Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
100%
(4)
100% found this document useful (4 votes)
1K views
UZI Receiver
Popular method of restoring receiver parts to whole
Uploaded by
fritzxfiles20147912
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save UZI Receiver For Later
Download
Save
Save UZI Receiver For Later
100%
100% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
100%
(4)
100% found this document useful (4 votes)
1K views
UZI Receiver
Popular method of restoring receiver parts to whole
Uploaded by
fritzxfiles20147912
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save UZI Receiver For Later
Carousel Previous
Carousel Next
Save
Save UZI Receiver For Later
100%
100% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 32
Search
Fullscreen
INSTRUCTIONS for PROFESSIONAL MILLING AND MACHINING f US manufactured Group Industries UZ Style Receivers These instructions require that you possess a technical level of knowledge and competence in the repair, service and maintenance of firearms. They also require a highly competent level of skill at machining and metal working If you do not possess these skills, we do not recommend that you attempt this pro- cess without skilled professional assistance.Step#1 Step#2 Step#2A Step#2B-I thru 3 Step#2B-4,5 & 6 Step#3 Step#3A Step#3B1 thru 6 Stepi4 Step#4A Step#4B Step#4C Step#4D Step#4E Step#4F Step#5A thru #5F Step#5G Step#5H TABLE OF CONTENTS Receiver preparation Stamping the bottom of your receiver Alignment Kit; parts required Stamping the bottom of your receiver Stamping the bottom of your receiver Front hand guard post, rear hand guard post and trigger housing lug (installation) Installation of the expansion block/heat sink Front hand guard post; rear hand guard post and the trigger housing lug (installation, securing & welding) Trunnion, front sight base and feed ramp Installation & Welding Prepare Receiver for Step#4B Correct insertion of the parts Placement & securing parts for welding Correct placement of feed ramp Alignment bar and rear alignment jig Welding the installed parts Bolt guide bar -installation and welding Pre weld bolt check Welding the guide bar pageRECEIVER ALIGNMENT KIT & RECEIVER PARTS KIT INSTALLATION INSTRUCTIONS Thank you for your recent purchase of our Receiver Alignment Kit and/or Receiver Parts Kit, This means that you have already purchased or that you intend to purchase a Group Industries UZI style receiver or other equivalent receiver. ‘These instructions are exclusively for the application and use of this Receiver Alignment Kit to install D & D, U.S. manufactured receiver parts on properly milled Group Industries Receivers. ‘You have made a wise choice that will save you hours of work. It would be difficult, if not impossible, to complete your receiver without this alignment kit. This kit will permit you to complete your receiver, with precision, in a fashion that will be virtually identical to an IMI UZI model A or B carbine. STEP #1: RECEIVER PREPARATION: This literature does not deal with the machining or milling of your receiver. ‘The Group Industries receivers are not finished and require substantial pre-assembly milling and machining. You must first prepare your receiver or have it prepared by finishing the milling not completed by Group Industries. MILLED (Group Industries) RECEIVER (Finished and ready to install receiver parts) Here are illustrations of four views of the finished receiver after final milling and processing SIDE VIEW (right) oo TOP VIEWSTEP #2: STAMPING THE BOTTOM OF YOUR RECEIVER: This creates the pocket that holds the front end of your fire control in place on the receiver. You must first stamp the pocket that receives and secures the front projection of the fire control assembly. Follow the instructions and illustrations below: Step #2-A Remove the four parts shown in the illustration below from your alignment kit. Stamping die alignment bar. (Aligns receiver and die) Female stamping die. Male stamping die. Support block for rear of receiver while stamping. ee GROUP INDUSTRIES RECEIVER Step #2-B 1. Take the die alignment bar (#1 above), and insert it into the slot in the female die (#2 above):... See illustration below:Step #2-B continued: 2. Place Receiver and the female die with the insert installed on the table as shown in the illustration Step #2-B figure 1 & 2 below: Place the receiver rear support bar (Item #4 from Step # 2-A on page 5) on the table as shown in the illustration Step #2-B figure 3 below): Step #2-B figure | Step #2-B figure 2 3. Place the receiver on top of the die with the bottom down. Orient the die and the receiver precisely like the illustration below. Slide the die alignment bar up through the slot in the receiver exactly as shown in the illustration below: 4. The narrow side of the female die must be at the front of the receiver:4, Take the male stamping die ( item #3 page 5)and insert it in front of the stamping die alignment bar exactly as pictured below: The beveled bottom goes down. 1 5. In order to complete your stamping, you must insert this configuration into a shop press and press the male die down until it presses the bottom of the receiver to the surface of the female dic. A six (6) to twelve (12) ton shop press is more than adequate to complete your stamping. KEEP THE DIE VERTICAL WHILE STAMPING. Shop presses have a tendency to shift to one side while stamping. Shim the sides if necessary If a shop press is not available, it is possible to press your receiver with a large vise. 6. After you finish stamping your receiver in accordance with these directions, the bottom will look like this: (See Iustration below) Bottom view This area, around the rear hand guard post hole, may recess inward slightly. It is not necessary, but you may choose to tap it back out from the inside. It does not effect the operation, but it may leave a slight space between the hand guard post and the receiver. The finished stamping is indistinguishable from an original UZI stamping if these instructions are followed precisely.STEP#3: FRONT HAND GUARD POST, REAR HAND GUARD POST AND TRIGGER HOUS- ING LUG; Installation and welding: Complete Step #3A before proceeding to Step #3-B STEP#3-A INSTALL THE EXPANSION BLOCK/ ( HEAT SINK) PRIOR TO BEGINNING STEP #3-B This helps prevent the receiver from shrinking during welding in step #3B5. Very good heat control is ctitical in the next stage of welding. You must keep the heat to a minimum or the receiver can shrink too small to permit the bolt to slide freely. See Items 1, 2 & 3 and Illustration #3A figures 1, 2 & 3 below for the parts and tools required 1. Clamp Mlustration #3A-figures 1,2 &3 2. Expansion block 3 Receiver ' Place the block as close to the slots for the trigger housing lug as possible without interfering with the placement of or the welding of the trigger housing lug. (See Illustration #3-A-1 below) Leave a small amount of the ejector slot showing. This allows the trigger housing lug to come as far forward as possible.Step #3B: Front hand guard post, rear hand guard post and the trigger housing lug; Installation, securing and welding: Stcp #3A must be completed and left in place until all of Step #3 is completed Select the following parts listed and numbered below from your kit: 1. Front hand guard post 1 2 3 2. Rear hand guard post 3. Trigger housing lug Cl) oO Ou 4, Nail ( #8 penny); not inc. 5. Milled and stamped receiver: i. 6. Three pieces of tie wire ——} 8” long (not shown); not inc. Follow the Ilustrations below: #3B1 thru #3B6. B. 1. Insert the above listed parts, #1 thru #4, as shown below in Illustration #3B 1 and #3B2, and in Illustration #3B3 and #3B4 on page 10: a. Secure the parts into the slots by tying into place with the tie wire specified: b. The front hand guard post or bayonet lug must be flush with the front of the receiver, c. If the receiver is milled correctly, the slot is correctly placed without milling or filing. d. Insert the rear hand guard post; then insert the nail to visually ascertain that the hole is aligned perpendicular (90 degrees) to the sides of the receiver. . Remove the nail and secure the post through the hole with the tie wire if required. f. Be sure that the trigger housing lug is pushed as far forward as possible. In most cases, the slots are correctly positioned from front to back without filing. Be sure that they are centered from left to right2. Sight down the bottom of the receiver to be sure that the three parts are FLAT, PRESSED IN COMPLETELY & LEVEL (from left to right and front to back). The parts must also be perfectly parallel to the receiver. Visually sight from the front to the rear and from the rear to the front as shown in Illustration #3B3 and #3B4 below: & ‘ (ab Mustration #3B3 Illustration 3B4 ah After inserting, leveling and visually aligning these three parts you are ready to weld all three parts from the top. The finished product will look like #3B5 and #3B6 below: The alignment must be done visually. You must carefully visually align and level the parts by sight. The dimension s measured from the center of the front hand guard post are specified below. The center of th front hand guard post hole is the reference point for all these measurements. Illustration #3B5 10.680" + or - 005” ‘This dimension may vary substan. yy 5 tially due to variations in the origi- ‘nal G.l. stampings. The rear sight cars should be maintained at 1.5 in 5.172" +0r - 010" 3.0" +0r - 010" order to match the rear sight base di- mensions. The dimensions listed are ‘important. Maintaining the listed c dimensions may cause this dimen. 4.035” +or - 005" sion and the overall length to vary substantially. This should not affect Cc c the proper operation These dimensions are not to scale: They reflect precise measurements from working G.I. and model Astyle carbines. They are included only as a reference to assist you in your assembly, Illustration #3B6 WARNING: Gunsmithing skills and a thorough knowledge of the UZ1 style carbine are essential to the proper and safe assembly of these re ‘vers.STEP #4: Trunnion, front sight base and feed ramp; Installation & Welding: Follow the instructions and illustrations below: First remove the following list of parts from your kits: Alignment Kit (Illustration #4A figure | & 2); and the Receiver Parts Kit: (Illustration #4A-figures 1,2 & 3 figure 1 Alignment Kit : Mlustration #4 figure | & 2 1. Alignment guide bar: figure 2 2. Rear alignment jig: Receiver Parts Kit:: IIlustration #4A figure 1.2 & 3 1. Front sight base: figure 3 figure | act 2. Feed ramp: ewe — > B — Cy You will require three C clamps. 2” long by 1.5” wide or similar size: Step #4-A Requires that your receiver have Step #3 completed: 1. Grind and polish the welds smooth before proceeding to step #4. It is not necessary to grind the front hand guard weld as it is under the trunnion and does not interfere with the ‘assembly.Step #4 B: Insert the trunnion and front sight base; follow Illustration #4-B-figures 1 & 2: 1. Insert the sight base and trunnion at the same time: figure | figure 2 Illustration #4B- figure | & 2 Step #4 C: Clamp the sight base into place; place the Ist clamp at the bottom of the front sight base. See Illustration #4-C-figures 1, 2, 3 & 4 below: 1. Press the sight base firmly and flat onto the top of the trunnion. (a), Simultaneously hold the trunnion in place while installing the first clamp, 2. Make certain that the notch on the front sight base is aligned with the notch in the trunnion, The notch on the trunnion is slightly wider than the notch in the sight base to be certain that there is clearance for the barrel retaining latch to slide in freely. See Illustration #4C-figure 3. 3. The rear of the sight base must be flush and square on top of the trunnion. See #4C-figure 4 4. Insure that the sight base is set properly: Ifnecessary, temporarily use a clamp to gently press the sight base down from the top after installing the first clamp. Refer to Illustration #4-C figure 4 below and Illustration #4F figure 2 on page 14 for correct height dimensions. Remove this clamp before welding. Then “insert and remove” the barrel retaining latch into the notch before welding. This checks to make sure you haven't over compressed the sight base or compressed it at an angle. Ifthe notch is too tight, you may have to file the opening a slight amount. 5. Place the second clamp on the sight base into the place shown: See Illustration #4C- figure 2,3 & 4. (a). This insures that the receiver sides and the upper sight base are in close contact prior to welding. J —second clamp Illustration #4C figure 2 Ay first clamy “ Eaeene first clamp X /} Measurement from second clamp / © Top of trunion to theStep #4-D Remove the feed ramp from your Kit: See Illustration #4-figure 2 page 11 Slide the feed ramp into place: See item #1 and #4D-figure 1 below: 1, Feed ramp: #4D figure | #4D figure 2 2. Install the feed ramp exactly as shown in figure 1 above: a. The feed ramp should be flush with or about 1/32” forward of the magazine hole. This allows the end of the barrel to protrude past the edge of the feed ramp by about 1/32” to 1/16". See #4D figure 2 above: 3. The barrel must be inserted to be certain that it protrudes past the feed ramp before welding. (a) Make any necessary adjustment at this time and remove the barrel for the next step. Step #4E. Insert the Alignment guide bar through the trunnion and feed ramp and into the rear align- ment Jig: (See illustration #4-figure | & 2 on page II for parts). See #4E figure 1 below: 2. Insert the guide bar into the rear alignment jig before clamping. A. Installing the end of the bar into the jig before sliding the jig into the end of the receiver is easier when there is a tight fit. See #4E-figure 2 & 3 below: 1. If the bar and jig don’t line up; file the side of the feed ramp slot in the receiver to permit some lateral movement. The bar sets the correct relative positions of the three parts during installation. B. Clamp the jig onto the rear of the receiver as shown in figure 2 & 3. 1. Lightly tighten the clamp and tap the jig down so that there is a tight fit all around. #46 figure 3 (end view finside/rear) 3. Secure the clamp tight and you are now ready to weld the trunnion, front sight base and feed ramp.STEP #5: BOLT GUIDE BAR; ‘Installation and welding The following are a list of the parts you will require. 1. Bolt guide bar spacer: 2. Bolt guide bar: 3. Back plate 4. Three clamps Step #5A: Take your prepared receiver with Steps #1 thru #4 of this manual completed; see Illustration #5A-figure | #5A-figure 1 Step #5B: Insert the Bolt guide bar spacer into the receiver; sce Illustration #5B-figure 2 1. Place the beveled edge against the side and bottom of the receiver. #5B-figure 2 Step #5C: Place the guide bar on top of the spacer with the rounded edges facing out and to the front of the receiver. See Illustration #5C figure 3 : #5C-figure 3Step #5D: Clamp the back plate onto the back of the receiver as if you were going to install it: (a) Make certain that the back plate is secured firmly against the back of the receiver. 1. Slide the spacer and the guide bar back against the back plate. See Illustration #5D- figure 4 #5D- figure 4 Step #5E: Place two clamps on the guide bar to secure it to the receiver: See Illustration #5E-figureS 1. Press firmly down on the guide bar as you tighten the clamps: 2. The clamps will have a tendency to slide either up or down as you tighten. It may take several attempts to get the bar properly positioned. 3. Tighten the clamps just enough to hold the bar in position. 4. Additional tightening shifts the bar out of position. #5E-figure 5 Step #SF: Remove the back plate before welding: See Mlustration #5F figure 6 & 7 1. The guide bar spacer should slide freely, without any friction, in and out. 2. The bar must not be too high. It must not bind in any way. (See #5G- figure 8 & 9 page 17):Step #5G: Take your model A or B bolt and place it into the receiver. Move the bolt toward the back until it touches the first clamp: ( See figure 8 and figure 9 below:) figure 8 figure 9 1. Sight down the rear of the receiver, in good lighting, to be certain that the bar hasn't slipped and that it aligns with the bolt guide bar slot. The bolt can only be moved back to the clamp, but you can see from the rear if there is approximately equal clearance on the top and bottom of the bolt guide bar. (See illustration #5G-figure 10 & 11 below:) % : figure 11 2. Look for equal clearance at both points indicated: (between the bolt and guide bar, “top & Bottom”). 3. When you are certain that the guide bar is properly aligned, you are ready to weld the bar into place. Weld the bar to the receiver through the three holes already provided in your receiver. Be careful to limit the heat as much as possible to prevent warping the receiver. IMPORTANT NOTE This is one of the most difficult procedures to set up because of the low clearance between the bolt and the guide bar. It will set up easily if you do not over tighten the clamps. Tighten the minimum necessary to hold the bar in place while you weld Over tightening will also cause the top edge of the receiver above the bar to warp when welded. Tighten the minimum necessary to hold the bar firmly in place.Step #SH Welding the guide bar 1. Guide bar just before welding: See Illustration #SH-1 Illustration #5H-1 2. Guide bar after welding: Illustration #5H-2 for outside and Illustration #5H3 for the inside: . Illustration #5H-3 Illustration #5H-2 3. IMPORTANT: Use a dremmel cut-off wheel to grind any excess on the top and bottom of the guide bar before proceeding with the assembly.Step#5I: Checking the guide bar after welding: Get your UZI model A or B bolt: See Illustration #51-1 below: Illustration #51-1 See Illustrations #51-2 a #51-3 below: 1. Remove the clamps. 2. Clamp the back plate back onto the receiver. (Very important step) 2. Insert your model A or B bolt. 3. Slide the bolt back and forth to be sure it slides freely over the bar all the way to the back of the rear of the receiver. If there are any restrictions, this is the time to adjust them. ‘There are variations in the G.I. Stamping. You may have to file the top and bottom of the inside rear of the receiver because of irregularities in the receivers. You must make any adjustments now if there are any restrictions. If you do not, it will be much more difficult later. we » Illustrations #51-2STEP #6: BACK PLATE; Installation and welding : You will need your receiver with steps #1 thru Step #5 completed, and the following list of parts: 1. Back plate: 2. Clamp ‘Step #6A: Place the back plate on the rear of the receiver: 1. Clamp the back plate securely in place: See illustration #6A-figure | #6A-figure | 2 Make sure that the back plate fits tight inside and outside; tighten the clamp and tap the back plate down until it fits tightly against the receiver, bottom and sides. See #6A figure 2 & 3 below #6A figure 3 #6A figure 2 figure 3. Figure 3 is shown with the bolt guide bar removed to Provide a clear picture of how the back plate must fit. The guide bar must be installed before the back plate is welded into place.Step #6 Welding the back plate continued See Step #6B: Completed welds Illustrations #6B-figures | & 2 figure 2 Step #6C. After completing the welding; insert your model A or B bolt to insure that it moves freely. 1. Make any adjustments necessary after each operation by using the bolt as a guide for shaping your Gl receiver: 2. There are some minor variations in the stamping of the group industries receivers that can only be adjusted by hand filing as you assemble your carbine.STEP #7: REAR SIGHT BASE ; Installation and Welding : This is the final part of your project that requires welding on your receiver. You will need four things listed below and illustrated in (Step #7A, figure 1,2,3 & 4): If spot welding: go t P#7A now. If Tig welding go to STEP#7-G (page 24) before proceeding. STEP #7 1 Receiver with Step | thru 6 complete: Step#7A figure-1 2. Rear sight base 3. Rear sight base height spacer. a 4. Five (5) 2” X 1 1/2” clamps me Step#A figure-4 Step#7A figure-2 Step#7A figure-3 Rear sight base Height spacer = STEP #7-B 1. Insert the height spacer (item #2) in the rear of the receiver with the (T) on top. Illustration 2 1. Put the rear sight base on top of the spacer with the small tabs at the rear of the receiver, Be sure that the rear of the sight base maintains contact with the back plate during welding. (Refer to Tllustraion-3) Illustration 3STEP #7 Continued: STEP #7-D 1 Clamp the rear sight base into place using one clamp in the center of the top of the rear sight base. If it fits tight all the way around, then no additional clamps are needed. If additional clamps are needed go to STEP #7-E. If additional clamps are not needed proceed to STEP#7-F Tllustration 4 Step #7-E 1. If the rear sight base has large spaces between it and the receiver frame, you may be required to clamp the sight base into place at all four comers to close any gaps. Refer to illustration 5. If additional clamps are needed, you must clamp all four corners to prevent the sight base from tilting in any direction. Leave the clamp in the center while placing the clamps into the corners. Then Illustration 51, REMOVE the height spacer before welding. . Slide the spacer in and out being sure that it moves freely. Readjust the sight base by tapping it up or down until you get the spacer to move freely. There should be just very mild friction as the spacer slides in and out. 3. Insert your model A or B bolt into the receiver to insure that it slides freely. There will be more clearance on the top of the bolt than on top of the spacer. This is correct. 4. You are now ready to weld the sight base into place. The method and preparation should have already been chosen, either Tig or spot weld. n Step#7-G . Step #7-G is only performed and required if you are TIG welding the rear sight base. (a.) Drill two 5/32 holes on each side of the sight base per illustration below. (b) The holes must be drilled before the sight base is inserted. (c) proceed to step #7-B page 17. Copyright-—---- 1999, 1D & D Sales, 4739 Ranch Rd, Sierra Vista, Ar. 85635 ——-Copyright 1999STEP #8: SLING SWIVEL INSTALLATION This next step should be performed after you have completed your Gl receiver and just prior to bluing or parkerizing your finished receiver. 8A. Your US manufactured sling swivel does not require welding: Follow the instructions outlined below: You will need the parts and tools listed and illustrated below. . Sling swivel (From D & D Parts Kit): 1 2 . Sling swivel retaining washer: 0 3 Punch ( wide taper): Needle nose vise grips: - Hammer : 4 . Receiver, finished and ready for blucing. DAwPwne 8B. Installing the sling swivel: 1. Insert the sling swivel (#1 above) into the sling swivel hole on the receiver. It must fit flush with the surface of the receiver as in figure B-1 below. You may have to lightly file the hole sides to insert the sling swivel all the way. figure B-1Step #8B continued from page 25 2. Place the retaining washer (item #2 on page 25 #8A) onto the other side of the sling swivel: See Illustration B2 below. 3. Clamp the sling Swivel and the retaining washer together onto the receiver with the needle nose vise grips as in figure B-1 & B-2 figure B-2 4. Take the punch (Step#8A item 3 page 25) and place the point on the junction of the retaining washer and sling swivel pivot post. See figure B-3 below 5. Place the post on a solid surface, take the hammer (item #5 on page 20) and hit the punch firmly enough to bend the edge of the pivot post over the retaining washer. 6. Rotate the sling swivel until you have peened the sling swivel pivot post over the washer in 4 or 5 places. Hit the edges until you have secured the washer firmly on the post. You should have at least two retaining washers in the event that you are not successful the first time. 7. Itis possible to weld the center of the sling swivel retaining post. You must use a .040 or smaller tig welding tip because the retaining washer melts ver y easily. NOT! DAS! /MBLER/WELDER Clamping the washer to the receiver with the vice grips acts as a heat sink and helps to obtain a proper weld without melting the retainig washer. figure B-3STEP EJECTOR INSTALLATION #9 (The last step before finish, touch-up and blueing ) Step #9A Required parts and tools; see list | thru 3: Do not weld or heat; The heat will remove the temper 1. Hammer T 2. Rivet i: iieeamer 3. Ejector 2. Rivet 3. Ejector Step #9B: Ejector Installation: 1. Press the ejector all the way back in the slot so that the rear of the ejector butts firmly against the front of the trigger housing lug. The ejector and receiver hole should align See figure #9B-1 2. The ejector hole must line up precisely with the hole in the receiver. The ejector hole is not always precisely placed in the receiver. The hole and slot_ must be adjusted if necessary to allow the ejector to precisely fit into the groove in the bolt. 3. Insert the ejector in the slot (hold in place), then insert the bolt to see that the ejector is aligned precisely in the ejector slot in the bolt and that it moves freely 4. If the bolt does not move freely, you must file the slot to adjust the position of the ejector until the bolt moves freely. If the ejector hole is not precisely centered on the hole in the receiver, you must file the receiver hole until the ejector hole shows even spacing on both sides of the hole. The hole does not have to be perfectly round, just the same spacing on opposite sides. The rivet expands into the hole and sets the position of the ejector. figure #9B-1 Step#9C: Securing the ejector with the rivet: w . Place the rivet into the hole from the inside of the receiver: . Place the head of the rivet securely on an elevated flat piece of steel that will fit inside the receiver. |. Hit the other side of the rivet until it flattens and expands into the hole firmly securing the ejector to the receiver. (Select a hammer size and a piece of back up steel appropriately sized for the job). 8. If you have difficulty hitting the rivet, select a 1/2” or 3/4” steel rod 2 to 3 inches long. Place this on the rivet and hit it with the hammer to flatten the rivet. 9. See Illustration #9C-1 and #9C-2 on page 28 for finished installation. aeStepp#9C continued: Illustration #9C-1 (top view) Illustration #9C-2 (bottom view)Step#10: Three views of a finished Group industries receiver: Illustration #10-1 (top), #10-2 (bottom) & #10-3 (left side) . Illustration #10-1 (top) b sweae, 010 5.172" 408 - “—o 4.260" 400 - 030" tor- 010" 13.460" +or - 13.5480" tor - These dimensions are measurements taken directly from UZI model A style carbines, The dimensions in black should be maintained as precisely as possible. Those in red may vary substantially because of variations in the original group industries receivers. All of these dimensions are included only as a reference sample to assist you in your assembly. The dimensions are referenced from the center of the rear hand guard post hole. WARNING: Gunsmithing skills and a thorough knowledge of the UZ style carbine are essential to the proper and safe assembly of these receiversa
You might also like
The MAC-10 Construction Guide - Practical Scrap Metal Small Arms Vol.6
PDF
87% (263)
The MAC-10 Construction Guide - Practical Scrap Metal Small Arms Vol.6
23 pages
DIY Sheet Metal Derringers - Practical Scrap Metal Small Arms Vol.7
PDF
92% (465)
DIY Sheet Metal Derringers - Practical Scrap Metal Small Arms Vol.7
14 pages
Full Auto Conversion For Tokarev TT, TT-33 and Similar Design of Pistols
PDF
88% (8)
Full Auto Conversion For Tokarev TT, TT-33 and Similar Design of Pistols
18 pages
Ak Blueprints
PDF
100% (9)
Ak Blueprints
39 pages
The Box Tube MAC-11 Part 2 (Practical Scrap Metal Small Arms Vol.5)
PDF
91% (69)
The Box Tube MAC-11 Part 2 (Practical Scrap Metal Small Arms Vol.5)
16 pages
Colt AR-15 Owners Manual
PDF
100% (6)
Colt AR-15 Owners Manual
72 pages
Silencer From Maglite
PDF
93% (15)
Silencer From Maglite
5 pages
TEC 9 and KG 99 Full Auto Conversion
PDF
95% (19)
TEC 9 and KG 99 Full Auto Conversion
25 pages
Ruger 10-22 Select Fire Full Auto Conversion
PDF
100% (3)
Ruger 10-22 Select Fire Full Auto Conversion
0 pages
Uzi Semi Build Step by Step
PDF
100% (1)
Uzi Semi Build Step by Step
78 pages
AR15 Build Guide
PDF
100% (6)
AR15 Build Guide
37 pages
UZI Receiver
PDF
100% (2)
UZI Receiver
7 pages
DP Series Build Sheet
PDF
100% (1)
DP Series Build Sheet
49 pages
Building A Complete AR-15 Lower Reciever
PDF
100% (11)
Building A Complete AR-15 Lower Reciever
27 pages
Sterling Build V2
PDF
100% (2)
Sterling Build V2
16 pages
Expedient Homemade Shotgun Ammo
PDF
89% (19)
Expedient Homemade Shotgun Ammo
25 pages
Desi Katta Construction Guide
PDF
71% (7)
Desi Katta Construction Guide
13 pages
Uzi Receiver Blueprints Aa
PDF
100% (2)
Uzi Receiver Blueprints Aa
7 pages
Ar15 Lowerblueprints Unknownorigin
PDF
100% (1)
Ar15 Lowerblueprints Unknownorigin
9 pages
Ingram MAC-10 Full-Auto Conversion
PDF
100% (8)
Ingram MAC-10 Full-Auto Conversion
29 pages
361 Mac 10
PDF
100% (1)
361 Mac 10
5 pages
Colt AR-15 Rifle Lightning Link
PDF
100% (2)
Colt AR-15 Rifle Lightning Link
5 pages
Blueprint - Sten MK II, MP-40, Yugo 56, Submachine Guns
PDF
82% (11)
Blueprint - Sten MK II, MP-40, Yugo 56, Submachine Guns
8 pages
Silencer Plan 01
PDF
100% (1)
Silencer Plan 01
9 pages
Datum Gear Inc Ar-15 Kevlar 80% Lower Presentation
PDF
100% (3)
Datum Gear Inc Ar-15 Kevlar 80% Lower Presentation
20 pages
Mac - 10-Cobray Owner's Manual
PDF
100% (1)
Mac - 10-Cobray Owner's Manual
36 pages
The SWD Lightning Link
PDF
100% (4)
The SWD Lightning Link
2 pages
Block II Tech Manual
PDF
100% (1)
Block II Tech Manual
19 pages
Building A Complete Lower
PDF
No ratings yet
Building A Complete Lower
27 pages
AR-15 Lower Assembly Instructions
PDF
100% (1)
AR-15 Lower Assembly Instructions
7 pages
Ak Receiver Bending
PDF
No ratings yet
Ak Receiver Bending
14 pages
M4-SD II Compensator
PDF
100% (2)
M4-SD II Compensator
2 pages
EP2369289A1
PDF
100% (1)
EP2369289A1
10 pages
Silencer Plan 04
PDF
100% (3)
Silencer Plan 04
8 pages
MAC .45 ACP Receiver & Mag Housing
PDF
No ratings yet
MAC .45 ACP Receiver & Mag Housing
3 pages
Silencer Plan 09
PDF
100% (4)
Silencer Plan 09
3 pages
Firearm Silencers - Nolan Wilson PDF
PDF
No ratings yet
Firearm Silencers - Nolan Wilson PDF
45 pages
Piirustukset Pistooli Sig p228
PDF
No ratings yet
Piirustukset Pistooli Sig p228
10 pages
United States "Patents PDF
PDF
No ratings yet
United States "Patents PDF
17 pages
Suppressor: Uzi AR-15 Heckler & Koch USP Beretta 92FS SIG Mosquito
PDF
100% (1)
Suppressor: Uzi AR-15 Heckler & Koch USP Beretta 92FS SIG Mosquito
23 pages
Firearms - Blueprint - AK-47 Semi Auto Receiver Plans and Instructions
PDF
80% (5)
Firearms - Blueprint - AK-47 Semi Auto Receiver Plans and Instructions
39 pages
Uzi
PDF
No ratings yet
Uzi
46 pages
Lightning Link Printable Template V1.0
PDF
100% (2)
Lightning Link Printable Template V1.0
5 pages
Silencer Plan 03
PDF
100% (2)
Silencer Plan 03
6 pages
Marlin.22RifleDrop InFullAutoConversion
PDF
100% (1)
Marlin.22RifleDrop InFullAutoConversion
7 pages
AK-47 Select Fire Conversion
PDF
86% (7)
AK-47 Select Fire Conversion
16 pages
Mujahadeen AR-15
PDF
100% (4)
Mujahadeen AR-15
13 pages
Revised Uzi Build Tutorial
PDF
No ratings yet
Revised Uzi Build Tutorial
6 pages
PY2A M500 88 Instructions
PDF
No ratings yet
PY2A M500 88 Instructions
11 pages
Installing The Delta Ring Assembly & The Barrel Into The Upper Receiver
PDF
No ratings yet
Installing The Delta Ring Assembly & The Barrel Into The Upper Receiver
2 pages
Ar15 Parts
PDF
100% (10)
Ar15 Parts
10 pages
AR-15 Builders Resource - Version 1 (Rev. 1)
PDF
100% (1)
AR-15 Builders Resource - Version 1 (Rev. 1)
48 pages
602468625-FGC-9-MkII-GuideV2[139-174]
PDF
No ratings yet
602468625-FGC-9-MkII-GuideV2[139-174]
36 pages
UZI Action Arms .22 Conversion Manual
PDF
No ratings yet
UZI Action Arms .22 Conversion Manual
5 pages
Assembling Your Own Stripped AR - 1
PDF
100% (2)
Assembling Your Own Stripped AR - 1
103 pages
G3 Paddle Mag Install
PDF
No ratings yet
G3 Paddle Mag Install
10 pages
HK Building Shit
PDF
No ratings yet
HK Building Shit
10 pages
10 - 22 Instructions
PDF
No ratings yet
10 - 22 Instructions
4 pages
M11 Assembly Guide
PDF
No ratings yet
M11 Assembly Guide
8 pages
CZAR V2 Build Tutorial
PDF
100% (3)
CZAR V2 Build Tutorial
20 pages
AR15 Parts Assembly
PDF
100% (1)
AR15 Parts Assembly
10 pages
PM 01 Carbine
PDF
100% (2)
PM 01 Carbine
9 pages
P.L.a. V1.1 Assembly Guide
PDF
No ratings yet
P.L.a. V1.1 Assembly Guide
28 pages
SUDY INSTRUCTIONS
PDF
No ratings yet
SUDY INSTRUCTIONS
11 pages
CZAR v3 Build Tutorial
PDF
No ratings yet
CZAR v3 Build Tutorial
20 pages
Borescopes Part 1
PDF
No ratings yet
Borescopes Part 1
9 pages
Borescopes Part 1
PDF
No ratings yet
Borescopes Part 1
9 pages