GanttChart Sample

The document outlines a project timeline spanning from March 2015 to December 2015. It is divided into 10 main tasks: 1) Project Initiation, 2) Interim Report Documentation, 3) Interim Report Submission, 4) Exam Break, 5) Design, 6) Development, 7) Testing, 8) Evaluation, 9) Final Report, and 10) Implementation. Each task contains sub-tasks with assigned start and end dates to be completed over the course of the project.

Uploaded by

Kiran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views

GanttChart Sample

The document outlines a project timeline spanning from March 2015 to December 2015. It is divided into 10 main tasks: 1) Project Initiation, 2) Interim Report Documentation, 3) Interim Report Submission, 4) Exam Break, 5) Design, 6) Development, 7) Testing, 8) Evaluation, 9) Final Report, and 10) Implementation. Each task contains sub-tasks with assigned start and end dates to be completed over the course of the project.

Uploaded by

Kiran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Mar 2015

ID

Task Name

Start

Finish

3-1

1 Project Name
2

1. Project Initiation

01-Mar-15

01-Dec-15

237d

01-Mar-15

22-Mar-15

19d

1.1 Orientation of FYP

01-Mar-15

01-Mar-15

1d

1.2 Research on Topics & Feasibility

02-Mar-15

08-Mar-15

6d

1.3 Finalize Topic

08-Mar-15

08-Mar-15

1d

1.4 Proposal Writing and Submission

09-Mar-15

15-Mar-15

6d

1.5 Feasibility Study

16-Mar-15

22-Mar-15

6d

23-Mar-15

23-Apr-15

28d

2. Interim Report Documentation

2.1 Introduction

23-Mar-15

29-Mar-15

6d

10

2.2 Background & Literature Review

30-Mar-15

05-Apr-15

6d

11

2.3 Development

06-Apr-15

13-Apr-15

7d

12

2.4 Progress

14-Apr-15

20-Apr-15

6d

13

2.5 Further Work

21-Apr-15

23-Apr-15

3d

14

3. Interim Report Submission

24-Apr-15

24-Apr-15

0d

15

4. Exam Break

26-Apr-15

29-May-15

30d

16

5. Design

31-May-15

03-Jul-15

30d

17

5.1 Database Design

31-May-15

16-Jun-15

15d

18

5.2 User Interface

17-Jun-15

03-Jul-15

15d

05-Jul-15

11-Sep-15

60d

05-Jul-15

11-Sep-15

60d

13-Sep-15

17-Nov-15

57d

19
20
21

6. Development
6.1 Coding
7. Testing

Apr 2015

May 2015

Jun 2015

Jul 2015

Aug 2015

Sep 2015

Oct 2015

Nov 2015

Duration

22

7.1 Black Box Testing

13-Sep-15

20-Sep-15

7d

23

7.2 Unit Testing

21-Sep-15

25-Oct-15

30d

24

7. 3 Integration Testing

26-Oct-15

17-Nov-15

20d

25

8. Evaluation

18-Nov-15

23-Nov-15

5d

26

9. Final Report

24-Nov-15

29-Nov-15

5d

27

10. Implementation

30-Nov-15

01-Dec-15

2d

3-8

3-15

3-22

3-29

4-5

4-12

4-19

4-26

5-3

5-10

5-17

5-24

5-31

6-7

6-14

6-21

6-28

7-5

7-12

7-19

7-26

8-2

8-9

8-16

8-23

8-30

9-6

9-13

9-20

9-27

10-4

10-11 10-18 10-25

11-1

11-8

11-15 11-22