Istqb-Test 2
Istqb-Test 2
Q1 A deviation from the specified or expected behaviour that is visible to end-users is called:
a) an error
b) a fault
c) a failure
d) a defect
v) every week
w) after the software has changed
x) as often as possible
y) when the environment has changed
z) when the project manager says
Q3 IEEE 829 test plan documentation standard contains all of the following except
a) test items
b) test deliverables
c) test tasks
d) test specifications
Q5
Order numbers on a stock control system can range between 10000 and 99999 inclusive. Which
of the following inputs might be a result of designing tests for only valid equivalence classes and
valid boundaries?
Q9
Which of the following is the main purpose of the integration strategy for integration testing in the
small?
Read p
Read q
IF p+q > 100 THEN
Print "Large"
ENDIF
IF p > 50 THEN
Print "p Large"
ENDIF
a) requirements
b) documentation
c) test cases
d) improvements suggested by users
Q16 Which of the following items would not come under Configuration Management?
a) operating systems
b) test documentation
c) live data
d) user requirement documents
Q17 Maintenance testing is:
Q21 Given the following types of tool, which tools would typically be used by developers, and which by
an independent system test team?
i. static analysis
ii. performance testing
iii. test management
iv. dynamic analysis
a) developers would typically use i and iv; test team ii and iii
b) developers would typically use i and iii; test team ii and iv
c) developers would typically use ii and iv; test team i and iii
d) developers would typically use i, iii and iv; test team ii
a) black box test design techniques all have an associated test measurement technique
b) white box test design techniques all have an associated test measurement technique
c) cyclomatic complexity is not a test measurement technique
d) black box test measurement techniques all have an associated test design technique
Q25 A typical commercial test execution tool would be able to perform all of the following, EXCEPT:
a) re-testing ensures the original fault has been removed; regression testing looks for
unexpected side-effects
b) re-testing looks for unexpected side-effects; regression testing ensures the original fault has
been removed
c) re-testing is done after faults are fixed; regression testing is done earlier
d) re-testing is done by developers; regression testing is done by independent testers
Q28 What type of review requires formal entry and exit criteria, including metrics:
a) walkthrough
b) inspection
c) management review
d) post project review
a) component testing
b) non-functional system testing
c) user acceptance testing
d) maintenance testing
Q30 What is NOT included in typical costs for an inspection process?
Q32 Which expression best matches the following characteristics of the review processes:
s) inspection
t) peer review
u) informal review
v) walkthrough
a) s = 4 and 5, t = 3, u = 2, v = 1
b) s = 4, t = 3, u = 2 and 5, v = 1
c) s = 1 and 5, t = 3, u = 2, v = 4
d) s = 4 and 5, t = 1, u= 2, v = 3
a) ISO/IEC 12207
b) BS 7925-1
c) ANSI/IEEE 829
d) ANSI/IEEE 729
Q36 The cost of fixing a fault:
a) is not important
b) increases the later a fault is found
c) decreases the later a fault is found
d) can never be determined
Q37 Which of the following is NOT included in the Test Plan document of the Test Documentation
Standard?