.00
Tukang batu
Kepala Tukang
org
org
1.0150
0.0015
100,100.00
106,700.00
Mandor
Jumlah
org
0.0160
120,100.00
16,500.00
255,400.00
Dibulatkan
40
m'
Pekerja
Tukang batu
org
org
0.0360
0.0600
66,750.00
100,100.00
Kepala Tukang
org
0.0060
106,700.00
Mandor
Perlengkapan 35 % harga pipa
org
lot
0.0018
0.3500
120,100.00
12,750.00
1.2000
10,625.00
Jumlah
Dibulatkan
41
42
43
m'
org
1.2000
0.0810
53,750.00
66,750.00
Tukang batu
org
0.1350
100,100.00
Kepala Tukang
Mandor
Perlengkapan 35 % harga pipa
Jumlah
Dibulatkan
1 M' Pipa PVC 4" (AW)
Pipa pvc 4"
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 35 % harga pipa
Jumlah
Dibulatkan
1 M' Pipa PVC 3/4" (AW)
Pipa pvc 3/4"
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 35 % harga pipa
Jumlah
Dibulatkan
org
org
lot
0.0135
0.0041
0.3500
106,700.00
120,100.00
64,500.00
m'
org
org
org
org
lot
1.2000
0.0810
0.1350
0.0135
0.0041
0.3500
90,000.00
66,750.00
100,100.00
106,700.00
120,100.00
108,000.00
m'
org
org
org
org
lot
1.2000
0.0810
0.1350
0.0135
0.0041
0.3500
13,875.00
66,750.00
100,100.00
106,700.00
120,100.00
16,650.00
44
bh
1.0000
45,000.00
Seal tape
Pekerja
Tukang batu
bh
org
org
0.0250
0.0100
0.1000
4,500.00
66,750.00
100,100.00
Kepala Tukang
Mandor
org
org
0.0100
0.0050
106,700.00
120,100.00
Floor drain
Pekerja
bh
org
1.0000
0.0100
73,500.00
66,750.00
Tukang batu
org
0.1000
100,100.00
Kepala Tukang
Mandor
org
org
0.0100
0.0050
106,700.00
120,100.00
Jumlah
45
46
Dibulatkan
1 Buah Floor Drain
Jumlah
Dibulatkan
1 M2 Pengecatan Bidang Kayu Lama Setara Sieve
- Plamir
Kg
0.1500
27,500.00
- Cat dasar
Kg
0.1700
35,000.00
Kg
Oh
0.1700
0.0700
45,900.00
66,750.00
- Tukang cat
- Kepala tukang
- Mandor
Oh
Oh
Oh
0.0750
0.0075
0.0025
100,100.00
106,700.00
120,100.00
0.1500
0.3720
2.0000
0.0600
0.0160
0.0025
55,000.00
125,000.00
5,500.00
100,100.00
106,700.00
120,100.00
Jumlah
47
48
Dibulatkan
1 M2 Pelaburan Bidang Kayu dengan Politur
- Politur
Ltr
- Politur jadi
Ltr
- Ampelas
Lbr
- Tukang cat
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1 M2 Pelaburan Bidang Kayu Lama dengan Politur
- Politur
Ltr
0.1000
- Politur jadi
Ltr
0.1860
- Ampelas
Lbr
1.0000
- Tukang cat
Oh
0.0600
- Kepala tukang
Oh
0.0160
- Mandor
Oh
0.0025
Jumlah
Dibulatkan
55,000.00
125,000.00
5,500.00
100,100.00
106,700.00
120,100.00
49
Kg
0.1200
35,000.00
- Cat penutup 2 x
- Pekerja
- Tukang cat
Kg
Oh
Oh
0.1800
0.0280
0.0420
82,500.00
66,750.00
100,100.00
- Kepala tukang
- Mandor
Oh
Oh
0.0042
0.0025
106,700.00
120,100.00
Jumlah
50
Dibulatkan
1 M2 Pengecatan Plafond ( 2x ) Setara Vinilex
- Cat tembok setara Vinilex
- Plamir tembok
Kg
Kg
0.1300
0.1100
26,000.00
27,500.00
- Rol cat
- Steger werk
Bh
Ls
0.1000
0.6700
35,000.00
1,000.00
- Ampelas
Lbr
0.3300
5,500.00
- Pekerja
- Tukang cat
Oh
Oh
0.1300
0.2000
66,750.00
100,100.00
- Kepala tukang
- Mandor
Oh
Oh
0.0200
0.0100
106,700.00
120,100.00
Jumlah
Dibulatkan
N
HARGA
(Rp)
24,696.00
480.00
15,953.00
6,675.00
10,010.00
1,067.00
600.50
59,481.50
59,482.00
8,010.00
1,080.90
9,090.90
9,091.00
6,675.00
1,080.90
7,755.90
7,756.00
2,670.00
533.50
600.50
3,804.00
3,804.00
26,700.00
4,804.00
31,504.00
31,504.00
12,816.00
2,281.90
15,097.90
15,098.00
217,478.40
20,025.00
1,201.00
238,704.40
238,704.00
233,787.40
202,368.00
126,969.60
100,125.00
60,060.00
6,402.00
9,007.50
738,719.50
738,720.00
433,008.00
120,038.00
202,989.24
133,500.00
35,035.00
3,734.50
120,100.00
1,048,404.74
1,048,405.00
17,325.00
457.50
467.25
700.70
74.69
36.03
19,061.17
19,061.00
118,000.00
9,600.00
11,500.00
40,575.00
58,275.00
184,800.00
20,025.00
33,033.00
3,521.10
720.60
480,049.70
480,050.00
796,500.00
48,000.00
2,970,000.00
91,500.00
480,624.00
132,808.00
170,249.04
323,737.50
35,035.00
156,156.00
140,140.00
35,317.70
20,417.00
5,400,484.24
5,400,484.00
1,180,000.00
96,000.00
2,970,000.00
54,900.00
480,624.00
132,808.00
170,249.04
405,750.00
582,750.00
616,000.00
487,275.00
35,035.00
330,330.00
210,210.00
60,819.00
30,025.00
7,842,775.04
7,842,775.00
1,180,000.00
96,000.00
2,887,500.00
54,900.00
480,624.00
132,808.00
170,249.04
616,000.00
487,275.00
35,035.00
330,330.00
210,210.00
60,819.00
30,025.00
6,771,775.04
6,771,775.00
1,180,000.00
96,000.00
3,861,000.00
54,900.00
480,624.00
132,808.00
170,249.04
616,000.00
487,275.00
35,035.00
330,330.00
210,210.00
60,819.00
30,025.00
7,745,275.04
7,745,275.00
1,048,404.74
4,800,497.00
953,058.50
6,801,960.24
6,801,960.00
52,500.00
14,403.84
10,503.00
21,360.00
10,010.00
1,067.00
1,801.50
111,645.34
111,645.00
65,000.00
11,904.00
4,201.20
195.00
12,515.63
37,537.50
4,801.50
2,257.88
138,412.71
138,413.00
57,000.00
11,904.00
5,018.10
195.00
16,687.50
12,012.00
1,280.40
1,501.25
105,598.25
105,598.00
6,428.16
5,134.80
13,350.00
15,015.00
1,600.50
1,201.00
42,729.46
42,729.00
98,232.75
480.00
9,345.00
7,007.00
746.90
840.70
116,652.35
116,652.00
181,545.00
3,400.00
6,675.00
7,007.00
853.60
720.60
200,201.20
200,201.00
19,231.77
31,959.20
2,145.00
1,188.00
10,375.00
6,675.00
5,005.00
533.50
600.50
77,712.97
77,713.00
19,231.77
27,118.00
4,235.00
1,188.00
10,375.00
6,675.00
5,005.00
533.50
600.50
74,961.77
74,962.00
36,652.64
71,638.00
6,000.00
6,675.00
5,005.00
533.50
600.50
127,104.64
127,105.00
11,025.00
240.00
3,337.50
5,005.00
533.50
360.30
20,501.30
20,501.00
9,450.00
2,070.00
3,337.50
5,005.00
533.50
360.30
20,756.30
20,756.00
6,972,000.00
400,500.00
1,801,800.00
213,400.00
36,030.00
9,423,730.00
9,423,730.00
375,720.00
3,600.00
33,375.00
200,200.00
21,340.00
3,002.50
637,237.50
637,238.00
120,647.80
720.00
7,890.00
68,500.00
10,000.00
40,050.00
200,200.00
21,340.00
3,603.00
472,950.80
472,951.00
2,400.00
3,945.00
49,300.00
20,025.00
25,025.00
10,670.00
1,801.50
113,166.50
113,167.00
69,720.00
3,600.00
6,675.00
10,010.00
1,067.00
600.50
91,672.50
91,673.00
70,463.80
1,200.00
7,342.50
22,022.00
2,347.40
600.50
103,976.20
103,976.00
610,050.00
372,500.00
48,000.00
11,000.00
92,400.00
140,000.00
20,025.00
130,130.00
13,871.00
1,561.30
1,439,537.30
199,935.74
199,936.00
139,500.00
667.50
50,050.00
1,067.00
600.50
191,885.00
191,885.00
23,100.00
1,001.25
15,015.00
1,600.50
96.08
40,812.83
40,813.00
134,310.00
1,001.25
15,015.00
1,600.50
96.08
152,022.83
152,023.00
207,500.00
8,928.00
2,334.00
66,750.00
50,050.00
53,350.00
19,216.00
408,128.00
408,128.00
39,750.00
65,472.00
16,338.00
14,777.00
26,400.00
15,324.00
213,600.00
101,601.50
160.05
1,921.60
495,344.15
495,344.00
12,750.00
2,403.00
6,006.00
640.20
216.18
4,462.50
26,477.88
26,478.00
64,500.00
5,406.75
13,513.50
1,440.45
492.41
22,575.00
107,928.11
107,928.00
108,000.00
5,406.75
13,513.50
1,440.45
492.41
37,800.00
166,653.11
166,653.00
16,650.00
5,406.75
13,513.50
1,440.45
492.41
5,827.50
43,330.61
43,331.00
45,000.00
112.50
667.50
10,010.00
1,067.00
600.50
57,457.50
57,458.00
73,500.00
667.50
10,010.00
1,067.00
600.50
85,845.00
85,845.00
4,125.00
5,950.00
7,803.00
4,672.50
7,507.50
800.25
300.25
31,158.50
31,159.00
8,250.00
46,500.00
11,000.00
6,006.00
1,707.20
300.25
73,763.45
73,763.00
5,500.00
23,250.00
5,500.00
6,006.00
1,707.20
300.25
42,263.45
42,263.00
4,200.00
14,850.00
1,869.00
4,204.20
448.14
300.25
25,871.59
25,872.00
3,380.00
3,025.00
3,500.00
670.00
1,815.00
8,677.50
20,020.00
2,134.00
1,201.00
44,422.50
44,423.00
URAIAN PEKERJAAN
1 1 M2 Pengukuran Dan Pasang Bouwplank
2 1 M2 Bongkaran Dinding Tembok Bata Merah
3 Bongkaran Lantai
4 1 M2 Bongkaran Langit-langit (Plapond)
5 1 M3 Galian Tanah Biasa sedalam 1 m
6 1 M3 Urugan Kembali
7 1 M3 Urugaan Pasir
8 1 M3 Pasang Pondasi Batu kali adk 1pc : 5ps
9 1 M3 Sloof Beton Tulang 15/20 (180 kg besi + bekisting) 4 dia. 12 ring 8-15
10 1 M3 Kolom Beton Tulang 15/20 (180kg besi + bekisting) 4 dia.12 8-15
11 1 M3 Kolom Beton Tulang Praktis 12/12 (175 kg besi + bekisting)
12 1 M3 Balok Beton Lintel 11/15 (234 kg besi + bekisting) 4dia.10 8-15
13 1 M3 Plat Beton Tulang T= 8 cm (77,5 kg besi + bekisting)
14 1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 5ps
15 1 M2 Dinding Keramik Corak 20 x 25 cm Setara Mulia
24 1 M2 Lantai Keramik corak 40 x 40 cm Setara Mulia
16 1 M2 Plesteran adk. 1pc:5ps tebal 15 mm + Acian
17 1 M2 Pasang Atap Spandek zinczlume
18 1 M2 Pasang Nok Spandek
19 1 M2 Langit-langit Gypsum Board, tebal 9 mm + rangka kayu tambal sulam
20 1 M2 Langit-langit GRC t = 4 mm + rangka kayu tambal sulam
21 1 M List Langit-langit Kayu Profil 4cm
22 1 M List Langit-langit Gypsum 10 cm
23 1 M2 Langit-langit Kayu 3/4
25 1 M3 Kusen Pintu & jendela kayu Borneo Super
26 1 M2 Jalusi Mati Kusen Kayu kamper Medan
27 1 M2 Pintu Triplek Rangkap, Rangka Kayu Borneo Super
28 1 M2 Pintu Pas Teakwood
29 1 M2 Kaso + Reng Genteng Plentong Kayu Borneo Super
30 1 M' Lisplang uk (3x30)cm, Kayu Kamper Medan
31 1 M2 Pekerjaan partisi doble GRC Rangka Kayu
32 1 Buah Pasang Kunci Tanam Biasa
33 1 Buah Pasang Engsel Pintu
34 1 M2 Pasang Kaca , tebal 5 mm
35 1 Buah Closet jongkok Porselen Standar
36 1 Buah Bak Kontrol Pas Bata Merah Uk (30 x 30) cm
37 1 M' Pipa PVC 1/2" (AW)
38 1 M' Pipa PVC 3" (AW)
39 1 M' Pipa PVC 4" (AW)
40 1 M' Pipa PVC 3/4" (AW)
41 1 Buah Kran 1/2" - 3/4"
42 1 Buah Floor Drain
43 1 M2 Pengecatan Bidang Kayu Lama Setara Sieve
44 1 M2 Pelaburan Bidang Kayu dengan Politur
45 1 M2 Pelaburan Bidang Kayu Lama dengan Politur
46 1 M2 Pengecatan Tembok Lama Setara ICI
47 1 M2 Pengecatan Plafond ( 2x ) Setara Vinilex
HARGA
(Rp)
59,482.00
9,091.00
7,756.00
3,804.00
31,504.00
15,098.00
238,704.00
738,720.00
5,400,484.00
7,842,775.00
6,771,775.00
7,745,275.00
6,801,960.00
111,645.00
138,413.00
105,598.00
42,729.00
116,652.00
200,201.00
77,713.00
74,962.00
20,501.00
20,756.00
127,105.00
9,423,730.00
637,238.00
472,951.00
113,167.00
91,673.00
103,976.00
199,936.00
191,885.00
40,813.00
152,023.00
408,128.00
495,344.00
26,478.00
107,928.00
166,653.00
43,331.00
57,458.00
85,845.00
31,159.00
73,763.00
42,263.00
25,872.00
44,423.00
REKAPITULASI
RENCANA ANGGARAN BIAYA ( RAB )
Kegiatan
Pekerjaan
Lokasi
Tahun Anggaran
NO
II
JUMLAH
DIBULATKAN
TERBILANG : ENAM RATUS SEMBILAN PULUH SEMBILAN JUTA TIGA RATUS EMPAT RIBU RUPIAH.-
Bogor. .2013
Konsultan Perencana
CV. FADEL PUTRA
YEYEN SURYANA. ST
Direktur
RIBU RUPIAH.-
JUMLAH
349,007,000.00
349,973,000.00
698,980,000.00
698,980,000.00
Pekerjaan
Lokasi
Tahun Anggaran
: 2013
NO
URAIAN PEKERJAAN
VOL
SAT
216.87
128.60
m
m'
3
4
Bongkaran Plapond
Air Kerja
332.24
1.00
m
ls
5
6
Listrik Kerja
Pembersihan setelah Pekerjaan selesai
1.00
1.00
ls
ls
II
1
PEKERJAAN PASANGAN
Pas. Lantai Keramik 40/40 set Corak Mulia
216.87
2
3
128.60
1.00
m
ls
Sub Jumlah
Sub Jumlah
III
1
2
92.25
3.00
m
m
3
4
3.00
143.10
m'
m
5
6
189.14
5.00
m
m
7
8
9
10.00
1.00
106.00
m'
ls
m'
10
191.00
m'
IV
1
37.80
2
3
11.00
24.00
bh
ps
V
1
2
Sub Jumlah
Sub Jumlah
32.00
20.00
26.00
bh
Lampu SL 18 watt
6.00
bh
Saklar double
8.00
bh
Stop kontak
20.00
bh
ttk
ttk
Sub Jumlah
VI
1
PEKERJAAN PENGECATAN/FINISHING
Pengecatan Kusen Kayu Lama set Glotex, ICI, Seave
161.90
Pengecatan Listplank, Plapond Kayu, Konsol Lama set Glotex. ICI, Seave
123.24
720.80
332.24
Pek. Politur
48.82
m
Sub Jumlah
Bongkaran Tegel
344.10
2
3
169.60
401.40
m'
m
II
1
PEKERJAAN PASANGAN
Pas. Plin Keramik 10/40 Corak
169.60
m'
344.10
10.80
10.80
1.00
ls
Sub Jumlah
Sub Jumlah
III
1
25.00
20.00
m
m'
252.72
148.68
5.00
10.00
m'
8
9
1.00
ls
132.20
m'
144.00
m'
Sub Jumlah
IV
1
2
43.68
13.00
m
m
27.00
ps
42.00
20.00
ttk
35.00
bh
Lampu SL 18 watt
7.00
bh
Saklar double
8.00
bh
Saklar engkel
4.00
bh
Stop kontak
20.00
bh
Sub Jumlah
ttk
Sub Jumlah
VI
1
PEKERJAAN PENGECATAN/FINISHING
Pengecatan Kusen Kayu Lama set Glotex, ICI, Seave
184.39
Pengecatan Listplank, Plapond Kayu, Konsol Lama set Glotex. ICI, Seave
118.44
859.62
401.40
Pek. Politur
46.96
38.29
m
Sub Jumlah
REKAPITULASI
RENCANA ANGGARAN BIAYA ( RAB )
Kegiatan
Pekerjaan
Lokasi
Tahun Anggaran
: 2013
NO
URAIAN PEKERJAAN
II
PEKERJAAN PASANGAN
III
IV
VI
PEKERJAAN PENGECATAN/FINISHING
II
PEKERJAAN PASANGAN
III
IV
VI
PEKERJAAN PENGECATAN/FINISHING
JUMLAH
DIBULATKAN
TERBILANG : TIGA RATUS SEMBILAN PULUH JUTA ENAM RATUS EMPAT RIBU RUPIAH.-
Bogor. .2013
Konsultan Perencana
CV. FADEL PUTRA
YEYEN SURYANA. ST
Direktur
HARGA
JUMLAH
SATUAN (Rp.)
HARGA (Rp.)
7,756.00
4,418.00
1,682,043.72
568,154.80
3,804.00
800,000.00
1,263,840.96
800,000.00
750,000.00
334,000.00
750,000.00
334,000.00
Sub Jumlah
5,398,039.48
105,598.00
22,901,038.26
23,599.00
2,500,000.00
3,034,831.40
2,500,000.00
Sub Jumlah
28,435,869.66
116,652.00
200,201.00
10,761,147.00
600,603.00
207,601.00
77,713.00
622,803.00
11,120,730.30
74,962.00
127,105.00
14,178,312.68
635,525.00
103,976.00
750,000.00
20,756.00
1,039,760.00
750,000.00
2,200,136.00
20,501.00
Sub Jumlah
113,167.00
4,277,712.60
191,885.00
40,813.00
2,110,735.00
979,512.00
Sub Jumlah
7,367,959.60
179,600.00
179,600.00
360,000.00
5,747,200.00
3,592,000.00
9,360,000.00
50,000.00
300,000.00
29,000.00
232,000.00
26,500.00
Sub Jumlah
530,000.00
19,761,200.00
31,159.00
5,044,642.10
31,159.00
3,840,035.16
25,872.00
18,648,537.60
61,782.00
20,526,451.68
73,763.00
Sub Jumlah
3,601,109.66
51,660,776.20
7,756.00
2,668,839.60
4,418.00
3,804.00
749,292.80
1,526,925.60
Sub Jumlah
Sub Jumlah
3,915,691.00
45,824,707.98
4,945,058.00
23,599.00
4,002,390.40
111,098.00
38,228,821.80
108,598.00
1,172,858.40
61,016.00
658,972.80
2,500,000.00
2,500,000.00
46,563,043.40
91,673.00
4,152,020.00
77,713.00
19,639,629.36
74,962.00
11,145,350.16
127,105.00
635,525.00
103,976.00
1,039,760.00
750,000.00
750,000.00
20,756.00
2,743,943.20
20,501.00
Sub Jumlah
2,952,144.00
45,350,196.72
113,167.00
191,885.00
4,943,134.56
2,494,505.00
40,813.00
1,101,951.00
Sub Jumlah
7,437,639.56
179,600.00
7,543,200.00
179,600.00
3,592,000.00
360,000.00
12,600,000.00
50,000.00
350,000.00
29,000.00
232,000.00
26,500.00
106,000.00
26,500.00
Sub Jumlah
530,000.00
24,953,200.00
31,159.00
5,745,408.01
31,159.00
3,690,471.96
25,872.00
22,240,088.64
61,782.00
24,799,294.80
73,763.00
3,463,910.48
61,016.00
Sub Jumlah
2,291,825.00
207,601.00
2,336,302.64
62,275,476.53
JUMLAH
5,398,039.48
28,435,869.66
45,824,707.98
7,367,959.60
19,761,200.00
51,660,776.20
4,945,058.00
46,563,043.40
45,350,196.72
7,437,639.56
24,953,200.00
62,275,476.53
349,973,167.13
349,973,000.00
Bogor. .2013
Konsultan Perencana
CV. FADEL PUTRA
YEYEN SURYANA. ST
Direktur
Pekerjaan
Lokasi
Tahun Anggaran
: 2013
NO
URAIAN PEKERJAAN
VOL
SAT
HARGA
SATUAN (Rp.)
305.67
122.80
16.20
338.40
1.00
1.00
1.00
m
m'
m
m
ls
ls
ls
Sub Jumlah
7,756.00
4,418.00
9,091.00
3,804.00
800,000.00
750,000.00
334,000.00
II
1
2
3
PEKERJAAN PASANGAN
Pas. Lantai Keramik 40/40 set Corak Set. Roman
Pas. Plin Keramik 10/40 Corak
Perbaikan Saluran Air Hujan
305.67
122.80
1.00
m
m'
ls
Sub Jumlah
111,098.00
23,599.00
1,500,000.00
III
1
2
3
4
5
6
7
8
9
41.55
1.50
1.50
152.64
185.76
5.00
10.00
1.00
119.80
m
m'
m'
m
m
m
m'
ls
m'
116,652.00
200,201.00
207,601.00
77,713.00
74,962.00
127,105.00
103,976.00
750,000.00
20,756.00
10
176.40
m'
20,501.00
Sub Jumlah
IV
1
2
3
1
2
40.36
11.00
24.00
m
m
ps
Sub Jumlah
113,167.00
191,885.00
40,813.00
33.00
ttk
179,600.00
20.00
ttk
179,600.00
35.00
bh
360,000.00
Lampu SL 18 watt
7.00
bh
50,000.00
Saklar double
8.00
bh
29,000.00
Stop kontak
20.00
bh
26,500.00
Sub Jumlah
VI
1
PEKERJAAN PENGECATAN/FINISHING
Pengecatan Kusen Kayu Lama set Glotex, ICI, Seave
167.29
31,159.00
Pengecatan Listplank, Plapond Kayu, Konsol Lama set Glotex. ICI, Seave
135.04
31,159.00
722.26
25,872.00
338.40
61,782.00
Pek. Politur
47.02
73,763.00
Sub Jumlah
I
1
2
3
307.38
141.10
432.40
m
m'
m
Sub Jumlah
7,756.00
4,418.00
3,804.00
II
1
2
3
4
PEKERJAAN PASANGAN
Pas. Lantai Keramik 40/40 Corak set Mulia
Pas. Plin Keramik 10/40 Corak
Pas. Lantai Keramik 20/20 Corak set Mulia
Pas. Pengecetan Water Propving
296.58
141.10
10.80
10.80
m
m'
m
m
Sub Jumlah
105,598.00
23,599.00
108,598.00
61,016.00
III
1
2
1
2
3
4
5
6
7
10.00
91,673.00
20.00
m'
207,601.00
220.32
212.08
5.00
10.00
106.60
1.00
154.00
m
m
m
m'
m'
ls
m'
Sub Jumlah
77,713.00
74,962.00
127,105.00
103,976.00
20,756.00
750,000.00
20,501.00
0.11
1.40
40.32
12.00
24.00
m
m
m
m
ps
Sub Jumlah
9,423,730.00
548,018.00
113,167.00
191,885.00
40,813.00
IV
1
2
3
4
5
32.00
ttk
179,600.00
20.00
ttk
179,600.00
35.00
bh
360,000.00
Lampu SL 18 watt
9.00
bh
50,000.00
Saklar double
5.00
bh
29,000.00
Saklar engkel
5.00
bh
26,500.00
Stop kontak
20.00
bh
26,500.00
Sub Jumlah
VI
1
PEKERJAAN PENGECATAN/FINISHING
Pengecatan Kusen Kayu Lama set Glotex, ICI, Seave
185.76
31,159.00
Pengecatan Listplank, Plapond Kayu, Konsol Lama set Glotex. ICI, Seave
127.24
31,159.00
740.00
25,872.00
432.40
61,782.00
Pek. Politur
46.70
73,763.00
38.60
61,016.00
Sub Jumlah
REKAPITULASI
Pekerjaan
Lokasi
Tahun Anggaran
: 2013
NO
URAIAN PEKERJAAN
II
PEKERJAAN PASANGAN
III
IV
VI
PEKERJAAN PENGECATAN/FINISHING
II
PEKERJAAN PASANGAN
III
IV
VI
PEKERJAAN PENGECATAN/FINISHING
JUMLAH
DIBULATKAN
TERBILANG : TIGA RATUS EMPAT PULUH SATU JUTA SEMBILAN RATUS SEMBILAN PULUH DELAPAN RIBU RUPIAH.-
Bogor. .2013
Konsultan Perencana
CV. FADEL PUTRA
YEYEN SURYANA. ST
Direktur
JUMLAH
HARGA (Rp.)
2,370,776.52
542,530.40
147,274.20
1,287,273.60
800,000.00
750,000.00
334,000.00
6,231,854.72
33,959,325.66
2,897,957.20
1,500,000.00
38,357,282.86
4,846,890.60
300,301.50
311,401.50
11,862,112.32
13,924,941.12
635,525.00
1,039,760.00
750,000.00
2,486,568.80
3,616,376.40
39,773,877.24
4,567,420.12
2,110,735.00
979,512.00
7,657,667.12
5,926,800.00
3,592,000.00
12,600,000.00
350,000.00
232,000.00
530,000.00
23,230,800.00
5,212,589.11
4,207,711.36
18,686,310.72
20,907,028.80
3,468,336.26
52,481,976.25
2,384,039.28
623,379.80
1,644,849.60
4,652,268.68
31,318,254.84
3,329,818.90
1,172,858.40
658,972.80
36,479,904.94
916,730.00
4,152,020.00
17,121,728.16
15,897,940.96
635,525.00
1,039,760.00
2,212,589.60
750,000.00
3,157,154.00
45,883,447.72
1,036,610.30
767,225.20
4,562,893.44
2,302,620.00
979,512.00
9,648,860.94
5,747,200.00
3,592,000.00
12,600,000.00
450,000.00
145,000.00
132,500.00
530,000.00
23,196,700.00
5,788,095.84
3,964,671.16
19,145,280.00
26,714,536.80
3,444,732.10
2,355,217.60
61,412,533.50
JUMLAH
6,231,854.72
38,357,282.86
39,773,877.24
7,657,667.12
23,230,800.00
52,481,976.25
4,652,268.68
36,479,904.94
45,883,447.72
9,648,860.94
23,196,700.00
61,412,533.50
349,007,173.97
349,007,000.00
REKAPITULASI
RENCANA ANGGARAN BIAYA ( RAB )
Kegiatan
Pekerjaan
Lokasi
Tahun Anggaran
NO
:
:
:
:
URAIAN PEKERJAAN
II
III
JUMLAH
DIBULATKAN
TERBILANG : LIMA RATUS LIMA PULUH DELAPAN JUTA DUA RATUS DUA PULUH ENAM RIBU RUPIAH
Bogor,
Mei 2013
Konsultan Perencana
PT.TUNGGUL KAWUNG
WAHYU JUNIANTO. ST
Direktur
idikan Praktik/Bromo)
6 Jawa Barat
JUMLAH
PRKATEK / BROMO G)
227,442,000.00
PRKATEK / BROMO H)
287,777,000.00
PRKATEK / BROMO I)
43,007,000.00
558,226,000.00
1,438.56
558,226,000.00
388,044.99
Bogor,
Mei 2013
Konsultan Perencana
PT.TUNGGUL KAWUNG
WAHYU JUNIANTO. ST
Direktur
ARITMATIKA PT/CV.
Kegiatan
Pekerjaan
Lokasi
Tahun Anggaran
NO
:
:
:
:
I
1
2
3
4
5
6
Bongkaran Lantai
Bongkaran dinding
Bongkaran Plafond
Bongkaran Closed jongkok
Pembersihan setelah Pekerjaan selesai
II
1
2
3
PEKERJAAN PASANGAN
Pas. Bata merah
1:5
Pas. Plesteran 1 : 5 + Acian
Pas. Lantai Keramik 40/40 Corak set. Mulia
4
5
6
7
III
1
2
3
4
5
6
7
VOL
SAT
1.00
Ls
485.64
43.40
502.05
1.00
1.00
m
m
m
m
ls
Sub Jumlah
6.36
12.72
485.64
2.10
3.19
1.00
0.18
m
m
m
m
m
unit
m
Sub Jumlah
0.30
10.00
40.00
m
m
m
10.00
408.72
93.33
10.00
m'
m
m
m'
8
9
10
219.00
1.00
253.25
m'
ls
m'
Sub Jumlah
IV
1
2
3
4
V
1
ls
38.40
24.00
14.00
m
ps
m
Sub Jumlah
20.00
20.00
m'
m'
8.00
6.00
m'
m'
5.00
bh
bh
bh
1.00
Pek. Sanitair
- Pas. Kran Tembok
- Pas. Kran Angsa
- Pas. Bak Mandi Fiberglass
- Pas. Closet Jongkok
- Pas. Floor Drain (Stenlist)
- Perbaikan Bak kamar mandi bocor
Pas. Washbak Zink
1.00
1.00
1.00
5.00
4.00
1.00
bh
bh
bh
unit
Sub Jumlah
VI
1
2
3
4
5
6
7
25.00
ttk
11.00
14.00
11.00
4.00
9.00
ttk
Stop kontak
11.00
bh
bh
bh
bh
bh
Sub Jumlah
VII
1
2
3
4
5
PEKERJAAN PENGECATAN/FINISHING
Pengecatan Kusen Kayu Lama set Glotex
Pengecatan Listplank, Konsol dan Plafond Kayu Lama set Glotex
276.49
301.68
m
m
998.75
688.72
56.28
m
m
m
Sub Jumlah
REKAPITULASI
RENCANA ANGGARAN BIAYA ( RAB )
Kegiatan
Pekerjaan
Lokasi
Tahun Anggaran
: 2013
NO
URAIAN PEKERJAAN
II
PEKERJAAN PASANGAN
III
IV
VI
VII
PEKERJAAN PENGECATAN/FINISHING
JUMLAH
DIBULATKAN
Pekerjaan
Lokasi
Tahun Anggaran
: 2013
NO
URAIAN PEKERJAAN
SAT
VOL
Bongkaran dinding
Bongkaran plafond
Pek. Bouwplank
II
9.21 m
4.11 m
m
m'
505.98 m
4.00 m
1.00 ls
82.68
636.70
Sub Jumlah
0.57 m
Sub Jumlah
III
PEKERJAAN PASANGAN
1:5
4.53 m
1:5
29.44 m
58.88 m
505.98 m
Sub Jumlah
IV
PEKERJAAN BETON
0.43 m
0.23 m
0.43 m
0.18 m
Sub Jumlah
Pek.Rangka Atap
15.00 m
40.00 m
0.28 m
415.26 m
221.44 m
10
11
VI
10.00 m'
10.00 m'
17.28 m
166.26 m'
1.00 ls
123.20 m'
Sub Jumlah
0.44 m
1.26 m
14.40 m
1.00 ls
5 Pas. Tekwood
24.00 m
26.25 m
1.00 ls
5.00 unit
15.00 ps
6.30 m
Sub Jumlah
VII
73.00 ttk
30.00 ttk
34.00 bh
28.00 bh
11.00 bh
6 Saklar double
13.00 bh
7 Saklar engkel
2.00 bh
8 Stop kontak
16.00 bh
9 Stop kontak AC
10.00 bh
2.00 bh
2.00 bh
Sub Jumlah
VIII
PEKERJAAN PENGECATAN/FINISHING
1 Pengecatan Kusen Kayu Lama set Glotex
277.06 m
298.80 m
778.20 m
636.70 m
5 Pek. Politur
80.50 m
Sub Jumlah
kan Praktik/Bromo G)
HARGA
SATUAN (Rp.)
1,000,000.00
1,000,000.00
7,756.00
9,091.00
3,804.00
73,000.00
385,000.00
3,766,623.84
394,549.40
1,909,810.88
73,000.00
385,000.00
Sub Jumlah
7,528,984.12
111,645.00
42,729.00
105,598.00
710,062.20
543,512.88
51,282,612.72
138,413.00
138,413.00
495,344.00
6,801,960.00
290,667.30
441,537.47
495,344.00
1,224,352.80
54,988,089.37
5,810,000.00
91,673.00
116,652.00
1,743,000.00
916,730.00
4,666,080.00
200,201.00
77,713.00
74,962.00
103,976.00
2,002,010.00
31,762,857.36
6,996,453.33
1,039,760.00
20,756.00
750,000.00
20,501.00
4,545,564.00
750,000.00
5,191,878.25
59,614,332.94
500,000.00
500,000.00
113,167.00
40,813.00
191,885.00
4,345,612.80
979,512.00
2,686,390.00
8,511,514.80
26,478.00
43,331.00
529,560.00
866,620.00
107,928.00
166,653.00
863,424.00
999,918.00
57,458.00
287,290.00
57,500.00
281,000.00
408,128.00
85,845.00
100,000.00
57,500.00
281,000.00
408,128.00
429,225.00
400,000.00
374,000.00
374,000.00
5,496,665.00
Sub Jumlah
Sub Jumlah
Sub Jumlah
Sub Jumlah
JUMLAH
HARGA (Rp.)
179,600.00
179,600.00
360,000.00
50,000.00
29,000.00
26,500.00
26,500.00
Sub Jumlah
Sub Jumlah
4,490,000.00
1,975,600.00
5,040,000.00
550,000.00
116,000.00
238,500.00
291,500.00
12,701,600.00
31,159.00
31,159.00
8,615,151.91
9,400,047.12
25,872.00
44,423.00
73,763.00
25,839,660.00
30,595,008.56
4,151,381.64
78,601,249.23
kan Praktik/Bromo G)
JUMLAH
7,528,984.12
54,988,089.37
59,614,332.94
8,511,514.80
5,496,665.00
12,701,600.00
78,601,249.23
227,442,435.46
227,442,000.00
HARGA
JUMLAH
SATUAN (Rp.)
HARGA (Rp.)
9,091.00
751,643.88
3,804.00
2,422,006.80
7,756.00
3,924,380.88
59,482.00
237,928.00
386,000.00
386,000.00
7,721,959.56
31,504.00
290,151.84
15,098.00
62,052.78
238,704.00
136,061.28
488,265.90
738,720.00
3,346,401.60
111,645.00
3,286,828.80
42,729.00
2,515,883.52
105,598.00
53,430,476.04
62,579,589.96
5,400,484.00
2,322,208.12
6,771,775.00
1,557,508.25
7,842,775.00
3,372,393.25
7,745,275.00
1,394,149.50
8,646,259.12
5,810,000.00
1,626,800.00
91,673.00
1,375,095.00
116,652.00
4,666,080.00
200,201.00
2,002,010.00
77,713.00
32,271,100.38
74,962.00
16,599,585.28
103,976.00
1,039,760.00
127,105.00
2,196,374.40
20,756.00
3,450,892.56
750,000.00
750,000.00
20,501.00
2,525,723.20
68,503,420.82
9,423,730.00
4,146,441.20
637,238.00
802,919.88
199,936.00
2,879,078.40
1,000,000.00
1,000,000.00
113,167.00
2,716,008.00
472,951.00
12,414,963.75
3,000,000.00
3,000,000.00
191,885.00
959,425.00
40,813.00
612,195.00
152,023.00
957,744.90
29,488,776.13
179,600.00
13,110,800.00
179,600.00
5,388,000.00
360,000.00
12,240,000.00
115,000.00
3,220,000.00
98,000.00
1,078,000.00
29,000.00
377,000.00
26,500.00
53,000.00
26,500.00
424,000.00
56,000.00
560,000.00
450,000.00
900,000.00
350,000.00
700,000.00
38,050,800.00
31,159.00
8,632,912.54
31,159.00
9,310,309.20
25,872.00
20,133,590.40
44,423.00
28,284,124.10
73,763.00
5,937,921.50
72,298,857.74
:
:
:
:
NO
URAIAN PEKERJAAN
1
2
3
Bongkaran dinding
Bongkaran plafond
Pas. Bongkaran lantai
4
5
Pek. Bouwplank
Pembersihan setelah Pekerjaan selesai
VOL
SAT
82.68
636.70
505.98
m
m'
m
4.00
1.00
m
ls
Sub Jumlah
II
1
2
9.21
4.11
m
m
0.57
m
Sub Jumlah
III
1
PEKERJAAN PASANGAN
Pas. Pondasi batu belah 1 : 5
4.53
2
3
4
29.44
58.88
505.98
m
m
m
IV
PEKERJAAN BETON
1
2
0.43
0.23
m
m
3
4
0.43
0.18
m
m
1
2
3
4
5
Sub Jumlah
Sub Jumlah
0.28
15.00
40.00
m
m
m
10.00
415.26
m'
m
6
7
221.44
10.00
m
m'
8
9
17.28
166.26
m
m'
10
11
1.00
123.20
ls
m'
VI
1
2
3
0.44
1.26
14.40
m
m
m
4
5
1.00
24.00
ls
m
6
7
26.25
1.00
m
ls
8
9
5.00
15.00
unit
ps
Sub Jumlah
10
Pas. Kaca 5 mm
6.30
m
Sub Jumlah
VII
1
73.00
ttk
2
3
30.00
34.00
ttk
4
5
28.00
11.00
bh
6
7
Saklar double
Saklar engkel
13.00
2.00
bh
8
9
Stop kontak
Stop kontak AC
16.00
10.00
bh
2.00
2.00
bh
10
11
bh
bh
bh
bh
bh
Sub Jumlah
VIII
1
PEKERJAAN PENGECATAN/FINISHING
Pengecatan Kusen Kayu Lama set Glotex
277.06
2
3
298.80
778.20
m
m
4
5
636.70
80.50
m
m
Sub Jumlah
REKAPITULASI
RENCANA ANGGARAN BIAYA ( RAB )
Kegiatan
Pekerjaan
Lokasi
Tahun Anggaran
:
:
:
:
NO
URAIAN PEKERJAAN
II
III
PEKERJAAN PASANGAN
IV
PEKERJAAN BETON
VI
VII
VIII
PEKERJAAN PENGECATAN/FINISHING
JUMLAH
DIBULATKAN
HARGA
SATUAN (Rp.)
(Rp.)
9,091.00
3,804.00
7,756.00
751,643.88
2,422,006.80
3,924,380.88
59,482.00
386,000.00
237,928.00
386,000.00
Sub Jumlah
7,721,959.56
31,504.00
15,098.00
290,151.84
62,052.78
238,704.00
136,061.28
488,265.90
738,720.00
3,346,401.60
111,645.00
42,729.00
105,598.00
3,286,828.80
2,515,883.52
53,430,476.04
Sub Jumlah
Sub Jumlah
62,579,589.96
5,400,484.00
6,771,775.00
2,322,208.12
1,557,508.25
7,842,775.00
7,745,275.00
3,372,393.25
1,394,149.50
Sub Jumlah
8,646,259.12
5,810,000.00
91,673.00
116,652.00
1,626,800.00
1,375,095.00
4,666,080.00
200,201.00
77,713.00
2,002,010.00
32,271,100.38
74,962.00
103,976.00
16,599,585.28
1,039,760.00
127,105.00
20,756.00
2,196,374.40
3,450,892.56
750,000.00
20,501.00
750,000.00
2,525,723.20
Sub Jumlah
Sub Jumlah
JUMLAH
HARGA
68,503,420.82
9,423,730.00
637,238.00
199,936.00
4,146,441.20
802,919.88
2,879,078.40
1,000,000.00
113,167.00
1,000,000.00
2,716,008.00
472,951.00
3,000,000.00
12,414,963.75
3,000,000.00
191,885.00
40,813.00
959,425.00
612,195.00
152,023.00
957,744.90
29,488,776.13
179,600.00
13,110,800.00
179,600.00
360,000.00
5,388,000.00
12,240,000.00
115,000.00
98,000.00
3,220,000.00
1,078,000.00
29,000.00
26,500.00
377,000.00
53,000.00
26,500.00
56,000.00
424,000.00
560,000.00
450,000.00
350,000.00
900,000.00
700,000.00
38,050,800.00
31,159.00
8,632,912.54
31,159.00
25,872.00
9,310,309.20
20,133,590.40
44,423.00
73,763.00
28,284,124.10
5,937,921.50
Sub Jumlah
Sub Jumlah
72,298,857.74
JUMLAH
7,721,959.56
488,265.90
62,579,589.96
8,646,259.12
68,503,420.82
29,488,776.13
38,050,800.00
72,298,857.74
287,777,929.23
287,777,000.00
:
:
:
:
VOL
SAT
PEKERJAAN PENGECATAN/FINISHING
2
3
4
5
284.26
249.84
929.00
m
m
m
50.40
1.00
m
ls
Sub Jumlah
REKAPITULASI
RENCANA ANGGARAN BIAYA ( RAB )
Kegiatan
Pekerjaan
Lokasi
Tahun Anggaran
: 2013
NO
URAIAN PEKERJAAN
PEKERJAAN PENGECATAN/FINISHING
JUMLAH
DIBULATKAN
HARGA
SATUAN (Rp.)
Sub Jumlah
JUMLAH
HARGA
(Rp.)
31,159.00
31,159.00
25,872.00
8,857,257.34
7,784,764.56
24,035,088.00
42,263.00
200,000.00
2,130,055.20
200,000.00
43,007,165.10
16 Jawa Barat
JUMLAH
43,007,165.10
43,007,165.10
43,007,000.00
Pekerjaan
Lokasi
Tahun Anggaran
: 2013
NO
URAIAN PEKERJAAN
VOL
SAT
HARGA
SATUAN (Rp.)
I
1
PEKERJAAN PERSIAPAN
Pek. Bouwplank
II
1
2
3
III
1
2
2
PEKERJAAN PASANGAN
Pas. Plesteran beton 1 : 3 + Acian
Pas. Plesteran Ban - banan
Pas. Lantai Keramik 40/40 set Corak MULIA
IV
1
2
3
4
PEKERJAAN BETON
Pas. Pondasi Plat beton
Pek. Sloof Beton Tulang 15/20(180 kg besi + bekisting)
Pek. Kolom Beton Tulang 20/20 (180kg besi + bekisting)
Pek. Ring Balok Beton Tulang 15/25 (220kg besi + bekisting)
V
1
2
2
3
4
5
6
7
0.80
69.60
69.60
12.00
69.60
8.00
33.50
17.40
m
m
m'
m'
m
ls
m'
m'
Sub Jumlah
8,472,960.00
91,673.00
98,500.00
103,976.00
100,334.00
102,467.00
20,501.00
63,839.00
VI
1
2
PEKERJAAN PENGECATAN/FINISHING
Pengecatan Kayu set Glotex 3 X Laburan
Pengecatan Dinding set Vinilex 3 X Laburan
57.72
37.12
m
m
Sub Jumlah
48,750.00
29,907.00
10.00
m'
Sub Jumlah
59,482.00
3.84
5.28
1.92
m
m
m
Sub Jumlah
31,504.00
15,098.00
238,704.00
37.12
27.00
22.90
m
m'
m
Sub Jumlah
42,729.00
42,729.00
105,598.00
0.96
0.58
1.08
0.72
m
m
m
m
4,503,833.00
5,400,484.00
8,139,775.00
6,568,944.00
Sub Jumlah
REKAPITULASI
RENCANA ANGGARAN BIAYA ( RAB )
Kegiatan
Pekerjaan
Lokasi
Tahun Anggaran
: 2013
NO
I
II
III
IV
V
VI
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
PEKERJAAN GALIAN TANAH
PEKERJAAN PASANGAN
PEKERJAAN BETON
PEKERJAAN RANGKA ATAP BESI
PEKERJAAN PENGECATAN/FINISHING
JUMLAH
DIBULATKAN
TERBILANG : LIMA PULUH TUJUH JUTA LIMA RATUS TUJUH BELAS RIBU RUPIAH.-
Bogor. .2013
Konsultan Perencana
CV. FADEL PUTRA
YEYEN SURYANA. ST
Direktur
JUMLAH
HARGA (Rp.)
594,820.00
594,820.00
120,975.36
79,717.44
458,311.68
659,004.48
1,586,100.48
1,153,683.00
2,418,194.20
5,157,977.68
4,323,679.68
3,132,280.72
8,790,957.00
4,729,639.68
16,652,877.40
6,778,368.00
6,380,440.80
6,855,600.00
1,247,712.00
6,983,246.40
819,736.00
686,783.50
1,110,798.60
30,862,685.30
2,813,850.00
1,110,147.84
3,923,997.84
IAH.-
JUMLAH
594,820.00
659,004.48
5,157,977.68
16,652,877.40
30,862,685.30
3,923,997.84
57,851,362.70
57,851,000.00
Pekerjaan
Lokasi
Tahun Anggaran
: 2013
NO
URAIAN PEKERJAAN
VOL
SAT
HARGA
SATUAN (Rp.)
I
1
PEKERJAAN PERSIAPAN
Pek. Bouwplank
II
1
2
3
III
1
2
3
4
4
5
PEKERJAAN PASANGAN
Pas. Bata merah
1:5
Pas. Plesteran 1 : 5 + Acian
Pas. Plesteran beton 1 : 3 + Acian
Pas. Plesteran Ban - banan
Pas. Lantai Keramik 40/40 set Corak MULIA
Pas. Batu Tempel Hitam
IV
1
2
3
4
5
PEKERJAAN BETON
Pas. Pondasi Plat beton
Pek. Sloof Beton Tulang 15/20(180 kg besi + bekisting)
Pek. Kolom Beton Tulang 20/20 (180kg besi + bekisting)
Pek. Ring Balok Beton Tulang 15/25 (175kg besi + bekisting)
Pek. Plat Beton 10 Cm
V
1
2
3
4
5
6
45.76
37.28
22.40
45.76
17.40
44.80
m
m
m'
m
ls
m'
Sub Jumlah
180,000.00
74,962.00
103,976.00
100,334.00
102,467.00
20,501.00
VI
1
2
PEKERJAAN PENGECATAN/FINISHING
Pengecatan Dinding set Vinilex 3 X Laburan
Pengecatan Plafond set Metrolite 3 X Laburan
31.68
73.12
m
m
Sub Jumlah
29,907.00
61,782.00
10.00
m'
Sub Jumlah
59,482.00
3.84
5.28
1.92
m
m
m
Sub Jumlah
31,504.00
15,098.00
238,704.00
m
m
m
m'
m
m
111,645.00
42,729.00
56,492.00
42,729.00
105,598.00
214,526.00
3.84
7.68
24.00
7.20
22.90
24.00
Sub Jumlah
0.96
0.58
0.96
1.15
1.82
m
m
m
m
m
4,503,833.00
5,400,484.00
8,139,775.00
6,568,944.00
7,564,407.00
Sub Jumlah
REKAPITULASI
RENCANA ANGGARAN BIAYA ( RAB )
Kegiatan
Pekerjaan
Lokasi
Tahun Anggaran
NO
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
II
III
PEKERJAAN PASANGAN
IV
PEKERJAAN BETON
VI
PEKERJAAN PENGECATAN/FINISHING
JUMLAH
DIBULATKAN
TERBILANG : TUJUH PULUH JUTA SERATUS SEMBILAN PULUH DELAPAN RIBU RUPIAH.-
Bogor. .2013
Konsultan Perencana
CV. FADEL PUTRA
YEYEN SURYANA. ST
Direktur
JUMLAH
HARGA (Rp.)
594,820.00
594,820.00
120,975.36
79,717.44
458,311.68
659,004.48
428,716.80
328,158.72
1,355,808.00
307,648.80
2,418,194.20
5,148,624.00
9,987,150.52
4,323,679.68
3,132,280.72
7,814,184.00
7,554,285.60
13,767,220.74
32,267,971.06
8,236,800.00
2,794,583.36
2,329,062.40
4,591,283.84
1,782,925.80
918,444.80
20,653,100.20
947,453.76
4,517,499.84
5,464,953.60
UPIAH.-
JUMLAH
594,820.00
659,004.48
9,987,150.52
32,267,971.06
20,653,100.20
5,464,953.60
69,626,999.86
69,626,000.00
Pekerjaan
Lokasi
Tahun Anggaran
: 2013
NO
URAIAN PEKERJAAN
I
1
PEKERJAAN PERSIAPAN
Pek. Bouwplank
II
1
2
3
III
1
2
3
4
4
PEKERJAAN PASANGAN
Pas. Bata merah
1:5
Pas. Plesteran 1 : 5 + Acian
Pas. Plesteran beton 1 : 3 + Acian
Pas. Plesteran Ban - banan
Pas. Lantai Keramik 40/40 set Corak MULIA
IV
1
2
3
PEKERJAAN BETON
Pas. Pondasi Plat beton
Pek. Sloof Beton Tulang 15/20(180 kg besi + bekisting)
Pek. Kolom Beton Tulang 20/20 (180kg besi + bekisting)
V
1
2
3
VI
1
2
PEKERJAAN PENGECATAN/FINISHING
Pengecatan Besi set Glotex 3 X Laburan
Pengecatan Dinding set Vinilex 3 X Laburan
VOL
SAT
HARGA
SATUAN (Rp.)
10.00
m'
Sub Jumlah
59,482.00
3.84
5.28
1.92
m
m
m
Sub Jumlah
31,504.00
15,098.00
238,704.00
m
m
m
m'
m
111,645.00
42,729.00
56,492.00
42,729.00
105,598.00
14.40
28.80
24.00
27.00
22.90
Sub Jumlah
0.96
0.58
0.96
m
m
m
4,503,833.00
5,400,484.00
8,337,775.00
Sub Jumlah
137.16
492.66
34.80
m
m
m'
37,002.00
37,002.00
450,000.00
Sub Jumlah
24.05
60.90
m
m
Sub Jumlah
48,750.00
29,907.00
REKAPITULASI
RENCANA ANGGARAN BIAYA ( RAB )
Kegiatan
Pekerjaan
Lokasi
Tahun Anggaran
NO
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
II
III
PEKERJAAN PASANGAN
IV
PEKERJAAN BETON
VI
PEKERJAAN PENGECATAN/FINISHING
JUMLAH
DIBULATKAN
TERBILANG : ENAM PULUH SATU JUTA ENAM RATUS ENAM PULUH SATU RIBU RUPIAH.-
Bogor. .2013
Konsultan Perencana
CV. FADEL PUTRA
YEYEN SURYANA. ST
Direktur
JUMLAH
HARGA (Rp.)
594,820.00
594,820.00
120,975.36
79,717.44
458,311.68
659,004.48
1,607,688.00
1,230,595.20
1,355,808.00
1,153,683.00
2,418,194.20
7,765,968.40
4,323,679.68
3,132,280.72
8,004,264.00
11,136,544.72
5,075,194.32
18,229,405.32
15,660,000.00
38,964,599.64
1,172,437.50
1,821,336.30
2,993,773.80
UPIAH.-
JUMLAH
594,820.00
659,004.48
7,765,968.40
11,136,544.72
38,964,599.64
2,993,773.80
62,114,711.04
62,114,000.00