Memo Perkins Industrial Cabinet Co
Memo Perkins Industrial Cabinet Co
Recommendations:
1. The whole process must be analysed and QRM ought to be executed in every stage of
the process.
2. There should be top-down control of the quoting and order process by the manager
and should have responsibility for whole process inside the cell.
3. They should work simultaneously right after the order received due to which the lead
time will be significantly reduced. E.g. When order is placed manufacturing
department should start working simultaneously with other departments, by reviewing
the design and making list of the tools and machinery required.
4. Job ticket should run more than once in a day in the whole process in order to move
job folders faster. New strategies should be introduced in the process.
5. They should consider non value added time for both processes for its correct
evaluation
6. PICC should provide cross training to the workforce so that, during peak periods
there would be combined efforts of the workforce to work efficiently which will help
to reduce the lead time thus will help in satisfying the QRM methodology.
7. During the start of the project, site conditions should be verified for the items quoted
by the customer. This will help in reducing the investment cost of PICC. Also if the
information is inaccurate PICC should not be held liable for the losses occurred.
Re-conducting the time study for the total life cycle of the process will help PICC to
streamline and build a more efficient process. Using the principles of QRM, PICC will help
to come closer to 75% reduction in lead time.
Thank you for giving us an opportunity to work with you, looking forward for your success.
Best Regards,
Akshay.
Rohan.
Eeshan.
Vamshi.