NONCONFORMITY REPORT For Construction (NCR) : SADARA MFC Project

A nonconformity report was issued for a welder working without proper wind protection. [The report noted that the welder (ID 51) was welding without wind protection, in violation of a previous entry in the log book from May 2nd.] [Corrective actions were proposed, including retraining the welder and monitoring to prevent future occurrences, and verification of implementation was required from the contractor.]

Uploaded by

vijayachidu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
77 views1 page

NONCONFORMITY REPORT For Construction (NCR) : SADARA MFC Project

A nonconformity report was issued for a welder working without proper wind protection. [The report noted that the welder (ID 51) was welding without wind protection, in violation of a previous entry in the log book from May 2nd.] [Corrective actions were proposed, including retraining the welder and monitoring to prevent future occurrences, and verification of implementation was required from the contractor.]

Uploaded by

vijayachidu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

NONCONFORMITY REPORT for Construction (NCR)

SADARA MFC Project


NCR NO.

NCR TCC- MECH-0012

DATE

PROJECT NO.
Supplier / Dept.

02 JUNE 2013

DWG/REV. NO or
REFERENCE
SPECIFICATION

P.O No. /
ITEM No.

As per RT8 S-6500-01

E-W MAIN PIPE RACK


INSP.SHEET/
COLUMN
CHECK LIST NO.
NONCONFORMITY :During surveillance at site on 02 June 2013 ,it was noted that TCC welder (welder ID NO 51)
LOCATION

Was welding without proper wind protection. This violation is already entered in the log book Dated 02 MAY 2013.

Attachment :
DISPOSITION :

Re-grade

Repair

CONTRACTOR
Issued by :
Date & Signature:

Rework

Reviewed by:

Reject

Date & Signature :

Use-As-Is
Approved by :

Date & Signature:

ROOT CAUSE :

CORRECTIVE ACTION PLAN BY SUBCONTRACTOR :

Attachment :
Prepared by :

Date & Signature:

Reviewed by : Contractor QC Engineer

Approved by : Contractor QC Manager

COMPLETION DUE DATE :

APPROVED BY CONTRACTOR FOR CORRECTIVE ACTION PLAN :


Approved by Contractor SQCM :

Date & Signature :

PREVENTIVE ACTION :

Prepared by :

Date & Signature:

Reviewed by : Contractor QC Engineer

VERIFICATION OF IMPLEMENTATION BY CONTRACTOR :


ACCEPT
REJECT

Approved by : Contractor QC Manager

OTHERS

INSPECTED BY :

APPROVED BY :

CONFORMED :

Inspector: Date & Signature :

Contractor SQCM: Date & Signature :

Company QR: Date & Signature: