100% found this document useful (1 vote)
327 views17 pages

Summary of MEP Planning Manual

Hope it helps!
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
100% found this document useful (1 vote)
327 views17 pages

Summary of MEP Planning Manual

Hope it helps!
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 17
MEP PLANNING MANUAL, PREFACE OF THE FIR: EDITION Now a day in fast track jobs it’s very important to prepare the detailed and realistic program to achieve the project completion date. As we are aware that MEP acti ies are very important for successful timely completion of project. We have experienced in our practical life that most of the projects are delayed because of delay in material delivery, installation, testing & commissioning of ‘major MEP activities. ‘This Mechanical, Electrical and Plumbing (MEP) Planning Manual, has been prepared to highlight all MEP related detailed activities for a typical multistoried tower and villa, In this edition the ‘major concern is to identify the major fields and sequence of activities required to be implemented in order to render the completion of various services to successful operation. ‘This manual is divided into two parts i.e, Part-1 + MEP Activity Details Part-II + MEP Method Statement ‘The main purpose of this MEP Planning Manual is to prepare a program of works with detailed acti 's for all MEP works integrated with thin the main civil program. ‘This manual has been prepared by HEE MEP Planning Engineer Mr. Gulshan Kumar, reviewed by HEE Planning Manager Mr. Jafar M. Khair. ‘This manual will be review periodically as required for adjustment and enhancement, sara SECTION 1d 12 13 14 15 16 17 18 19 1.10 SECTION 2 21 2.2 23 24 SECTION 3 31 32 33 34 SECTION 4 4d 42 43 44 45 SECTION 5 Sd SECTION 6 61 Table of Contents Part-I Activity Details MEP CONSTRUCTION ACTIVITIES LIST... Project Milestones Requirements. Plumbing System Activities. Fire Fighting System Activities. Air Conditioning System Activities. Electrical System Activities. Mechanical Floor / Roof Activities. Testing and Commissioning Activitis- Electrical Testing and Commissioning Activties-Plumbing.... Testing and Commissioning Activtiex-Fire Fighting Testing and Commissioning Actvites-HVAC. MEP ACTIVITY FLOW DIAGRAM. LHIVAC Activities Flow Diagram... Electrical Activities Flow Diagram. Plumbing Activities Flow Diagram. Fire Fighting Activites Flow Diagram. MEP AND CIVIL ACTIVITY INTERFACE-GRAPHICAL 10.25 LHIVAC and Civil Activities Interface Chart o..vovseserntsnvenoeoe-26 Electrical and Civil Activities Interface Chart 26 Plumbing and Civil Activities Interface Chart. 2 Fire Fighting and Civil Activities Interface Chart 27 MEP AND CIVIL ACTIVITY INTERFACE-TABULAR.. Key and Civil Activities Integface Chart... Plumbing and Civil Activities Interface Chart Fire Fighting and Civil Activities Interface Chart HYVAC and Civil Activities Interface Chart Electrical and Civil Activities Interface Chart. MEP ACTIVITIES PRODUCTION RATE. Mechanical Activities Production Rate... MATERIAL PROCUREMENT. Materia! Submittal, Approval, Procurement & Delivery Schedule... — SECTION7 —: DEWA REGULATIONS. 7.1 + Original DEWA Cavalogue for Electrical Installations... 41 42 SECTIONS — : DUBAI CIVIL DEFENCE REGULATIONS... sara SECTION 9 9.1 9.2 93 94 95 9.6 97 9.8 9.9 9.10 SECTION 10: 10.1 10.2 10.3 104 10.5 10.6 10.7 10.8 10.9 SECTIONIL: Md M2 13 Te 1S 11.6 Table of Contents Part-II Method Statements METHOD STATEMENT FOR ELECTRICAL INSTALLATION.. Installation of PVC Conduits Concealed iim Concrete Slab & Columns. G1 & PVC Conduit on Surface. Cable Tray & Ladders. Cable Trunking Syscem. Installation of Earthing System... Installation of Light Protection System. Pulling & Testing of Electrical Wires Commissioning Managements: Bus Bar Trunking System. Building Management System (BMS) METHOD STATEMENT FOR MECHANICAL (HVAC) INSTALLATIO. Installation of HVAC Ductwork... Installation & Insulation of Spiral Round Ducting and Duct Accesories Installation, Tsing & Insulation of Chilled Water Stem... Installation of Fan Coil Unit (FU). Installation of Fans. Installation of Chilled Water Pumps. Installation of Air Handling Units (AHU). HIVAC Testing, Adjusting & Balancing o Flashing & Chemical Treatment of Chilled Water System METHOD STATEMENT FOR PLUMBING INSTALLATION.. Concealed Drainage Piping Abore Ground Drainage Piping. Domestic Hot & Cold Water Supply Piping. Installation of Water Heaters. Installation of Domestic Water Supply Pumps. Installation of Sanitary Fixtures 101 105 110 113 17 121 125 129 sara SECTIONI2—: 12.1 12.2 123 124 12.5 12.6 127 METHOD STATEMENT FOR FIRE FIGHTING INSTALLATION.. 166 Installation of Fire Fighting Pipes & Fittings. 167 Installation of SprinBers. 172 Installation of Fire Hose Cabinets 176 Hydro-Static Testing of Sprinkler. Fire Alarm System. i Insallation of Zone Control Valve... Bee eeeeaeatAe Ingalacion of Pressure Reducing Vale Station. 193 MEP PLANNING MANUAL, MEP PLANNING MANUAL (PART -1) A Guide to the Project Planning & Installation related to MEP Works First Edition (Feb, 2007) MEP PLANNING MANUAL, SCOPE OF MEP WORKS ‘The MEP (Mechanical, Electrical & Plumbing) works is mainly divided into the following main categories: © Mechanicali: ‘The Mechanical installations mainly cover HVAC works. © Blectrical:- ‘The Electrical Installations is covering all electrical works, fire alarm system, telephone system, BMS, low voltage system, © Plumbing: ‘The Plumbing Installations is covering drainage system, water supply distributions, sanitary ware installations and related works, «Fire Fighting Systemi= ‘The fire fighting system is covering sprinkler system, fire fighting equipments, clean agent FM200 system, etc [Dacimchau7 | «=| MEP PLANNING MANUAL, SECTION 1 MEP ACTIVITY LIST This covers all the MEP activities in detail, describing Ist 2nd & final fix, Each activity has been given an individual code number. This code number can be used as a basic reference code while preparing the MEP Program. The first two digit of activity code is representing the system:- KY : Project Milestones PL. : Plumbing System FF : Fire Fighting System AC : HVAC System EL : Electrical System Each service has separate activity lists i.e. plumbing, fire fighting, electrical, HVAC. In the last column you will find the relevant method statement reference no. for the particular activity, Refer these method statements to know more detail about the activity installation procedures, quality of work, safety requirement implementation and resources (material, equipment & personnel), MEP PLANNING MANUAL, ‘Type Area | Code Description KY.01 | Temporary Power Availability KY-02 | Drainage Connection KY-03 | Water Availability Milestones | Tower | KY-04 | Civil Defense Inspection KY-05 | Authority Inspection (Electrical) KY-06 | Permanent Power Availability Ky.07 _| illed Water Availabilty (from District Cooling Plant) MEP PLANNING MANUAL, Type Code Description Underground PL-O1 Underground Piping Embedded in Concrete PL-02 PL-03 Putting sleeves in conerete slab Embedded pipe in concrete slab Ist Fix PL.OF ‘Cutting & Chasing in block walls PL.05 Putting Pipes (water supply / drainage) in block walls 2nd Fix PL-06 Horizontal Drainage Pipin PL-07 Horizontal Water Supply Piping PL-08 PL-09 PL10 Drainage Pipe Water Leakage Testing ‘Water Supply Water Leakage Testing Vertical (Riser) Drainage Piping PL-it Vertical (Riser) Water Supply Piping PL-12 PL-13 Floor Drain (Trap) Fixing ‘Water Heater Tasallation PL-lt Bath Tub / Shower Tray Installation Basement / Mech, Floor / Roof, PLAS amp Installation & Pipi Water Transfer Pump Installation & Pipin; PLZ Water Booster Pump Installation & Piping PLAS Erection of Water Tank & Connections i Typ. Final Fix ae PL-19 Sanitary Ware Installation PL-20 Sanitary Fixture Fixing PL-21 "Water Meter Fixing Testing & Pre- Cosuinint acing | 1 PL-22 Pre commission water transfer & Booster pumps PL23 Pre commission floor water heaters PL.24 ‘Overhead Roof Water Tank fillup PL.25 Flushing & checking Teaks in WS pipes PL-26 Flushing & checking leaks in drainage pipes PL27 Simultaneous flow test on drainage risers Commissioning & Handover | TT PL-28 ‘Test and commission water transfer & booster pumps PL.29 ‘Commissioning water supply PRV’s PL-30 ‘Commissioning floor water heaters PL-31 ‘Commissioning of bath tubs & sanitary ware 10 MEP PLANNING MANUAL, Type Code Description Ise Fix Tee,_| FRON | Fire Fighting Hangers & Supports FF.02 | Fire Fighting Pipin Typ. | FF-03 | Fire Fighting Pipe Riser Floor | FF-04 | Fire Fighting Pipe Testing 2nd Fix FF-05 | Fire Fighting Accessories Fixin Basement | FF-06 | Fire Pump Set Installation / Nee | r5.07 | Fire Pump Set Pipe Connections Typ. | FF-08 | Sprinkler Fixing Floor | FF-09 | Fire Hose Cabinet Fixin Final Fix FF-10 | Fire Hose Reel Fixing FF-11 | Fire Extinguisher Fixing FF-12 | Fire Blanket Fixin Testing &Pre= |p| BF-13 | Pressurize Fire Fighting pipes Commissioning | 1°" | FRAT4 | Flushing & Refilling of Fire Fighting Pipes pa FF-15 | Commissioning Fire Fighting PRV’s ommisioning | Tower [FIG | Cominisioning of FC's FF-17 | Commissioning of Sprinklers u MEP PLANNING MANUAL, Description ACOL Duct hangers & Supports AC-O2 Chilled Water Pipe Hangers & Supports 2nd Fix AC-03 Ducting Supply, return, Fresh & Exhaust AC OF AC05 Volume, Fire & Smoke Damper Fixing Duet Risers AC-06 Duct Insulation AC.O7 Chilled Water Piping AC-08 Chilled Water Pipe Riser AC-09 AC-10 ACI Chilled Water Pipe Test Chilled Water Pipe Insulation FCU Installation AC-I2 ‘Duct Connection to FCU ACIS Pipe Connection to FCU AC I4 Bends, Droppers & Mouth Piece Basement / Mech, Floor ACTS Chillers Installation ACI6 Heat Exchanger Installation ACIT Staircase Pressure Fan Installation ACIS Garbage Exhaust Fan Installation ACAI Chilled Water Pump Installation AC20 Expansion Tank & Pressure Unit Installation AC21 Air Scrubbers installation AC22 (Chemical Dozing Plant Installation AC23 AC24 ‘AHU Installation Duet Connection to AHU ACIS Pipe Connection to AHU Typ. Final ix | IP. AC-26 AC27 Kitchen Exhaust Fan Fixing Ceiling Diffuser Fixing AC28 Grille & Linear Fixing AC29 “Thermostat Fixing ‘Testing & Pre- Commissioning | T°“ AC30 Pre commissioning chilled water pumps AC3I ‘Water circulation in system and drain (Static) AC32 AC33 AC Girculation of water with cleaning chemical Pre commissioning FAHU's Cleaning of all filters and strainers AC35 re commissioning pressurization fans AC 36 AC37 ‘Water circulation in system and drain (dynamic) Refilling of water and witness by Engineer AC38 Prelim, Adjusting and balancing of valves 2 MEP PLANNING MANUAL, Type D Commissioning & Handover Tower “Test and commission chilled water pumps “Test and commission heat exchangers “Test and commission FAHU’s “Test and commission floor FCU’s FAHU air balancing Air balancing supply & return grilles FCU water balancing Balancing air from pressurization fans ‘Water balancing of FAHU’s ‘Main System Valves adjustment 13 MEP PLANNING MANUAL, ‘Description ELO1 Embedded Conduits in Concrete EL02 EL03 “Marking on Block walls ‘Cutting & Chasing in block walls EL-0+ Fix Conduits, GI Boxes in Block Walls Floor 2nd Fix ELS EL-06 ELO7 GL & PVS Surface Conduiting Installation of Distribution Boards| Installation of Sub-Main Boards EL-08 Tnstallation of Main LV Panel EL-09 Erect Cable Trays EL-10 Cable Truckin; EL-IL Farthing System EL-A2 LY Cabling EL-13 ELV Cabling EL-I4 ‘Main LV Cable Termination ELIS EL-16 Sub main Cable Termination ‘Wiring for Lighting & Small Power EL-17 ELS Wiring for ELV System ‘Wiring for Fire Fighting System EL-19 EL20 Circuit Continuity Test Ceiling Rose & exible Drops EL2I Distribution Boards Dressing EL22 Bus bar Installation EL-23 Lightning Protection System Basement EL-24 ‘Transformer Installation EL25 Generator Installation EL26 ‘ATS Panel Installation. EL27 LV Cabling from Transformer to LV Panel is Typ. Final Fix Pie EL28 Fixing Fire Alarm & Light Fittings EL-29 Fixing Switches, Sockets & Accessories Testing & Pre- Commissioning | TOV EL30 Gircuit continuity test by bus riser EL3I Continuity test LV wirin EL32 Pre commissioning ELV fixtures EL33 Final test and commissioning bus risers Tower EL-34 ‘Test and commission variable frequency drive EL35 Tighting protection earth resistance test EL-36 Floor MDB, SMDB, MCC panel commissionin, EL37 EL38 “Test and commission light fixtures “Test and commission ELV final fixtures 14 MEP PLANNING MANUAL, MECHANICAL FLOOR / ROOF ACTIVITIES Activity Description Chillers Installation 2 | Heat Exchanger Installation 3. | Staircase Pressure Fan Installation 4 | Garbage Exhaust Fan Installation 5 _| Cilled Water Pump Installation 6 | Expansion Tank & Pressure Unit Installation 7 _| Air Scrubbers installation 8 | Chemical Dozing Plant Installation 9 | AHU Installation 10 | FCU Installation 11 | MCC Installation 12 | Booster Pump Installation 13. | Water Tank Installation 18 MEP PLANNING MANUAL, LIST OF TESTING AND COMMISSIONING ACTIVITIES ELECTRICAL Sr.No. Activity Description 1 | Gireuit continuity test by bus riser 2 | Continuity test LV wiring 3 | Insulation resistance test (cabling) 4 | Pre commissioning ELV fixtures 5 | Final test and commissioning bus risers __ | Testand commission variable frequency drive 7 | Lighting protection earth resistance test 8 | Floor MDB, SMDB, MCC panel commissioning 9 | Test and commission light fixtures 10 | Test and commission ELV final fixtures MEP PLANNING MANUAL, LIST OF TESTING AND COMMISSIONING ACTIVITIES PLUMBING Sr.No. Activity Description 1 | Pre commission water transfer & Booster pumps 2 | Pre commission floor water heaters 3 | Overhead Roof Water Tank fillip 4 | Flushing & checking leaks in WS pipes § _| Flushing & checking leaks in drainage pipes 6 | Simultaneous flow test on drainage risers 7 | Test and commission water transfer & booster pumps 8 | Commissioning water supply PRV’s 9 | Commissioning floor water heaters 10 Commissioning of bath tubs & sanitary ware