The document is a letter from a plant general manager to Asec Automation requesting a quote to upgrade their outdated PCS7 V6.1 control system and CEMAT V6.1 software to the latest versions. The upgrade is needed due to limitations in the old system and an expiring runtime license. The plant requests the quote include technical details of the required upgrade packages, hardware that needs upgrading, and expected downtime. Site visits are offered to review the existing system.
Download as DOC, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
113 views
PCS7 Upgrade
The document is a letter from a plant general manager to Asec Automation requesting a quote to upgrade their outdated PCS7 V6.1 control system and CEMAT V6.1 software to the latest versions. The upgrade is needed due to limitations in the old system and an expiring runtime license. The plant requests the quote include technical details of the required upgrade packages, hardware that needs upgrading, and expected downtime. Site visits are offered to review the existing system.
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1
Date : 5 April 2015,
To
: Asec Automation.
Attn
: Dr. Eng. Lahcen Abellaoui.
Cc
: Eng. Ahmed Raafat.
Subject
: Upgrading Our PCS7 Control System.
Dear Dr. Lahcen,
Due to the various limitations in our outdated control system (SIMATIC PCS7 V6.1 with CEMAT V6.1), and due to the expiry of its runtime license, we are interested in migrating it to the latest reliable trusted version of PCS7 & CEMAT software with a new runtime license. We will entrust this upgrading to who is interested and is well trusted for fulfilling this project in a professional way with the minimum downtime period, due to the known operation restrictions. If you are interested, kindly submit your quotation including technical and financial details to us. It will be very appreciated if the technical offer will include details of the required upgrade software packages, the hardware components entitled for upgrade (if any), and the expected down time of the system during this upgrade procedures. All your questions about any further details are most welcomed; also specialists site visits to review our existing system will be facilitated. Your soonest reply will be very much appreciated. Best regards.