0% found this document useful (0 votes)
119 views

Grand Total: PHP: Planning Development

The document is a payment request from CHLEI Construction & Development, Inc. to Evia Commercial for the construction of a steel and spandek perimeter fence. It includes a list of materials used and their costs totaling PHP181,785. It also includes labor costs of PHP63,000 and additional fees, bringing the grand total to PHP280,285. An alternative negotiated price of PHP215,000 is also noted.

Uploaded by

Maryknoll Sab
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
119 views

Grand Total: PHP: Planning Development

The document is a payment request from CHLEI Construction & Development, Inc. to Evia Commercial for the construction of a steel and spandek perimeter fence. It includes a list of materials used and their costs totaling PHP181,785. It also includes labor costs of PHP63,000 and additional fees, bringing the grand total to PHP280,285. An alternative negotiated price of PHP215,000 is also noted.

Uploaded by

Maryknoll Sab
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 8

CHLEI CONSTRUCTION & DEVELOPMENT, INC.

PLANNING

DEVELOPMENT
Block 5 Lot 4 Jupiter St. Sunnyside Hts. Batasan Hills, QC

JULY 4,2013
To:

Re:

Engr. Adrian Chua


Production Head
Evia Commercial
Payment Request for Evia Commercial Steel &
Spandek Perimeter Fencing
* * * *

Dear Sir,
This billing is for the Construction of Steel and Spandek Perimeter Fence at
Evia Commercial Area (125 linear meter). The details:
30 pcs. #2 BI Pipe
20 pcs. #1 1/4 BI Pipe
25 pcs. #1 1/2 GI Pipe
95 pcs. 10 ft. long Spandek
1500 pcs. Tekscrew 1 1/2
40 bags Cement
4 cu.m. 3/4 Gravel
2.5 cu.m. White Sand
8 gal.
Red Oxide
1
lot
Power Tools & Hardware
MATERIAL COST:
LABOR COST:
SUB-TOTAL:
TAXES PROVISIONS:
MARK-UP:
GRAND TOTAL:
Thanks!

Floro Regencia

Php

Php

Gen Manager

MENT, INC.
CONSTRUCTION

dek Perimeter Fence at

26,400.00
7,700.00
16,250.00
90,250.00
2,250.00
13,200.00
4,200.00
2,375.00
4,160.00
15,000.00
181,785.00
63,000.00
244,785.00
10,500.00
25,000.00
280,285.00

30 pcs. #2 BI Pipe
20 pcs. #1 1/4 BI Pipe
25 pcs. #1 1/2 GI Pipe
95 pcs. 10 ft. long Spandek
1500 pcs. Tekscrew 1 1/2
40 bags Cement
4 cu.m. 3/4 Gravel
2.5 cu.m. White Sand
8 gal.
Red Oxide
1
lot
Power Tools & Hardware
MATERIAL COST:
LABOR COST:
SUB-TOTAL:
TAXES PROVISIONS:
MARK-UP:
GRAND TOTAL:

Php

Php

18,880.00
6,800.00
14,800.00
79,900.00
1,890.00
11,995.00
3,800.00
2,115.00
3,985.00
8,000.00
152,165.00
40,000.00
192,165.00
8,500.00
19,216.50
219,881.50

Project
Location
Date

: Steel & Spandek Fence


: Evia, Daanghari
: 20-May-16

ITEM
1
2
3
4
5
6
7
8
9
10

QUANTITY

BI Pipe #2
BI Pipe #1 1/4
GI Pipe #1 1/2
Spandek 10 ft.
Tekscrew 1 1/2
Cement
Gravel 3/4
White Sand
Red oxide
Power Tools & Hardware

UNIT

30
pcs.
20
pcs.
25
pcs.
95
pcs.
1500
pcs.
40 bags
4 cu.m.
2.5 cu.m.
8
gal
1
lot
MATERIAL COST
LABOR COST
TAXES
MARK-UP

GRAND TOTAL
NEGO. PRICE:

Prepared by:

CHLEI CONSTRUCTION
& DEVT., INC.
26,400.00
7,700.00
16,250.00
90,250.00
2,250.00
13,200.00
4,200.00
2,375.00
4,160.00
15,000.00
181,785.00
63,000.00
10,500.00
25,000.00

Php280,285.00
Php215,000.00

Noted by:

ENGR. MARYKNOLL SAB

Noted and Endorsed by:

ARCH. PETER ESTANISLAO

ENGR. AL CHUA

MA. LENI D. LUYA

IN-HOUSE
18,880.00
6,800.00
14,800.00
79,900.00
1,890.00
11,995.00
3,800.00
2,115.00
3,985.00
8,000.00
152,165.00
40,000.00
8,500.00
19,216.50

Php219,881.50

Approved by:

MS. LEAH HARLEA