1 220 MM TK Common Brick Work: Description Unit Qty Item No

The document provides cost estimates for two construction projects involving brick work, plastering, and painting of walls. For the first case using common brick, the total cost per square meter is 3,090.91. For the second case using wire-cut brick, the total cost per square meter is 3,014.73. The document lists materials, labor, and rates to calculate costs for each item and the overall costs per square meter for the two wall construction cases.

Uploaded by

chanakawid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views4 pages

1 220 MM TK Common Brick Work: Description Unit Qty Item No

The document provides cost estimates for two construction projects involving brick work, plastering, and painting of walls. For the first case using common brick, the total cost per square meter is 3,090.91. For the second case using wire-cut brick, the total cost per square meter is 3,014.73. The document lists materials, labor, and rates to calculate costs for each item and the overall costs per square meter for the two wall construction cases.

Uploaded by

chanakawid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Item

Description
No.
1 220 mm tk Common Brick Work
Brick work in 1:6 cement
sand motar in 220mm thick walls in
ground floor .(10m2)

Unit

Qty

Labour days
Un /Sk.
Sk
Tools
Scaffoldings
Bricks (1000)
Sand (1m3)
Cement (50Kg)

Days
Days
%/100
%/100
Nr.
Cu.m
Bags

4.05
2.40
0.03
0.03
1.25
0.60
3.25

Labour days
Un /Sk.
Sk
Tools
Scaffoldings
Sand (1m3)
Cement (50Kg)
Salked lime (50Kg)

Days
Days
%/100
%/100
Cu.m
Bags
Bags

1.61
1.61
0.03
0.03
0.21
0.86
0.65

Labour days
Spe. Sk
Scaffolding
Emulsion Paint

Days
%/100
lt

0.81
0.03
1.51

Spe. Sk
Scaffolding
Weather shield

Days
%/100
lt

0.81
0.03
1.51

Internal and external platering

16mm thick to walls in lime


cement & sand 1:1:5 finished smooth with
lime putty floating. (10m2)

Exyernally (90% of Internal)


Painting
Internally Emulsion
Painting walls with emulsion paint (2
coats ) (10m2)

Externally weather shield

Cost per one Sq.m in First case

Item
Description
No.
1 220 mm tk Wire-Cut Brick Work
Brick work in 1:6 cement
sand motar in 220mm thick walls in
ground floor .(10m2)

Unit

Qty

Labour days
Un /Sk.
Sk
Tools
Scaffoldings
Bricks (1000)
Sand (1m3)
Cement (50Kg)

Days
Days
%/100
%/100
Nr.
Cu.m
Bags

Labour days
Un /Sk.
Sk
Tools
Scaffoldings
Sand (1m3)
Cement (50Kg)
Salked lime (50Kg)

Days
Days
%/100
%/100
Cu.m
Bags
Bags

Labour days
Spe. Sk
Scaffolding
Emulsion Paint

Days
%/100
lt

0.81
0.03
1.51

Spe. Sk
Scaffolding
Weather shield

Days
%/100
lt

0.81
0.03
1.51

4.05
2.40
0.03
0.03
1.20
0.55
2.70

Internal and external platering


Internally
16mm thick to walls in lime
cement & sand 1:1:5 finished smooth with
lime putty floating. (10m2)

1.61
1.61
0.03
0.03
0.21
0.86
0.65

Painting
Internally Emulsion
Painting walls with emulsion paint (2
coats ) (10m2)

Externally weather shield

Cost per one Sq.m in Second case

Rate

700.00
1,000.00
5,235.00
5,235.00
6,800.00
3,000.00
700.00

Amount

2,835.00
2,400.00
157.05
157.05
8,500.00
1,800.00
2,275.00

3,090.91

700.00
1,000.00
2,737.00
2,737.00
3,000.00
700.00
678.00

1,127.00
1,610.00
82.11
82.11
630.00
602.00
440.70
4,116.53

1,200.00
1,200.00
412.00

972.00
36.00
622.12

1,200.00
1,200.00
460.00

972.00
36.00
694.60

3,014.73

Rate

Amount

700.00
1,000.00
5,235.00
5,235.00
9,880.00
3,000.00
700.00

2,835.00
2,400.00
157.05
157.05
11,856.00
1,650.00
1,890.00

700.00
1,000.00
2,737.00
2,737.00
3,000.00
700.00
678.00

1,127.00
1,610.00
82.11
82.11
630.00
602.00
440.70

1,200.00
1,200.00
412.00

972.00
36.00
622.12

2,714.91