Design of Pilecap For Pc-2
Design of Pilecap For Pc-2
100
5
3.3
2.25
1400
tonnes
m
m
mm
Piles along
Length
L1,L2,L3
Row 1
L1:
0.725
m
2
Row 2
L2:
0
m
0
Row 3
L3:
0
m
0
L1,L2 and L3 is te distance column face to centre of pile row
Mu / bd2
Percentage of steel from SP16 for M25 concrete
Area of steel
145
t-m
64.44444
t-m/m
0.493197
0.2
28
cm2/m
Length
L4:
L5:
L6:
0
0
0
m
m
m
Piles along
L4,L5,L6
0
0
0
Mu / bd2
t-m
t-m/m
Area of steel
0.185
25.9
cm2/m
The critical section for shear is at d/2 from the face of column:
Shear considered at d/2 from face X-X:
Total number of piles contributing to shear
Shear force
70
31.11111
tonnes / m
Tv
0.333333
N/mm2
Vu / bd
tonnes
Pt
Ast
cm2/m
tonnes
tonnes / m
Tv
N/mm2
Vu / bd
0.2
0.34
N/mm2
-476
KN/m
-3.4
kN/cm/m
NX
(m)
0
NY
(m)
0
DEPTH OF SELF
PILECAP(mWEIGHT (T)
0
0
NX
(m)
0
NY
(m)
0
DEPTH OF SELF
PILECAP(mWEIGHT (T)
0
0
kN/cm/m