METHOD STATEMENT
1.0 OBJECTIVE
The purpose of this method statement is to describe the activities and methods,
which will be used to carry out the placing of subbase and roadbase
2.1.2 The material shall be placed over the full width of the formation to
the required thickness as shown in the drawings in one layer or
more, each layer not exceeding 200mm compacted thickness.
2.1.5 The top of Lower Subbase shall have the required thickness,
shape, superelevation, levels and grades as required in the
drawings and shall be within the tolerances as specified in the
specifications.
2.1.6 In the course of the construction, the level shall be checked using
control/dipping pegs, set out at regular interval along both sides of
the pavement.
METHOD STATEMENT
2.2.6 The top of Upper Subbase shall have the required thickness,
shape, superelevation, levels and grades as required in the
drawings and shall be within the tolerances as specified in the
specifications.
2.2.7 In the course of the construction, the level shall be checked using
control/dipping pegs, set out at regular interval along both sides of
the pavement.Joint survey works on the existing road profile level
shall be carried out to establish the original profile of the location
being overlaid.
METHOD STATEMENT
2.3.2 Preparation of Road base and Wet Mix Macadam shall follow
previous layer procedure.
2.3.3 Prior to laying, the stringline for the gradeline sensor shall be set
out by the survey team at regular intervals along the sides of the
carriageway and shall be set to the required levels.
2.3.4 After the stringline level is jointly surveyed, the laying operations
may commence. Prior laying, foreman shall ensure that all
gradeline and slope sensors are set and working properly.
i. Motor Grader/paver
ii. Back pusher with power broom