0% found this document useful (0 votes)
17 views

Transportation Impact Study Technical Working Group (TISTWG) February 3, 2015 Meeting #13 MRO Auditorium 1:30-3:30 PM Agenda

The Transportation Impact Study Technical Working Group met to discuss transportation planning in Montgomery County. They reviewed the Planning Board's discussions on consolidating transportation tests and not moving forward with Bethesda's pro-rata share proposal. They also received updates on parallel efforts by MCDOT, SHA, and M-NCPPC. The group spent most of their time reviewing draft materials including comments on the Subdivision Staging Policy and LATR Guidelines. They discussed next steps and scheduled future meetings.

Uploaded by

Planning Docs
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views

Transportation Impact Study Technical Working Group (TISTWG) February 3, 2015 Meeting #13 MRO Auditorium 1:30-3:30 PM Agenda

The Transportation Impact Study Technical Working Group met to discuss transportation planning in Montgomery County. They reviewed the Planning Board's discussions on consolidating transportation tests and not moving forward with Bethesda's pro-rata share proposal. They also received updates on parallel efforts by MCDOT, SHA, and M-NCPPC. The group spent most of their time reviewing draft materials including comments on the Subdivision Staging Policy and LATR Guidelines. They discussed next steps and scheduled future meetings.

Uploaded by

Planning Docs
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Transportation Impact Study Technical Working Group (TISTWG)

February 3, 2015 Meeting #13


MRO Auditorium
1:30-3:30 PM
Agenda
1) Introductions (5 min)
2) Review of Planning Board explorations (25 min)
a) December 3 Planning Board discussion Bethesda pro-rata share not moving forward as
stakeholders have not expressed interest (in this case, if it aint broke)
b) January 14 Planning Board discussion consider alternatives for collapsing LATR, TPAR and
impact taxes into single test
c) February 4 Planning Board discussion continuation of January 14
3) Updates on parallel efforts (15 min)
a) MCDOT White Oak transportation analysis
b) SHA Transportation Study Guidelines
c) M-NCPPC Assessment of Modeling Tools/Measures/Metrics study
4) Draft materials for review (60 min) attachments transmitted under separate cover
a) Comments/responses matrix
b) Third (1/31) draft of Subdivision Staging Policy
c) Second (1/31) draft of LATR Guidelines
5) Next steps and tentative meetings schedule (15 min)
a) Updated schedule to be distributed at meeting

1
Prepared by Renaissance Planning Group
November 29, 2015

You might also like