100% found this document useful (3 votes)
6K views4 pages

Earthwork Rates

The document provides rates and pricing information for various site preparation and earthworks items in multiple locations across Malaysia. It includes excavation rates ranging from RM0.75 to RM50 per cubic meter depending on depth and material. Filling rates range from RM2 to RM35,000 based on material used and thickness. Clearing and grubbing rates vary between RM1.50 to RM19,000 per square meter depending on the extent of vegetation removal required. Contact information is provided for any questions about the rates listed.

Uploaded by

Mezz Hans
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
6K views4 pages

Earthwork Rates

The document provides rates and pricing information for various site preparation and earthworks items in multiple locations across Malaysia. It includes excavation rates ranging from RM0.75 to RM50 per cubic meter depending on depth and material. Filling rates range from RM2 to RM35,000 based on material used and thickness. Clearing and grubbing rates vary between RM1.50 to RM19,000 per square meter depending on the extent of vegetation removal required. Contact information is provided for any questions about the rates listed.

Uploaded by

Mezz Hans
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Portal RATOL & Rates PreMo

CAWANGAN KONTRAK DAN UKUR BAHAN 30.09.2015

Work Item

Unit

SITE PREPARATION AND EARTHWORK


EXCAVATION AND EARTHWORK
EXCAVATION
Excavating to reduce level
Maximum depth not exceeding 1.00m

m3

SITE PREPARATION AND EARTHWORK


EXCAVATION AND EARTHWORK
SITE PREPARATION
Clearing undergrowth
Clearing site of undergrowth, bushes, scrub and the
like

m2

SITE PREPARATION AND EARTHWORK


EXCAVATION AND EARTHWORK
EXCAVATION
Excavating to reduce level
Maximum depth not exceeding 0.25m

m3

SITE PREPARATION AND EARTHWORK


EXCAVATION AND EARTHWORK
FILLING
Material arising from excavation
Filling to excavation

m3

SITE PREPARATION AND EARTHWORK


EXCAVATION AND EARTHWORK
DISPOSAL OF WATER
Surface water
Keeping the surface of the site and the excavations
free from surface water

Item

SITE PREPARATION AND EARTHWORK


EXCAVATION AND EARTHWORK
DISPOSAL OF EXCAVATED MATERIAL
Disposal off site
Removing from site; location at contractor's discretion
including provision of a shoot, dump, payment for

m3

Overall Average (RM)


Location

Range (RM)

Average (RM)

10.00 - 10.00

10.00

Location

Range (RM)

Average (RM)

5.00 - 5000.00

2502.50

0.50 - 1.00

0.75

1.00 - 2.70

1.85

2.00 - 2.00

2.00

2.00 - 3.00

2.67

Location

Range (RM)

Average (RM)

3.00 - 3.00

3.00

4.00 - 4.00

4.00

Location

Range (RM)

Average (RM)

10.00 - 10.00

10.00

10.00 - 18.00

15.33

Location

Range (RM)

Average (RM)

5000.00 - 10500.00

9125.00

500.00 - 3000.00

1500.00

Location

Range (RM)

Average (RM)

RM 10.00

RM 501.95

RM 3.50

RM 12.67

RM 5312.50

RM 8.75

1/4

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 30.09.2015

Work Item

Unit

royalties, fees, levies and other charges

SITE PREPARATION AND EARTHWORK


EXCAVATION AND EARTHWORK
EXCAVATION
Excavating to reduce level
EXTRA OVER; excavating in rock met with in
excavations of such size or position by using wedges,
lever, special plant, explosive or chemicals

m3

SITE PREPARATION AND EARTHWORK


EXCAVATION AND EARTHWORK
FILLING
Material arising from excavation
To make up levels over 250mm thick

m3

SITE PREPARATION AND EARTHWORK


EXCAVATION AND EARTHWORK
SITE PREPARATION
Clearing site; Alternatif method of measurement
Clear all vegetation, trees irrespective of girth, etc., all
buildings, structures or other obstructions which
interfere with the execution of the work and remove all
debris off site; area approximately 1 hectares as per
drawing

Item

SITE PREPARATION AND EARTHWORK


EXCAVATION AND EARTHWORK
DISPOSAL OF WATER
Ground water
Keeping the excavations free from ground water

Item

SITE PREPARATION AND EARTHWORK


EXCAVATION AND EARTHWORK
FILLING

m3

Overall Average (RM)


B

12.00 - 12.00

12.00

5.00 - 5.00

5.00

10.00 - 10.00

10.00

8.00 - 8.00

8.00

Location

Range (RM)

Average (RM)

50.00 - 50.00

50.00

5.00 - 5.00

5.00

Location

Range (RM)

Average (RM)

1.00 - 3.50

2.25

19.00 - 19.00

19.00

Location

Range (RM)

Average (RM)

5000.00 - 10000.00

7187.50

7000.00 - 125000.00

66000.00

1500.00 - 50000.00

23900.00

16000.00 - 16000.00

16000.00

90000.00 - 90000.00

90000.00

8000.00 - 10000.00

9333.33

Location

Range (RM)

Average (RM)

600.00 - 10000.00

3866.67

500.00 - 2000.00

1166.67

Location

Range (RM)

Average (RM)

RM 27.50

RM 10.63

RM 35403.47

RM 2516.67

RM 2.78

2/4

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 30.09.2015

Work Item

Unit

Material arising from excavation to be selected and


treated
Filling to excavation
SITE PREPARATION AND EARTHWORK
EXCAVATION AND EARTHWORK
EXCAVATION
Excavating to reduce level
Maximum depth exceeding 4.00m but not exceeding
6.00m

m3

Overall Average (RM)


A

2.00 - 2.00

2.00

2.00 - 3.00

2.33

4.00 - 4.00

4.00

Location

Range (RM)

Average (RM)

7.00 - 7.00

7.00

RM 7.00

3/4

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 30.09.2015

Nota
Sekiranya anda mempunyai sebarang pertanyaan, sila hubungi:
Ketua Penolong Pengarah Kanan
Bahagian Perolehan dan Khidmat Kos
Cawangan Kontrak dan Ukur Bahan
Ibu Pejabat JKR Malaysia
Tingkat 19, Menara Tun Ismail Mohamed Ali
No 25, Jalan Raja Laut
50582 Kuala Lumpur

Catatan

u.p: En Husnan Husin


Tel: 03-26161111
Email: [email protected]

4/4

You might also like