0% found this document useful (0 votes)
58 views

What Are The Steps in Selection of A Valve? What Is A Relief Valve?

This document contains 40 questions related to piping design and process design modeling software (PDMS). The questions cover topics such as equipment layouts, piping codes, the differences between pipes and tubes, valve selection, relief valves, reducers, cavitation, piping components, line classifications, CAD file formats, AutoCAD commands, arrays, colors, blocks, references, hatches, PDMS modules, primitives, modeling views, piping methods, drafting views, and the differences between AutoCAD and PDMS.

Uploaded by

Ram Sayee
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views

What Are The Steps in Selection of A Valve? What Is A Relief Valve?

This document contains 40 questions related to piping design and process design modeling software (PDMS). The questions cover topics such as equipment layouts, piping codes, the differences between pipes and tubes, valve selection, relief valves, reducers, cavitation, piping components, line classifications, CAD file formats, AutoCAD commands, arrays, colors, blocks, references, hatches, PDMS modules, primitives, modeling views, piping methods, drafting views, and the differences between AutoCAD and PDMS.

Uploaded by

Ram Sayee
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

PIPING,PDMS INTERVIEW QUESTIONS

1. What is an Equipment Layout?


2. What are the Essential data required for the
preparation of an Equipment Layout?
3. Which code is used for Process Piping?
4. What is the difference between Pipe and Tube?
5. What are the steps in selection of a valve?
6. What is a relief valve?
7. Concentric reducer is used in pump suction. (Yes /
No). Explain.
8. Which reducer is used in control station?
9. What do you mean by Cavitation in Pump?
10. What do you mean by IBR and which lines comes under
IBR preview?
11. What are vent and Drain?
12. What is critical piping?
13. What are Piping Components?
14. What is the difference between small bore pipes and
large bore pipes?
15. CAD means__________.
16. What is the extension for AUTOCAD Drawing file?
17. PURGE Command is used for_________.
18. What is the shortcut command for OSNAP?
19. What is Array, what are the different types of

Array?
20. How many colors are there in AUTOCAD?
21. What is the difference between Block and Wblock?

Page 2 of 2

PIPING,PDMS INTERVIEW QUESTIONS

22. Write Shortcut for Extend and Trim command.

23. What is the difference between xref and xbind?


24. Can we edit pick box size and cross hair size of

cursor?
25. How many times we can undo objects?
26. What is Polygon? Give Min and Max no. of sides?
27. How do you draw an Isometric Circle?
28. What are Multi lines? Give Min and Max no. of Multi

lines?

29. What is Hatch? Give shortcut for Hatching?


30. What is PDMS and who developed PDMS?
31. What is the hierarchy to be followed in creating
Equipment?
32. What are Primitives in PDMS?
33. What is the shortcut command to see wire frame of

the model?

34. Explain the option Model Editor.


35. Can we see number of graphical views?
36. Is it possible to switch from one module to another?
37. Briefly explain the methods of piping in PDMS?
38. What is difference between DRAFT and ISODRAFT?
39. Is it possible to see Isometric during Piping?
40. What is the difference between AUTOCAD and PDMS?

Page 2 of 2

You might also like