Design Data: Galfar Engineering Contracting LLC GEN-WI-000-003-F/02 Rev. 0

This document provides design data for Job No. D-768/MUK-02/13. It outlines the scope of electrical design and verification work for an ES-PCP facility. Applicable codes and standards include SP-1099, SP-1103, and DEP 33.64.10.10. Statutory requirements will be as specified in the standards. There are no ambiguous or conflicting requirements noted at this time. The document was prepared by Sakthivel R, the design engineer, and reviewed by the design focal point as required.

Uploaded by

Salman Faisal
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
81 views

Design Data: Galfar Engineering Contracting LLC GEN-WI-000-003-F/02 Rev. 0

This document provides design data for Job No. D-768/MUK-02/13. It outlines the scope of electrical design and verification work for an ES-PCP facility. Applicable codes and standards include SP-1099, SP-1103, and DEP 33.64.10.10. Statutory requirements will be as specified in the standards. There are no ambiguous or conflicting requirements noted at this time. The document was prepared by Sakthivel R, the design engineer, and reviewed by the design focal point as required.

Uploaded by

Salman Faisal
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Galfar Engineering Contracting LLC

GEN-WI-000-003-F/02; Rev. 0

DESIGN DATA
Job No.:

D-768/MUK-02/13

1.

Discipline design / development scope:


Preparation of Scope of Work, design/verification of Electrical Drawings for MUK-02/13 ES-PCP F/L & H/UP

Bulletin Rev.:

Discipline:

Electrical

2. Applicable Codes & Stds. for design output verification & validation (Attach separate sheet, if required):
SP - 1099
SP - 1103
DEP 33.64.10.10

3. Statutory requirements (Specify, as applicable):


As specified in Standards

4.

Ambigious/conflicting requirements (Use separate sheet, if required):


Sl. #
Requirements
1 Not Applicable.

Prepared By:

Subcontractor:

Resolved (Tick
as resolved)

Resolved with
(Indicate Authority)

Reviewed By:

(When applicable)

Signature:

_______________________

_______________________

Name:

Sakthivel.R

_______________________

Designation:

Disp. Design Engineer

Design Focal Point

Manager (Engineering)

_______________________

_______________________

Date:
Note:

1) To be attached with Job Bulletin - Front Sheet.


2) This sheet shall be updated as the design evolves.

GWI03F02 / esaar

_______________________

You might also like