75% found this document useful (4 votes)
3K views3 pages

DPWH Bridge Structure Per Linear Meter

This document provides estimated cost ranges in Philippine pesos per linear meter for various types of bridge structures across different regions and conditions in the Philippines as of March 2015. It includes costs for new bridge construction, replacement/reconstruction, and bridge repair work for both concrete and steel bridge types. The costs provided vary significantly depending on factors like bridge design, foundation type, presence of craneway, and water level conditions at the bridge site.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
75% found this document useful (4 votes)
3K views3 pages

DPWH Bridge Structure Per Linear Meter

This document provides estimated cost ranges in Philippine pesos per linear meter for various types of bridge structures across different regions and conditions in the Philippines as of March 2015. It includes costs for new bridge construction, replacement/reconstruction, and bridge repair work for both concrete and steel bridge types. The costs provided vary significantly depending on factors like bridge design, foundation type, presence of craneway, and water level conditions at the bridge site.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

4/15/2016

Table2.3

ESTIMATED COST OF BRIDGE STRUCTURE PER LINEAR METER (PESOS)


As of March 2015
Table 2.3

DRYORLOW

HIGHORDEEP

DRYORLOW

HIGHORDEEP

WATERLEVEL

WATERLEVEL

WATERLEVEL

WATERLEVEL WATERLEVEL WATERLEVEL

DRYORLOW

HIGHORDEEP

BRIDGESITECONDITION

ITEM

TYPEOFBRIDGESTRUCTURE

NCR
I.NEWCONSTRUCTION
A.

B.

CAR

REGION I

CONCRETEBRIDGESTRUCTURE
PSCGIRDERBRIDGEWITHBOREDPILE
1.)
FOUNDATION
PSCGIRDERBRIDGEWITHR.C.PILE
2.)
FOUNDATION
3.)
RCDGBRIDGEWITHR.C.PILEFOUNDATION
SINGLESPANRCDGBRIDGEWITHR.C.PILE
4.)
FOUNDATION

STEELBRIDGESTRUCTURE
STEELTRUSSWITHBOREDPILE
1.)
FOUNDATION

506,974.11 907,228.52 517,057.40 921,884.01 540,750.85 941,528.54


440,001.78 864,228.40 438,300.28 868,211.58 497,808.82 923,135.40
308,499.18 783,080.95 307,341.65 787,853.61 326,245.57 801,743.51
273,225.17 629,914.57 270,131.65 633,266.26 288,721.62 637,857.02
withstructural
craneway

withoutcraneway

withstructural
withstructural
withoutcraneway
craneway
craneway

withoutcraneway

2.)

STEELTRUSSWITHR.C.PILEFOUNDATION

646,175.30 1,002,372.17 639,243.91 999,491.94 648,585.17 1,005,208.58

3.)

STEELGIRDERWITHBOREDPILE
FOUNDATION

639,999.07 1,046,887.92 647,693.96 1,058,805.09 634,489.40 1,041,470.85

4.)

STEELGIRDERWITHR.C.PILEFOUNDATION 573,587.68 1,003,761.44 569,574.57 1,005,013.45 592,133.50 1,022,960.39

C.

CONCRETEFLYOVER

1.)

CONCRETEFLYOVER,PSCGTYPEIV,L
=30M/35MPERSPAN

762,292.94 1,103,635.30 755,859.38 1,102,829.67 749,067.37 1,092,032.36

451,105.61

457,955.94

491,287.62

II.REPLACEMENT/RECONSTRUCTION
1.)
RCDGIRDERBRIDGE
2.)
STEELBRIDGE

III.BRIDGEREPAIR
1.)

428,743.28

416,729.08

415,898.55

add15%totheNewConstructionofBridge
add15%totheNewConstructionofBridge

BRIDGERETROFITTING
a. RetrofittingofSuperstucture

578,666.52

568,329.51

564,903.55

2.)

b. RetrofittingofSubstructureandSuperstucture
REPLACEMENTOFSUPERSTRUCTURE

397,637.81

398,073.51

442,184.87

3.)

REDECKING

208,787.17

209,685.52

ITEM

DRYORLOW

HIGHORDEEP

DRYORLOW

HIGHORDEEP

WATERLEVEL

WATERLEVEL

WATERLEVEL

WATERLEVEL WATERLEVEL WATERLEVEL

REGION II
A.

TYPEOFBRIDGESTRUCTURE

I.NEWCONSTRUCTION

BRIDGESITECONDITION

209,501.99

B.

DRYORLOW

REGION III

HIGHORDEEP

REGION IVA

CONCRETEBRIDGESTRUCTURE
PSCGIRDERBRIDGEWITHBOREDPILE
1.)
FOUNDATION
PSCGIRDERBRIDGEWITHR.C.PILE
2.)
FOUNDATION
3.)
RCDGBRIDGEWITHR.C.PILEFOUNDATION
SINGLESPANRCDGBRIDGEWITHR.C.PILE
4.)
FOUNDATION

STEELBRIDGESTRUCTURE
STEELTRUSSWITHBOREDPILE
1.)
FOUNDATION

553,889.93 965,362.99 523,317.58 925,806.53 511,424.86 910,017.67


504,483.80 941,271.50 455,834.30 882,713.64 484,618.58 907,773.36
329,042.52 816,441.87 302,548.16 779,318.74 350,014.63 823,290.60
290,653.80 649,992.42 267,425.67 623,443.31 301,757.43 663,374.43
withstructural
craneway

withoutcraneway

withstructural
withstructural
withoutcraneway
craneway
craneway

withoutcraneway

759,649.71 1,112,149.68 751,570.51 1,095,583.21 757,469.86 1,098,566.86

2.)

STEELTRUSSWITHR.C.PILEFOUNDATION 653,456.91 1,019,480.67 638,646.42 996,733.35 664,442.99 1,018,987.87

3.)

STEELGIRDERWITHBOREDPILE
FOUNDATION

4.)

STEELGIRDERWITHR.C.PILEFOUNDATION 596,401.01 1,038,685.99 567,315.38 999,888.50 616,717.18 1,045,481.55

C.

CONCRETEFLYOVER
CONCRETEFLYOVER,PSCGTYPEIV,L
1.)
=30M/35MPERSPAN

645,187.83 1,062,897.42 634,237.71 1,043,101.63 642,949.93 1,047,848.74

500,316.40

470,509.28

451,649.94

II.REPLACEMENT/RECONSTRUCTION
1.)
RCDGIRDERBRIDGE
2.)
STEELBRIDGE

III.BRIDGEREPAIR
1.)

414,982.95

419,612.41

419,466.78

567,536.32

567,828.72

567,707.61

446,704.37

421,181.13

398,215.73

add15%totheNewConstructionofBridge
add15%totheNewConstructionofBridge

BRIDGERETROFITTING
a. RetrofittingofSuperstucture

b. RetrofittingofSubstructureandSuperstucture

2.)

REPLACEMENTOFSUPERSTRUCTURE

3.)

REDECKING

208,942.63

206,976.78

209,719.20

DRYORLOW

HIGHORDEEP

DRYORLOW

HIGHORDEEP

WATERLEVEL

WATERLEVEL

WATERLEVEL

WATERLEVEL WATERLEVEL WATERLEVEL

DRYORLOW

HIGHORDEEP

BRIDGESITECONDITION
ITEM

TYPEOFBRIDGESTRUCTURE

REGION IVB
I.NEWCONSTRUCTION
A.

CONCRETEBRIDGESTRUCTURE
PSCGIRDERBRIDGEWITHBOREDPILE
1.)
FOUNDATION

REGION V

REGION VI

534,862.10 938,594.96 550,599.52 953,989.84 545,617.98 954,447.79

http://www.dpwh.gov.ph/infrastructure/infra_stat/ATLAS%202014/2014%20Atlas/table_2_3.htm

1/3

4/15/2016

Table2.3

2.)

3.)

PSCGIRDERBRIDGEWITHR.C.PILE
FOUNDATION
RCDGBRIDGEWITHR.C.PILEFOUNDATION
SINGLESPANRCDGBRIDGEWITHR.C.PILE
FOUNDATION

4.)

B.

STEELBRIDGESTRUCTURE
STEELTRUSSWITHBOREDPILE
1.)
FOUNDATION

482,368.84 911,343.86 527,233.85 955,828.86 537,709.49 972,238.06


337,853.25 817,688.39 356,427.52 835,691.52 391,196.60 877,076.28
292,014.16 662,553.16 305,435.77 675,229.59 328,187.56 713,685.08
withstructural
craneway

withoutcraneway

withstructural
withstructural
withoutcraneway
craneway
craneway

withoutcraneway

774,286.28 1,120,785.23 754,182.98 1,100,028.89 778,705.18 1,130,119.09

2.)

STEELTRUSSWITHR.C.PILEFOUNDATION 661,305.31 1,020,589.17 667,749.42 1,026,592.74 687,701.19 1,051,586.21

3.)

STEELGIRDERWITHBOREDPILE
FOUNDATION

4.)

STEELGIRDERWITHR.C.PILEFOUNDATION 601,746.00 1,036,238.26 622,189.89 1,056,299.91 658,314.50 1,098,414.45

C.

CONCRETEFLYOVER
CONCRETEFLYOVER,PSCGTYPEIV,L
1.)
=30M/35MPERSPAN

653,572.29 1,063,615.32 644,924.12 1,054,581.89 665,598.92 1,080,750.78

476,420.45

add15%totheNewConstructionofBridge
add15%totheNewConstructionofBridge

a. RetrofittingofSuperstucture
b. RetrofittingofSubstructureandSuperstucture

2.)

REPLACEMENTOFSUPERSTRUCTURE

3.)

REDECKING

488,485.91

BRIDGERETROFITTING

472,909.50

II.REPLACEMENT/RECONSTRUCTION
1.)
RCDGIRDERBRIDGE
2.)
STEELBRIDGE

III.BRIDGEREPAIR
1.)

417,304.63

418,571.17

419,866.58

570,296.25

564,793.39

574,823.48

413,392.83

444,629.44

413,667.02

210,407.14

211,926.97

211,854.43

BRIDGESITECONDITION
ITEM

TYPEOFBRIDGESTRUCTURE

DRYORLOW

HIGHORDEEP

DRYORLOW

HIGHORDEEP

WATERLEVEL

WATERLEVEL

WATERLEVEL

WATERLEVEL WATERLEVEL WATERLEVEL

REGION VII
I.NEWCONSTRUCTION
A.

B.

DRYORLOW

REGION VIII

HIGHORDEEP

REGION IX

CONCRETEBRIDGESTRUCTURE
PSCGIRDERBRIDGEWITHBOREDPILE
1.)
FOUNDATION
PSCGIRDERBRIDGEWITHR.C.PILE
2.)
FOUNDATION
3.)
RCDGBRIDGEWITHR.C.PILEFOUNDATION
SINGLESPANRCDGBRIDGEWITHR.C.PILE
4.)
FOUNDATION

STEELBRIDGESTRUCTURE
STEELTRUSSWITHBOREDPILE
1.)
FOUNDATION

528,584.11 932,878.99 543,129.35 944,535.10 550,913.72 938,226.10


452,940.50 881,787.87 495,413.42 923,545.88 473,852.99 885,501.35
319,863.22 799,286.28 359,977.45 839,575.57 341,740.97 803,328.40
286,247.94 647,127.13 313,722.61 682,600.57 291,749.19 664,811.37
withstructural
craneway

withoutcraneway

withstructural
withstructural
withoutcraneway
craneway
craneway

withoutcraneway

776,063.47 1,121,861.64 783,307.07 1,129,000.26 787,781.33 1,120,463.28

2.)

STEELTRUSSWITHR.C.PILEFOUNDATION 653,216.06 1,012,739.22 673,826.45 1,032,259.06 663,876.25 1,008,833.18

3.)

STEELGIRDERWITHBOREDPILE
FOUNDATION

4.)

STEELGIRDERWITHR.C.PILEFOUNDATION 582,330.03 1,016,811.80 624,068.02 1,057,715.49 602,323.24 1,019,528.58

C.

CONCRETEFLYOVER
CONCRETEFLYOVER,PSCGTYPEIV,L
1.)
=30M/35MPERSPAN

II.REPLACEMENT/RECONSTRUCTION
1.)
RCDGIRDERBRIDGE
2.)
STEELBRIDGE

III.BRIDGEREPAIR
1.)

657,394.34 1,068,032.18 671,163.94 1,078,830.20 678,736.59 1,072,381.79

469,946.81

476,930.66

add15%totheNewConstructionofBridge
add15%totheNewConstructionofBridge

a. RetrofittingofSuperstucture
b. RetrofittingofSubstructureandSuperstucture

423,073.89

421,520.75

421,659.57

577,530.69

580,884.22

579,694.82
407,497.96

2.)

REPLACEMENTOFSUPERSTRUCTURE

406,226.70

407,558.30

3.)

REDECKING

213,795.02

217,360.64

478,883.79

BRIDGERETROFITTING

215,088.09

BRIDGESITECONDITION
ITEM

TYPEOFBRIDGESTRUCTURE

DRYORLOW

HIGHORDEEP

DRYORLOW

HIGHORDEEP

WATERLEVEL

WATERLEVEL

WATERLEVEL

WATERLEVEL WATERLEVEL WATERLEVEL

REGION X
I.NEWCONSTRUCTION
A.

B.

DRYORLOW

REGION XI

HIGHORDEEP

REGION XII

CONCRETEBRIDGESTRUCTURE
PSCGIRDERBRIDGEWITHBOREDPILE
1.)
FOUNDATION
PSCGIRDERBRIDGEWITHR.C.PILE
2.)
FOUNDATION
3.)
RCDGBRIDGEWITHR.C.PILEFOUNDATION
SINGLESPANRCDGBRIDGEWITHR.C.PILE
4.)
FOUNDATION

STEELBRIDGESTRUCTURE
STEELTRUSSWITHBOREDPILE
1.)
FOUNDATION

554,539.25 997,623.85 593,653.98 1,040,934.35 612,885.07 1,086,467.92


502,285.06 973,466.56 535,909.59 1,011,062.76 573,041.49 1,076,356.96
367,715.02 892,911.87 349,305.46 878,228.70 378,394.62 937,825.81
316,036.17 724,423.47 305,164.44 700,089.16 330,288.47 752,793.27
withstructural
craneway

withoutcraneway

withstructural
withstructural
withoutcraneway
craneway
craneway

withoutcraneway

787,695.21 1,169,036.50 796,411.62 1,180,849.18 802,250.97 1,210,048.28

2.)

STEELTRUSSWITHR.C.PILEFOUNDATION 680,123.55 1,074,244.14 672,305.06 1,070,103.20 689,192.05 1,109,897.77

3.)

STEELGIRDERWITHBOREDPILE
FOUNDATION

4.)

STEELGIRDERWITHR.C.PILEFOUNDATION 631,819.69 1,108,587.93 615,012.07 1,095,800.24 643,252.29 1,152,114.22

C.

683,459.63 1,132,870.64 672,127.21 1,125,793.85 682,441.46 1,162,355.63

CONCRETEFLYOVER
CONCRETEFLYOVER,PSCGTYPEIV,L
1.)
=30M/35MPERSPAN

484,976.94

546,332.35

549,996.12

II.REPLACEMENT/RECONSTRUCTION
1.)
RCDGIRDERBRIDGE
2.)
STEELBRIDGE

III.BRIDGEREPAIR
1.)

425,521.64

421,922.17

424,600.14

BRIDGERETROFITTING
a. RetrofittingofSuperstucture

b. RetrofittingofSubstructureandSuperstucture

add15%totheNewConstructionofBridge
add15%totheNewConstructionofBridge

585,068.00

588,389.85

587,248.59

2.)

REPLACEMENTOFSUPERSTRUCTURE

412,636.99

471,392.36

483,633.09

3.)

REDECKING

219,310.24

218,818.95

219,608.64

http://www.dpwh.gov.ph/infrastructure/infra_stat/ATLAS%202014/2014%20Atlas/table_2_3.htm

2/3

4/15/2016

Table2.3

ITEM

BRIDGESITECONDITION
DRYORLOW HIGHORDEEP

TYPEOFBRIDGESTRUCTURE

WATERLEVEL

WATERLEVEL

REGION XIII
I.NEWCONSTRUCTION
A.

B.

CONCRETEBRIDGESTRUCTURE
PSCGIRDERBRIDGEWITHBOREDPILE
1.)
FOUNDATION
PSCGIRDERBRIDGEWITHR.C.PILE
2.)
FOUNDATION
3.)
RCDGBRIDGEWITHR.C.PILEFOUNDATION
SINGLESPANRCDGBRIDGEWITHR.C.PILE
4.)
FOUNDATION


STEELBRIDGESTRUCTURE
STEELTRUSSWITHBOREDPILE
1.)
FOUNDATION

606,859.61 1,050,865.75

548,850.70 1,021,443.18

372,886.30 900,057.78

313,819.11 734,621.58

withstructural
craneway

withoutcraneway

796,490.42 1,179,599.09

2.)

STEELTRUSSWITHR.C.PILEFOUNDATION 681,820.56 1,076,826.32

3.)

STEELGIRDERWITHBOREDPILE
FOUNDATION

693,768.94 1,144,064.81

4.)

STEELGIRDERWITHR.C.PILEFOUNDATION 636,395.10 1,114,518.19

C.

CONCRETEFLYOVER
CONCRETEFLYOVER,PSCGTYPEIV,L
1.)
=30M/35MPERSPAN

II.REPLACEMENT/RECONSTRUCTION

1.)

RCDGIRDERBRIDGE

2.)

STEELBRIDGE

III.BRIDGEREPAIR
1.)

530,870.71

add15%totheNewConstructionof
Bridge

add15%totheNewConstructionof
Bridge

BRIDGERETROFITTING

a. RetrofittingofSuperstucture

b. RetrofittingofSubstructureandSuperstucture

424,571.90

587,652.93

2.)

REPLACEMENTOFSUPERSTRUCTURE

462,238.23

3.)

REDECKING

218,527.04

Note:

1.)
2.)

Thecostestimatehigh/deepwaterlevelconditionincludesStructuralSteelCraneway,StructuralSteelTPlatformandCofferdammingofthefooting
foundation.
CostofReplacement/Reconstructionworkmaybeincreasedby15%ofthenewconstructioncostduetoremovalofexistingbridgestructureand
provisionofdetourandtrafficmanagement.

3.)

Thepriceofconstructionmaterialsarebasedontheregionalaveragepricesplus15%markupforthehaulingcost(4thQuarterofCY2014),
equipmentratesarebasedfromthelatestACELRates(24thEdition)andlaborratesarebasedontheapprovedlaborrates(February2015).

4.)

TheestimatedunitcostwasderivedfromtheassumedtypicaldesignofBridgeStructureandmaybevarydependingontheactualdesign.

5.)

Theretrofittingworksisassumedtobedesignedusingglassfiberreinforcementongirders.

BackHomeUpNext

ForquestionsregardingthisWebsitecontactdpwh_feedback@yahoo.comortheDPWHCFMC.
Lastupdated:10/09/15.
bestviewedusingInternetExplorer10orFirefoxver.28

Disclaimer

http://www.dpwh.gov.ph/infrastructure/infra_stat/ATLAS%202014/2014%20Atlas/table_2_3.htm

3/3

You might also like