4/15/2016
Table2.3
ESTIMATED COST OF BRIDGE STRUCTURE PER LINEAR METER (PESOS)
As of March 2015
Table 2.3
DRYORLOW
HIGHORDEEP
DRYORLOW
HIGHORDEEP
WATERLEVEL
WATERLEVEL
WATERLEVEL
WATERLEVEL WATERLEVEL WATERLEVEL
DRYORLOW
HIGHORDEEP
BRIDGESITECONDITION
ITEM
TYPEOFBRIDGESTRUCTURE
NCR
I.NEWCONSTRUCTION
A.
B.
CAR
REGION I
CONCRETEBRIDGESTRUCTURE
PSCGIRDERBRIDGEWITHBOREDPILE
1.)
FOUNDATION
PSCGIRDERBRIDGEWITHR.C.PILE
2.)
FOUNDATION
3.)
RCDGBRIDGEWITHR.C.PILEFOUNDATION
SINGLESPANRCDGBRIDGEWITHR.C.PILE
4.)
FOUNDATION
STEELBRIDGESTRUCTURE
STEELTRUSSWITHBOREDPILE
1.)
FOUNDATION
506,974.11 907,228.52 517,057.40 921,884.01 540,750.85 941,528.54
440,001.78 864,228.40 438,300.28 868,211.58 497,808.82 923,135.40
308,499.18 783,080.95 307,341.65 787,853.61 326,245.57 801,743.51
273,225.17 629,914.57 270,131.65 633,266.26 288,721.62 637,857.02
withstructural
craneway
withoutcraneway
withstructural
withstructural
withoutcraneway
craneway
craneway
withoutcraneway
2.)
STEELTRUSSWITHR.C.PILEFOUNDATION
646,175.30 1,002,372.17 639,243.91 999,491.94 648,585.17 1,005,208.58
3.)
STEELGIRDERWITHBOREDPILE
FOUNDATION
639,999.07 1,046,887.92 647,693.96 1,058,805.09 634,489.40 1,041,470.85
4.)
STEELGIRDERWITHR.C.PILEFOUNDATION 573,587.68 1,003,761.44 569,574.57 1,005,013.45 592,133.50 1,022,960.39
C.
CONCRETEFLYOVER
1.)
CONCRETEFLYOVER,PSCGTYPEIV,L
=30M/35MPERSPAN
762,292.94 1,103,635.30 755,859.38 1,102,829.67 749,067.37 1,092,032.36
451,105.61
457,955.94
491,287.62
II.REPLACEMENT/RECONSTRUCTION
1.)
RCDGIRDERBRIDGE
2.)
STEELBRIDGE
III.BRIDGEREPAIR
1.)
428,743.28
416,729.08
415,898.55
add15%totheNewConstructionofBridge
add15%totheNewConstructionofBridge
BRIDGERETROFITTING
a. RetrofittingofSuperstucture
578,666.52
568,329.51
564,903.55
2.)
b. RetrofittingofSubstructureandSuperstucture
REPLACEMENTOFSUPERSTRUCTURE
397,637.81
398,073.51
442,184.87
3.)
REDECKING
208,787.17
209,685.52
ITEM
DRYORLOW
HIGHORDEEP
DRYORLOW
HIGHORDEEP
WATERLEVEL
WATERLEVEL
WATERLEVEL
WATERLEVEL WATERLEVEL WATERLEVEL
REGION II
A.
TYPEOFBRIDGESTRUCTURE
I.NEWCONSTRUCTION
BRIDGESITECONDITION
209,501.99
B.
DRYORLOW
REGION III
HIGHORDEEP
REGION IVA
CONCRETEBRIDGESTRUCTURE
PSCGIRDERBRIDGEWITHBOREDPILE
1.)
FOUNDATION
PSCGIRDERBRIDGEWITHR.C.PILE
2.)
FOUNDATION
3.)
RCDGBRIDGEWITHR.C.PILEFOUNDATION
SINGLESPANRCDGBRIDGEWITHR.C.PILE
4.)
FOUNDATION
STEELBRIDGESTRUCTURE
STEELTRUSSWITHBOREDPILE
1.)
FOUNDATION
553,889.93 965,362.99 523,317.58 925,806.53 511,424.86 910,017.67
504,483.80 941,271.50 455,834.30 882,713.64 484,618.58 907,773.36
329,042.52 816,441.87 302,548.16 779,318.74 350,014.63 823,290.60
290,653.80 649,992.42 267,425.67 623,443.31 301,757.43 663,374.43
withstructural
craneway
withoutcraneway
withstructural
withstructural
withoutcraneway
craneway
craneway
withoutcraneway
759,649.71 1,112,149.68 751,570.51 1,095,583.21 757,469.86 1,098,566.86
2.)
STEELTRUSSWITHR.C.PILEFOUNDATION 653,456.91 1,019,480.67 638,646.42 996,733.35 664,442.99 1,018,987.87
3.)
STEELGIRDERWITHBOREDPILE
FOUNDATION
4.)
STEELGIRDERWITHR.C.PILEFOUNDATION 596,401.01 1,038,685.99 567,315.38 999,888.50 616,717.18 1,045,481.55
C.
CONCRETEFLYOVER
CONCRETEFLYOVER,PSCGTYPEIV,L
1.)
=30M/35MPERSPAN
645,187.83 1,062,897.42 634,237.71 1,043,101.63 642,949.93 1,047,848.74
500,316.40
470,509.28
451,649.94
II.REPLACEMENT/RECONSTRUCTION
1.)
RCDGIRDERBRIDGE
2.)
STEELBRIDGE
III.BRIDGEREPAIR
1.)
414,982.95
419,612.41
419,466.78
567,536.32
567,828.72
567,707.61
446,704.37
421,181.13
398,215.73
add15%totheNewConstructionofBridge
add15%totheNewConstructionofBridge
BRIDGERETROFITTING
a. RetrofittingofSuperstucture
b. RetrofittingofSubstructureandSuperstucture
2.)
REPLACEMENTOFSUPERSTRUCTURE
3.)
REDECKING
208,942.63
206,976.78
209,719.20
DRYORLOW
HIGHORDEEP
DRYORLOW
HIGHORDEEP
WATERLEVEL
WATERLEVEL
WATERLEVEL
WATERLEVEL WATERLEVEL WATERLEVEL
DRYORLOW
HIGHORDEEP
BRIDGESITECONDITION
ITEM
TYPEOFBRIDGESTRUCTURE
REGION IVB
I.NEWCONSTRUCTION
A.
CONCRETEBRIDGESTRUCTURE
PSCGIRDERBRIDGEWITHBOREDPILE
1.)
FOUNDATION
REGION V
REGION VI
534,862.10 938,594.96 550,599.52 953,989.84 545,617.98 954,447.79
http://www.dpwh.gov.ph/infrastructure/infra_stat/ATLAS%202014/2014%20Atlas/table_2_3.htm
1/3
4/15/2016
Table2.3
2.)
3.)
PSCGIRDERBRIDGEWITHR.C.PILE
FOUNDATION
RCDGBRIDGEWITHR.C.PILEFOUNDATION
SINGLESPANRCDGBRIDGEWITHR.C.PILE
FOUNDATION
4.)
B.
STEELBRIDGESTRUCTURE
STEELTRUSSWITHBOREDPILE
1.)
FOUNDATION
482,368.84 911,343.86 527,233.85 955,828.86 537,709.49 972,238.06
337,853.25 817,688.39 356,427.52 835,691.52 391,196.60 877,076.28
292,014.16 662,553.16 305,435.77 675,229.59 328,187.56 713,685.08
withstructural
craneway
withoutcraneway
withstructural
withstructural
withoutcraneway
craneway
craneway
withoutcraneway
774,286.28 1,120,785.23 754,182.98 1,100,028.89 778,705.18 1,130,119.09
2.)
STEELTRUSSWITHR.C.PILEFOUNDATION 661,305.31 1,020,589.17 667,749.42 1,026,592.74 687,701.19 1,051,586.21
3.)
STEELGIRDERWITHBOREDPILE
FOUNDATION
4.)
STEELGIRDERWITHR.C.PILEFOUNDATION 601,746.00 1,036,238.26 622,189.89 1,056,299.91 658,314.50 1,098,414.45
C.
CONCRETEFLYOVER
CONCRETEFLYOVER,PSCGTYPEIV,L
1.)
=30M/35MPERSPAN
653,572.29 1,063,615.32 644,924.12 1,054,581.89 665,598.92 1,080,750.78
476,420.45
add15%totheNewConstructionofBridge
add15%totheNewConstructionofBridge
a. RetrofittingofSuperstucture
b. RetrofittingofSubstructureandSuperstucture
2.)
REPLACEMENTOFSUPERSTRUCTURE
3.)
REDECKING
488,485.91
BRIDGERETROFITTING
472,909.50
II.REPLACEMENT/RECONSTRUCTION
1.)
RCDGIRDERBRIDGE
2.)
STEELBRIDGE
III.BRIDGEREPAIR
1.)
417,304.63
418,571.17
419,866.58
570,296.25
564,793.39
574,823.48
413,392.83
444,629.44
413,667.02
210,407.14
211,926.97
211,854.43
BRIDGESITECONDITION
ITEM
TYPEOFBRIDGESTRUCTURE
DRYORLOW
HIGHORDEEP
DRYORLOW
HIGHORDEEP
WATERLEVEL
WATERLEVEL
WATERLEVEL
WATERLEVEL WATERLEVEL WATERLEVEL
REGION VII
I.NEWCONSTRUCTION
A.
B.
DRYORLOW
REGION VIII
HIGHORDEEP
REGION IX
CONCRETEBRIDGESTRUCTURE
PSCGIRDERBRIDGEWITHBOREDPILE
1.)
FOUNDATION
PSCGIRDERBRIDGEWITHR.C.PILE
2.)
FOUNDATION
3.)
RCDGBRIDGEWITHR.C.PILEFOUNDATION
SINGLESPANRCDGBRIDGEWITHR.C.PILE
4.)
FOUNDATION
STEELBRIDGESTRUCTURE
STEELTRUSSWITHBOREDPILE
1.)
FOUNDATION
528,584.11 932,878.99 543,129.35 944,535.10 550,913.72 938,226.10
452,940.50 881,787.87 495,413.42 923,545.88 473,852.99 885,501.35
319,863.22 799,286.28 359,977.45 839,575.57 341,740.97 803,328.40
286,247.94 647,127.13 313,722.61 682,600.57 291,749.19 664,811.37
withstructural
craneway
withoutcraneway
withstructural
withstructural
withoutcraneway
craneway
craneway
withoutcraneway
776,063.47 1,121,861.64 783,307.07 1,129,000.26 787,781.33 1,120,463.28
2.)
STEELTRUSSWITHR.C.PILEFOUNDATION 653,216.06 1,012,739.22 673,826.45 1,032,259.06 663,876.25 1,008,833.18
3.)
STEELGIRDERWITHBOREDPILE
FOUNDATION
4.)
STEELGIRDERWITHR.C.PILEFOUNDATION 582,330.03 1,016,811.80 624,068.02 1,057,715.49 602,323.24 1,019,528.58
C.
CONCRETEFLYOVER
CONCRETEFLYOVER,PSCGTYPEIV,L
1.)
=30M/35MPERSPAN
II.REPLACEMENT/RECONSTRUCTION
1.)
RCDGIRDERBRIDGE
2.)
STEELBRIDGE
III.BRIDGEREPAIR
1.)
657,394.34 1,068,032.18 671,163.94 1,078,830.20 678,736.59 1,072,381.79
469,946.81
476,930.66
add15%totheNewConstructionofBridge
add15%totheNewConstructionofBridge
a. RetrofittingofSuperstucture
b. RetrofittingofSubstructureandSuperstucture
423,073.89
421,520.75
421,659.57
577,530.69
580,884.22
579,694.82
407,497.96
2.)
REPLACEMENTOFSUPERSTRUCTURE
406,226.70
407,558.30
3.)
REDECKING
213,795.02
217,360.64
478,883.79
BRIDGERETROFITTING
215,088.09
BRIDGESITECONDITION
ITEM
TYPEOFBRIDGESTRUCTURE
DRYORLOW
HIGHORDEEP
DRYORLOW
HIGHORDEEP
WATERLEVEL
WATERLEVEL
WATERLEVEL
WATERLEVEL WATERLEVEL WATERLEVEL
REGION X
I.NEWCONSTRUCTION
A.
B.
DRYORLOW
REGION XI
HIGHORDEEP
REGION XII
CONCRETEBRIDGESTRUCTURE
PSCGIRDERBRIDGEWITHBOREDPILE
1.)
FOUNDATION
PSCGIRDERBRIDGEWITHR.C.PILE
2.)
FOUNDATION
3.)
RCDGBRIDGEWITHR.C.PILEFOUNDATION
SINGLESPANRCDGBRIDGEWITHR.C.PILE
4.)
FOUNDATION
STEELBRIDGESTRUCTURE
STEELTRUSSWITHBOREDPILE
1.)
FOUNDATION
554,539.25 997,623.85 593,653.98 1,040,934.35 612,885.07 1,086,467.92
502,285.06 973,466.56 535,909.59 1,011,062.76 573,041.49 1,076,356.96
367,715.02 892,911.87 349,305.46 878,228.70 378,394.62 937,825.81
316,036.17 724,423.47 305,164.44 700,089.16 330,288.47 752,793.27
withstructural
craneway
withoutcraneway
withstructural
withstructural
withoutcraneway
craneway
craneway
withoutcraneway
787,695.21 1,169,036.50 796,411.62 1,180,849.18 802,250.97 1,210,048.28
2.)
STEELTRUSSWITHR.C.PILEFOUNDATION 680,123.55 1,074,244.14 672,305.06 1,070,103.20 689,192.05 1,109,897.77
3.)
STEELGIRDERWITHBOREDPILE
FOUNDATION
4.)
STEELGIRDERWITHR.C.PILEFOUNDATION 631,819.69 1,108,587.93 615,012.07 1,095,800.24 643,252.29 1,152,114.22
C.
683,459.63 1,132,870.64 672,127.21 1,125,793.85 682,441.46 1,162,355.63
CONCRETEFLYOVER
CONCRETEFLYOVER,PSCGTYPEIV,L
1.)
=30M/35MPERSPAN
484,976.94
546,332.35
549,996.12
II.REPLACEMENT/RECONSTRUCTION
1.)
RCDGIRDERBRIDGE
2.)
STEELBRIDGE
III.BRIDGEREPAIR
1.)
425,521.64
421,922.17
424,600.14
BRIDGERETROFITTING
a. RetrofittingofSuperstucture
b. RetrofittingofSubstructureandSuperstucture
add15%totheNewConstructionofBridge
add15%totheNewConstructionofBridge
585,068.00
588,389.85
587,248.59
2.)
REPLACEMENTOFSUPERSTRUCTURE
412,636.99
471,392.36
483,633.09
3.)
REDECKING
219,310.24
218,818.95
219,608.64
http://www.dpwh.gov.ph/infrastructure/infra_stat/ATLAS%202014/2014%20Atlas/table_2_3.htm
2/3
4/15/2016
Table2.3
ITEM
BRIDGESITECONDITION
DRYORLOW HIGHORDEEP
TYPEOFBRIDGESTRUCTURE
WATERLEVEL
WATERLEVEL
REGION XIII
I.NEWCONSTRUCTION
A.
B.
CONCRETEBRIDGESTRUCTURE
PSCGIRDERBRIDGEWITHBOREDPILE
1.)
FOUNDATION
PSCGIRDERBRIDGEWITHR.C.PILE
2.)
FOUNDATION
3.)
RCDGBRIDGEWITHR.C.PILEFOUNDATION
SINGLESPANRCDGBRIDGEWITHR.C.PILE
4.)
FOUNDATION
STEELBRIDGESTRUCTURE
STEELTRUSSWITHBOREDPILE
1.)
FOUNDATION
606,859.61 1,050,865.75
548,850.70 1,021,443.18
372,886.30 900,057.78
313,819.11 734,621.58
withstructural
craneway
withoutcraneway
796,490.42 1,179,599.09
2.)
STEELTRUSSWITHR.C.PILEFOUNDATION 681,820.56 1,076,826.32
3.)
STEELGIRDERWITHBOREDPILE
FOUNDATION
693,768.94 1,144,064.81
4.)
STEELGIRDERWITHR.C.PILEFOUNDATION 636,395.10 1,114,518.19
C.
CONCRETEFLYOVER
CONCRETEFLYOVER,PSCGTYPEIV,L
1.)
=30M/35MPERSPAN
II.REPLACEMENT/RECONSTRUCTION
1.)
RCDGIRDERBRIDGE
2.)
STEELBRIDGE
III.BRIDGEREPAIR
1.)
530,870.71
add15%totheNewConstructionof
Bridge
add15%totheNewConstructionof
Bridge
BRIDGERETROFITTING
a. RetrofittingofSuperstucture
b. RetrofittingofSubstructureandSuperstucture
424,571.90
587,652.93
2.)
REPLACEMENTOFSUPERSTRUCTURE
462,238.23
3.)
REDECKING
218,527.04
Note:
1.)
2.)
Thecostestimatehigh/deepwaterlevelconditionincludesStructuralSteelCraneway,StructuralSteelTPlatformandCofferdammingofthefooting
foundation.
CostofReplacement/Reconstructionworkmaybeincreasedby15%ofthenewconstructioncostduetoremovalofexistingbridgestructureand
provisionofdetourandtrafficmanagement.
3.)
Thepriceofconstructionmaterialsarebasedontheregionalaveragepricesplus15%markupforthehaulingcost(4thQuarterofCY2014),
equipmentratesarebasedfromthelatestACELRates(24thEdition)andlaborratesarebasedontheapprovedlaborrates(February2015).
4.)
TheestimatedunitcostwasderivedfromtheassumedtypicaldesignofBridgeStructureandmaybevarydependingontheactualdesign.
5.)
Theretrofittingworksisassumedtobedesignedusingglassfiberreinforcementongirders.
BackHomeUpNext
ForquestionsregardingthisWebsitecontactdpwh_feedback@yahoo.comortheDPWHCFMC.