PVD5 - 7 Day Forecast (03-Feb-2015)

This document provides a 7 day lookahead schedule for drilling operations on the PVD-5 rig. It details the planned activities, equipment to/from the rig, personnel changes and vessel movements for each day from Tuesday February 3rd to Monday February 9th. Key events include running and cementing casing, drilling ahead to total measured depth, conducting coring operations, crew changes and delivering/offloading equipment and supplies via supply vessels. The maximum personnel on board is forecast to be 135 people during this period.

Uploaded by

Kurt Mcclain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
104 views

PVD5 - 7 Day Forecast (03-Feb-2015)

This document provides a 7 day lookahead schedule for drilling operations on the PVD-5 rig. It details the planned activities, equipment to/from the rig, personnel changes and vessel movements for each day from Tuesday February 3rd to Monday February 9th. Key events include running and cementing casing, drilling ahead to total measured depth, conducting coring operations, crew changes and delivering/offloading equipment and supplies via supply vessels. The maximum personnel on board is forecast to be 135 people during this period.

Uploaded by

Kurt Mcclain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Well

Hai Thach Development

Date
Initial POB

Tue 3-Feb-15
135

Tuesday 03 Feb
00:00
01:00
02:00
03:00
04:00
05:00
06:00
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00

7 DAY LOOKAHEAD
PVD-5

Wednesday 04 Feb

POOH & Recover Junk - L/Out RCJB Assy (75 ft/min)


00:00
01:00
02:00
03:00
04:00
05:00
06:00
07:00
L/Out Junk Subs - Recover Junk
08:00
09:00
Clear Floor / Sevice Rig
10:00
PU & MU 8-1/2" Bit & BHA. Surf Test tools
11:00
12:00
13:00
14:00
15:00
16:00
RIH to +/- 3000m. Circ to cool MWD Tools
17:00
18:00
19:00
20:00
21:00
RIH to +/- 4350m
22:00
23:00
EQUIPMENT TO RIG

Thursday 05 Feb

00:00
Circ & Condition Mud at 17.3ppg In/Out
01:00
02:00
03:00
Conduct fingerprinting & Choke Drills
04:00
05:00
06:00
Drl-Out remaining Sh-Trk & Shoe at 4408m.
07:00
08:00
C/O Rathole/ Drill 3m new hole 4410m to 4413m09:00
Circ hole clean and condition mud
10:00
11:00
Pull inside shoe/ conduct FIT 18.6ppg EMW.
12:00
Drill 8.5" hole fr 4413 to ~4640m (Top LMH-20) 13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
EQUIPMENT TO RIG

EQUIPMENT FROM RIG


via Nor Captain
(ETA VT late PM)

Friday 06 Feb

00:00
01:00
02:00
03:00
04:00
05:00
06:00
07:00
CBU for Samples
08:00
Drill "x" meters as required per Geologist
09:00
Circulate hole clean
10:00
11:00
12:00
POOH 5std swab test, RIH to TD.
13:00
14:00
Circ B/Up for Gas Count
15:00
16:00
POOH for Coring - Pump out to 5 stds inside shoe
17:00
18:00
19:00
CBU / Flow-Check
20:00
21:00
Pump-OOH to BHA
22:00
23:00
EQUIPMENT TO RIG

EQUIPMENT FROM RIG

160

Max POB next 7 days

135

Saturday 07 Feb
00:00
01:00
02:00
03:00
04:00
05:00
06:00
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00

Flowchk at top of BHA


POOH & Rack back 8.5" drilling BHA

P/up Core barrel assy.

RIH to Coring Point - 4640m

EQUIPMENT FROM RIG

Max beds on rig

EQUIPMENT TO RIG

Sunday 08 Feb

Drop Ball & Core - 36m core

CBU / Flow-Check
Pump OOH Core Assy - 5 stnds inside shoe
EQUIPMENT TO RIG

EQUIPMENT FROM RIG

EQUIPMENT FROM RIG

00:00
01:00
02:00
03:00
04:00
05:00
06:00
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00

Monday 09 Feb

Flowcheck
(Pump-Out) Core Assy to BHA

FlowCheck - POOH Coring BHA to surface

Recover Core at Surface


EQUIPMENT TO RIG
via Thai Binh
140T Barite (Fine Grind) - QTY TBC
400 BBL Base Oil per DMSR 31-01
5-1/2" Liner Full Jts + Pups
5-1/2" Liner Shoe Tracks
5-1/2" LNR Centralizers & Stop Collars
5-1/2" LNR Lift Nubbins & Acces's
1 ea 6-1/2" Jars + Accelerator
EQUIPMENT FROM RIG

CREWCHANGE

RIH to ~2400m.

Stage Circulate
RIH to ~3793m to

RIH to 3750m washing down F/- 3400m


EQUIPMENT TO RIG
via Thai Binh (continued)
Empty Basket f Howco 13.625 RTTS
others - TBA

EQUIPMENT FROM RIG


via Hai An

From Rig

To Rig
8
1

1
1

0
0
Updated POB .135
VESSELS
Thai Binh at VT
Hai An at Rig
Nor Captain at VT (PM)
Tuesday 03 Feb

Clear and Tidy Rig Floor


MU 8-1/2" Bit & BHA. Surf Test tools

Core Samples (1st Core)


Howco 13.625 RTTS
1 ea 6-1/2" Jars + Accelerator (used)
others - TBA

350T Bails (30ft) - BDPOC


Empty Containers
Waste Skiffs
To Rig

00:00
01:00
02:00
03:00
04:00
05:00
06:00
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00

CREWCHANGE
From Rig
PVD-5 Crew Change
8
PVD-5/ Dpty Drlg Mgr (Phuc)
PVD-5/ /Drilling Engr Trainee
1
PVDI Mud Cooler Operator
PVDL MudLogger

CREWCHANGE

From Rig

To Rig
8

1
1
1
1

1
1

11
11
Updated POB .135
VESSELS
Thai Binh at VT
Hai An at Rig
Other - TBC
Wednesday 04 Feb

To Rig

0
0
Updated POB .135
VESSELS
Thai Binh at VT
Hai An at Rig
Other - TBC
Thursday 05 Feb

CREWCHANGE
From Rig
PVD-5 Crew Change
7
PVD-5/ Dpty Drlg Mgr (Phuc)
1
BDPOC DE
PVDL Data Engineer
MI Sr. Mud Engr
BHI Directional Driller

1
1
1
1

PJT / POS Pltfrm Crew - TBC

13

12
25
Updated POB .122
VESSELS
Thai Binh at VT
Hai An at Rig
Other - TBC
Friday 06 Feb

To Rig

CREWCHANGE

From Rig

0
0
Updated POB .122
VESSELS
Thai Binh to Rig (AM)
Hai An at Rig
Other - TBC
Saturday 07 Feb

To Rig

CREWCHANGE

From Rig

0
0
Updated POB .122
VESSELS
Thai Binh at Rig (AM)
Hai An at Rig
Other - TBC
Sunday 08 Feb

To Rig

CREWCHANGE
PVD-5 Crew Change

From Rig

0
0
Updated POB .122
VESSELS
Thai Binh at Rig
Hai An to VT
Other - TBC
Monday 09 Feb