Work Order

This work order document summarizes the repair of a mechanical issue with an asset. The work order status is closed, it was an emergency corrective task assigned to FET Collage and received by ibraheem khress Abu shgair. The problem was a slide movement and accuracy issue on asset numbers 1-4 (Fagor Turning machines). The technician cleaned old grease, greased and lubricated the machines, moved the axes, warmed up the axes. Upon completion, both the technician and requester signed off on the work.

Uploaded by

Ibraheem Khress
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views

Work Order

This work order document summarizes the repair of a mechanical issue with an asset. The work order status is closed, it was an emergency corrective task assigned to FET Collage and received by ibraheem khress Abu shgair. The problem was a slide movement and accuracy issue on asset numbers 1-4 (Fagor Turning machines). The technician cleaned old grease, greased and lubricated the machines, moved the axes, warmed up the axes. Upon completion, both the technician and requester signed off on the work.

Uploaded by

Ibraheem Khress
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Work Order

Work Order NO : 000001

Work Trade :Mechanical

Work Order Status : Closed

Work Type : Corrective

Work priority : Emergency


Assigned to : FET Collage
Received by : ibraheem khress
Abu shgair
Received Data/Time :

Requester : Dr khaleel
Phone Number :

PM Target Start Data :

PM Target End Data :

Problem Description : Slide movement and accuracy


Note to Technician : inspection the lubricant and wear particle
Failure Code : 1

Check list No:

Asset No : 1,2,3,4

Location NO : 2

Asset Name : Fagor Turning


Case description
Stop the machine Prolong tine

Location Name : CNC LAB


Action Taken

Prevention Taken

Clean the old grease-1


Greasing and Lubrication -2
Move axis-3
Greasing and Lubrication -4
Warm up the axis -5

Part and labor Details

**D=Direct Issue , I = Inventory

Data and Time work was started


Time :

Data :

Data and Time work was completed

Data :

Certification and Work Completion


Name and Signature of Technician/Engineer
Name

Signature
Data :
Time :
Please rate our services :
1-Poor
Excellent

Time :

Name and Signature of Requester/Supervisor


Name

Signature
Data :
Time :

2-Fair

3-Good

4-Very Good

5-

Work Order
Work Order NO : 000001
Work Order Status : Open
Work priority : Normal
PM checklist Daily
Checklist No : 1
Checklist Desc:
1- Lubricant the machine
2- clean the machine after usage

Work Trade :Mechanical


Work Type : Prevention