The down time report for February 2010 from a bottling plant shows: - The total downtime was 1823 minutes. - The top three causes were filler and crowner problems at 30.12%, bottle delay from warehouse at 20.13%, and contract labor problems at 17.66% respectively. - Together these top three issues accounted for over 67% of the total downtime. - Other issues included conveyor problems, caser problems, syrup feeding pump problems and various other mechanical and technical faults.

Uploaded by

vaboopathy
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
91 views

Down Time Analysis

The down time report for February 2010 from a bottling plant shows: - The total downtime was 1823 minutes. - The top three causes were filler and crowner problems at 30.12%, bottle delay from warehouse at 20.13%, and contract labor problems at 17.66% respectively. - Together these top three issues accounted for over 67% of the total downtime. - Other issues included conveyor problems, caser problems, syrup feeding pump problems and various other mechanical and technical faults.

Uploaded by

vaboopathy
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 6

DOWN TIME REPORT - Feb 2010

S.No Particulars
1 Filler &Crowner Problem
2 Bottle delay from B/W
3 Contract labour problem
4 Conveyor
5 Caser problem
6 Syrup feeding pump problem
7 power problem
8 Air problem
9 Water Line Problem
10 Valve correction
11 Change over

Classified - Internal use


PORT - Feb 2010
Total Contrib
(Min) % Breakdown ution
549 30.12 30.12
367 20.13 50.25
322 17.66 67.91
200 10.97 78.88
184 10.09 88.97
65 3.57 92.54
62 3.40 95.94
25 1.37 97.31
23 1.26 98.57
14 0.77 99.34
12 0.66 100.00

1823 100.00 899.84

Classified - Internal use


120.00

100.00 10

88.97
80.00 78.88

67.91
60.00
50.25

40.00
30.12
20.13 17.66
20.00
10.97 10.09
3.40 1.37 1.26 0.77 0.66
0.00
lem W em or lem lem lem lem lem tio
n
ve
r
ob B/ bl vey b b b b b c o
r m r o n ro pr
o ro ro Pr
o re ng
e
rP f ro rp Co rp p rp irp e cor a
e u e e h
n
ela
y o
Ca
s m w A Lin alv
e C
ro
w ab pu po er
C led ctl in
g at V
& tt ra ed W
li er
l Bo o nt fe
F C p
y ru
S

Maaza down time Feb-10

power problem Air problem


3% 1%
Syrup feeding pump problem WaterProblem
Line Problem
4% Filler &Crowner
30% 1%
Caser problem
10% Valve correction
1%
Conveyor
11% Change over
1%
Contract labour problem
18%
Bottle delay from B/W
20%
18%
Bottle delay from B/W
20%
100.00

Colum
nG

1.26 0.77 0.66

n r
em tio ve
bl c o
r o r re ge
co han
lve C
Va

Air problem
1%
Problem
em
%
lve correction
1%
Change over
1%

m B/W
m B/W