0% found this document useful (0 votes)
727 views1 page

One-Line Diagram - BT (Load Flow Analysis) : Page 1 23:02:24 Apr 29, 2015 Project File: KANDIBATA

The document is a one-line diagram showing an electrical distribution network with various transmission lines, buses, transformers, and generators connected together. It includes transmission lines ranging from 20 kVA to 200 kVA connecting 51 buses across different voltage levels. There are 4 generators shown connected to the network, each rated at 5 MW, along with 5 transformers rated at 6 MVA. The diagram provides key information on the configuration and components of the electrical distribution system under analysis.

Uploaded by

khalatif8
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
727 views1 page

One-Line Diagram - BT (Load Flow Analysis) : Page 1 23:02:24 Apr 29, 2015 Project File: KANDIBATA

The document is a one-line diagram showing an electrical distribution network with various transmission lines, buses, transformers, and generators connected together. It includes transmission lines ranging from 20 kVA to 200 kVA connecting 51 buses across different voltage levels. There are 4 generators shown connected to the network, each rated at 5 MW, along with 5 transformers rated at 6 MVA. The diagram provides key information on the configuration and components of the electrical distribution system under analysis.

Uploaded by

khalatif8
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

One-Line Diagram - BT (Load Flow Analysis)

TP39-25
20 kVA
TP24-50
40 kVA

V
06 k

40 kVA17.9
Bus60
20 kV
0.04 MVA
0.04 MVA
TP24-1-50
TP34-25
20 kVA
Bus51
20 kV

1 kV

17.9 MVA
0.04

0.04 MVA
TP33-50
kV
0.5 MVA
914 kVA
.40
17MVA
0.5
0.07
MVA
Bus55
0.6
MVA
20 kV
V
13 k
17.9

20 kV
Bus52
0.5 MVA
500 kVA
PWTWRNAKAN 555

0.03 MVA
TP37-50
35 kVA
0.04 MVA
BTS3-50
40 kVA

ME0-50
40 kVA
0.07 MVA
0.1 MVA

TP16-160
75 kVA

0.2 MVA

Bus46
1 20
MVAkV
18.1

40 kVA
KJ66-25

V
32 k

KJ25-100
80 kVA
0.04 MVA

Bus45
TP15-160KJ35-25020 kV
140 kVA 200 kVA

0.1 MVA
KJ50-160
140 kVA

0.08 MVA
KJ88-100
80 kVA

BUS GI BERASTAGI

Cable8

Bus13
20 kV

20 kV
0.3 MVA

0.3 MVA

V
46 k
19.6

0.3 0MVA
MVA
0.04 MVA

KJ94-50
40 kVA

KJ59-50
40 kVA

kV
4KJ62-160
18.1 140 kVA
1 MVA
Bus70
20 kV
1.2 0.1
MVA MVA 40 kVA
KJ24-50
0.04 MVA
BTS2
40
kVA
0.04 MVA
KJ89-50
40 kVA
40 kVA
SE04-100
0.04 MVA
70 kVA
0.07 MVA
0.04 MVA
BTS-50
Bus33
kV
V
k
20 kV
.75
1.820MVA
Bus66
.66
1.620MVA
1.3 MVA
20 kV
0.2
MVA
1.8 MVA
MVA
0.07 MVA 0.07 MVA
0.1
MVA
0.07 MVA0.02
0.04
MVA
0.04 MVA
Open

KJ23-100
KJ22-160
70 kVA KJ56-25
KJ6-100 KJ105-100
23 kVA
70 kVA RK-25140 kVA
70 kVA
20 kVA
KJ73-50
40 kVA

0.04 MVA

0.04 MVA
0.04 MVA
40 kVA
ME3-50
0.07 MVA
70 kVA
KJ33-100
0.04 MVA
0.02 MVA
40 kVA 23 kVA
ME1-50 KJ36-25

2.2 MVA

40 kVA
KJ40-50

GH KANDIBATA
20 kV

2
9.36

GI BERASTAGI
3250 MVAsc

Cable1
24.7 MVA

FEEDER 2
3.98 MVA
FEEDER 3
3.74 MVA

4 MVA

4.9 MVA

kV
19.7

FEEDER 1
7.89 MVA

3.8 MVA

Cable9

Cable6

7.8 MVA

Open

Open
4 MVA

3.7 MVA

FEEDER 4
6.09 MVA

6.1 MVA

FEEDER 6
4.95 MVA

page 1

4.9 MVA
78
20.8

7 kV
20.9

Gen1
5 MW

T1
6 MVA

5.3 MVA

20 kV
Bus GEN-1

Cable4
5.1 MVA

Cable7

5.1 MVA

Cable5
5 MVA

7 kV
20.9

Gen2
5 MW

T3
6 MVA

5.3 MVA
Gen3
5 MW

5.1 MVA
T4
6 MVA

0 MVA
Gen4
5 MW
0 MVA

Cable14

Cable15
0 MVA

T5
6 MVA

Cable18
0 MVA

20 kV
Bus GEN-2

Cable13

5.1 MVA kV
20 kV
Bus GEN-3

Cable12
5 MVA

05
21.9

Cable16

Cable17

Cable19

Cable20

0 MVA
20 kV 21.9
Bus GEN-4

Open

V
05 k

0 MVA
Open

23:02:24

Apr 29, 2015

Project File: KANDIBATA

kV

kV

20 kV 1
Bus5

Cable3

Cable2

4.5 MVA

4.5 MVA
Lump1
4.57 MVA

You might also like