0% found this document useful (0 votes)
406 views2 pages

Rab Penawaran Pengukuran Lahan Spbu Barru

This document provides a budget plan for land surveying of a proposed gas station site in Barru Regency, Indonesia. It outlines the direct personnel costs, which include hiring an expert operator, assistant operator, and driver. It also lists the direct non-personnel costs, such as renting GPS and surveying equipment, vehicle rental and fuel, staff accommodations and meals, and data processing. The total estimated cost for the land surveying project is 4,060,000 Indonesian Rupiah.

Uploaded by

alan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
406 views2 pages

Rab Penawaran Pengukuran Lahan Spbu Barru

This document provides a budget plan for land surveying of a proposed gas station site in Barru Regency, Indonesia. It outlines the direct personnel costs, which include hiring an expert operator, assistant operator, and driver. It also lists the direct non-personnel costs, such as renting GPS and surveying equipment, vehicle rental and fuel, staff accommodations and meals, and data processing. The total estimated cost for the land surveying project is 4,060,000 Indonesian Rupiah.

Uploaded by

alan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

RENCANA ANGGARAN BIAYA

PENGUKURAN LAHAN RENCANA SPBU


KABUPATEN BARRU
I. BIAYA LANGSUNG PERSONIL
ITEMS

Durasi
(hari)

Harga
Satuan
(IDR)

UNIT

VOL

A. Tenaga Ahli
Operator Alat Ukur
Asisten Operator

prsn
prsn

1
1
2

1
1

700,000.00
300,000.00

B. Tenaga Pendukung
Sopir

prsn

250,000.00

UNIT

VOL

Duration
(day)

Unit
Set

1
1

2
2

100,000.00
350,000.00

Unit/Hari
Ltr

1
20

2
2

300,000.00
6,500.00

Orang/Hari

50,000.00

Doc

Sub Total A
II. BIAYA LANGSUNG NON PERSONIL
ITEMS

A. Sewa Alat
GPS Garmin 76 Csx
Total Station
B. Transportasi
Rental Mobil
Bensin
C. Akomodasi dan Konsumsi
Konsumsi
D. Olah Data dan Penggambaran
Olah Data (Topography)

Unit Cost

700,000

Sub Total B
TOTAL COST (I+II)

IDR

TOTAL COST

700,000.00
300,000.00
1,000,000.00
250,000.00
450,000.00
1,450,000.00

TOTAL COST

200,000.00
700,000.00
900,000.00
600,000.00
260,000.00
860,000.00
150,000.00

700,000.00
700,000.00
2,610,000.00
4,060,000.00