PARK ONE
COMMERCIAL & LUXURY APARTMENTS
Daily Construction Report
WEATHER
TEMPERATURE: 31oC
CONDITIONS:
Snow
sunny
Partly Cloudy
Cloudy
Windy
WORKMEN/EQUIPMENT
WORKERS
Contract #01
Bukhari (piling
sub-contractor)
Mgt staff: 1
Labors:
TOTAL
Contract #05
Ch Zulfiqar
(excavation)
TESTS/INSPECTIONS
Contract #02
Contract #03
Sabz ali
(pile head
cutting)
Contract #04
Ishaq butt
(steel fixer)
Mgt staff: 1
Mgt staff:
Labors:
31
Labors:
TOTAL
32
TOTAL
10
Contract #06
Mgt staff: 1
Labors:
TOTAL
Contract #07
Azam (concrete
mobile pump)
1. Concrete compressive strength test
2.Pile load test (in process)
Royal
geotech(piling
sub -contractor)
9
10
Contract #08
Nazar(rental
excavator)
Deepwell (piling
sub-contractor)
Machines: 3
Mgt staff: 1
Mgt staff: 1
Mgt staff: 1
Labors:
Labors:
Labors:
TOTAL
TOTAL
TOTAL
Contract #09
Abbot
Construction
(Plastering)
Contract #10
Al-wahab
(Rental mobile
crane)
Mgt staff: 1
Mgt staff: 1
Labors:
Labors:
TOTAL 6
TOTAL
Mgt staff: 1
Labors:
TOTAL
Contract #11
Majid cont
(plastering)
Mgt staff: 1
Labors: 16
TOTAL
16
This legend shows the contractors working on a particular day.
21
22
Rain
EQUIPMENTS AVAILABLE AT SITE
REMARKS
REMARKS
EQUIPMENT AVAILABLE AT SITE
1. Auger machine
8.concrete mobile pump
9. Tractor
2. Excavator
3. Dewatering pumps
10. Mobile crane
11.Batching plant
12. Compressive testing machine
13.Plate compactor
4. Air compressor
01m
5. Welding plant
6. Dumper
7. Concrete mixer
SAFETY NOTE
Nil
KEY ACTIVITIES
Activity
1.steel cage fabrication
Qty
5
Unit
#
Total
-
2.de watering
Occurring (Quantity not available)
3.pile concreting
991
4.levelling and spreading
5.pile boring/drilling
6.Slush removal
Occurring (Quantity not available)
Activity detail
1.Pile concreting
Zone
1
Pile concreted
(particular
day )
-
Pile
concreted to
date
186
2
3
2
7
460
345
Total piles
Pile No
186
ICL-RCPL
Remarks
75
466
623,622
405
1049,1053,1046,829,828,827,826
Total pile concreted=991
2.Concrete compressive strength test for piles
Sample No of
Concrete
Pile No
#
days
Purchased
from
1
28
Sarwar
152,831,832,833,107,108,151
2
Total Concrete
used (M)
1042,1043,1044,670,671,1054
Strength
achieved (psi)
4463
3975
Required
strength
(28 days)
4000
Remarks
Passed
-
3.Pile cutting and excavation:
Pile cap
Grid
Zone
Excavation
PC 156
F~8
In process
Pile head cutting
Previous
This day
To date
102
20
122
PC4 A
F~3-4
Completed
4.Steel fixing and formwork:
Pile cap
Grid
PC12B
C~4-5
PC17
E~5
5.Plastering:
Location
Main office
Mustafa tower side
Status
Completed
Formwork
Placed
In process
Not placed
Grid
1~6
1~6
Completion status
Completed
5~6 (80 % completed)
6.Concrete compressive strength test for pile caps:
Pile Cap
Grid
-
Strength achieved
-
Remarks
Remarks
Bottom and top
reinforcement placed
Bottom main and dist bars
placed
Remarks
RFI awaited
RFI awaited
Strength Required (28 days)
-
Remarks
-
7.Pile load test result:
Pile no 711 grid F~11.
8. Dewatering was occurring.
9. Slush removal occurring.
11.Plastering Mustafa tower side grid 1~6 95% completed..
MATERIAL DELIVERIES
Items
DATE
1-05-2016
SOURCE/VENDOR
Signature
QTY
UNIT
REMARKS