0% found this document useful (0 votes)
192 views

Inspection and Test Plan (ITP) (Pressure Vessel)

This 9-page document is an inspection and test plan for the pressure vessel and columns being installed at an upstream and downstream theme park project. It was prepared by MSET Engineering Corporation Sdn Bhd on February 24, 2013 for Petrofac E&C Sdn Bhd, and outlines the inspection and testing procedures to be followed during installation and commissioning to ensure quality standards are met.

Uploaded by

hannan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
192 views

Inspection and Test Plan (ITP) (Pressure Vessel)

This 9-page document is an inspection and test plan for the pressure vessel and columns being installed at an upstream and downstream theme park project. It was prepared by MSET Engineering Corporation Sdn Bhd on February 24, 2013 for Petrofac E&C Sdn Bhd, and outlines the inspection and testing procedures to be followed during installation and commissioning to ensure quality standards are met.

Uploaded by

hannan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

MSET ENGINEERING CORPORATION SDN BHD

DOCUMENT TITLE: INSPECTION AND TEST


PLAN

DATE: 24.02.2013

DOC. REF. NO.: MSETe/M2-226a/ITP-001

REVISION: 0

SUBJECT: INSPECTION AND TEST PLAN (ITP)

JOB NO: M2-226a


PAGE: 1 of 9

INSPECTION AND TEST PLAN


(ITP)
(PRESSURE VESSEL)
PROJECT NAME:

UPSTREAM AND DOWNSTREAM


THEME PARK AT INSTEP
(PRESSURE VESSEL & COLUMNS)

OWNER:
PETROFAC E&C SDN. BHD.

0
Rev.
No.

24.02.2013

Issued for Approval

Date

Description of Revision

Wan Nafiza
Prepared
by

Raja Yahya
Reviewed
by

Azizan Ariffin
Approved
by