Npi Gant

The document contains a Gantt chart that outlines the tasks, start and end dates, and duration of a project. The project involves four phases - concept, development, detailing, and prototyping. The concept phase includes concept rendering and form study models from July 1st to August 28th. The development phase includes proof of concept models and mock-ups from August 28th to September 5th. The detailing phase includes 3D modeling, drawings, specifications from September 6th to November 15th. The prototyping phase includes building functional prototypes and testing from November 15th to the end of the project.

Uploaded by

srave_k07
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views

Npi Gant

The document contains a Gantt chart that outlines the tasks, start and end dates, and duration of a project. The project involves four phases - concept, development, detailing, and prototyping. The concept phase includes concept rendering and form study models from July 1st to August 28th. The development phase includes proof of concept models and mock-ups from August 28th to September 5th. The detailing phase includes 3D modeling, drawings, specifications from September 6th to November 15th. The prototyping phase includes building functional prototypes and testing from November 15th to the end of the project.

Uploaded by

srave_k07
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Gantt Chart_x000D_

Task Name

Start

End

7/1
7/16
8/24

7/15
8/22
8/28

8/28
9/2

9/2
9/5

9/6
10/17
10/23
10/26
11/2
11/4
11/10
11/15

10/16
10/23
10/26
11/2
11/4
11/10
11/15
11/30

Concept Phase

15 Concept Rendering (Raw)


10 Concept Rendering (Final)
7 Form Study Models
Development Phase

7 Proof of concept models


5 Mock-ups
Detailing Phase

75 3D CAD Models
12 Assembly Drgs
5 BOM
8 Fabrication Drgs
2 Specification of Standard items
7 Packaging Design
5 Graphic Design
30 Analysis & Reliabilty Predictions
Prototyping Phase

40 Functional Prototypes
25 Testing & Reliability
Manufacturing Support

45 Tooling & Fixture Design


17 First off Parts
25 Production Parts
15 Service & User Manual
355

Gantt Chart_x000D_

118

Gantt Ch

Duration (days)
15
7
5

Concept Rendering (Raw)


Concept Rendering (Final)
Form Study Models

5
2

Development Phase
Proof of concept models
Mock-ups

40
6
3

Detailing Phase
3D CAD Models

7
2
6
5
15

Assembly Drgs
BOM

Gantt Chart_x000D_

Gantt Chart Template for Excel

Gantt Chart_x000D_

Gantt Chart_x000D_

Gantt Chart_x000D_

Gantt Chart_x000D_