Controls Instrumentation Detail Engineering
Controls Instrumentation Detail Engineering
K. Rajender
2012 QuEST Global Services Pte Ltd. The information in this document is the property of QuEST Global Services Pte Ltd. and may not be copied or communicated to a
third party or used for any purpose other than that for which it is supplied without the written consent of QuEST Global Services Pte Ltd.
Contents
I/O List is a document containing list of instrumentation which serve as an input or output of control system.
Therefore, only the tag number that physically has a cable which connects to the control system appears on I/O
List.
When there are more than one control system in a plant (let say PCS and SIS), the I/O list shall clearly
indicates which instruments is assigned to which control system or may separate them to different section in the
document.
In I/O list, the following information should be stated but not limited to:
i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
ix.
Tag number
Loop Number
Service description
P&ID Number
Type of Instrument
Location
I/O Type
Control System
Range or set point
The information column in which I/O list contains may be as simple as above, however some project require I/O
list to be detailed by having alarm list, controller action, logic 0/1descriptor. Later on, I/O list would include I/O
number assignment (rack, slot, channel number) which information to be provided by control system vendor.
2. Instrument Index:
Instrument index is a document containing list of instrument devices within a plant. Instrument index shall
include tag number of all physical instruments (e.g. field instrument, physical alarm and indicator) and pseudo
instrument which commonly named soft tag (e.g DCS indication, alarm, and controller).
Instrument index shall be created at the beginning of project and considered as a live document which should
be kept updated even though the plant has been operated. Instrument index shall be revised if there is any plant
or system modification which impact to additional, removal, or resetting of instrument.
In instrument index document, the following information should be stated but not limited to:
i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
ix.
x.
Tag number
Loop Number
Type of Instrument
Location
Service description
P&ID Number
Line number or equipment number
I/O Type
Control System
Range or set point along with engineering unit used
Applicable reference Document (Instrument Data Sheet Number, Hook-up Drawing Number, Instrument
Layout Number, Loop Drawing Number)
Package Number
Manufacturer
Model Number
2012 QuEST Global Services Pte Ltd. Confidential
Instrument Index:
The following references are required in preparing instrument index to make it complete of information:
Reference drawing: P&ID, HMB
P&ID (Piping and Instrumentation Diagram)
From P&ID all instrument tag number are gathered along with its associated information such as service
description, instrument type, line/equipment number, set point. A good quality P&ID may have distinct symbol
that distinguish control system to which each instrument connected.
HMB (Heat and Material Balance)
We can determine measurement range of instrument based on process data on each stream from HMB (Heat
and Material Balance).
Reference document: Cause & Effect
Instrument index should include fire and gas related tag numbers. Fire and gas devices usually do not appear in
P&ID, they are stated in cause and effect instead.
The purpose of instrument index
From its self explanatory name, instrument index will be referred as an index for many purposes as follow:
As a basis to prepare the I/O list by extracting only the tag number which has I/O point
Searching, Listing, Filtering a tag number
Instrument IndexIndex-Template
Vendor catalog. It is recommended to refer vendor catalog during data sheet preparation to ensure that the device is
available on the market. Skipping this activity could result difficulties in finding the instrument on the market during
procurement phase. If the instrument is not available on the market, it could change the design, not only the instrument
design but also could revert back up to process design. Not only re-work, it also could result to project delay.
Code and Standard. Last but not least, cross check to the related code and standard is needed although this issue
mostly has been covered in project specification.
The purpose of instrument data sheet
When the data sheet completed, it is attached to requisition which to be sent to several vendors. Vendors will offer their
quotation with various model and manufacturer among the offers. It is an instrument engineer responsibility to evaluate all
quotation and determine which offer is technically acceptable.
Having been considered its technical and commercial aspects, the instrument is purchased. Following the purchase order,
vendor will submit supporting document and drawing. Based on vendor data, instrument data sheet may be updated to
accommodate details to make the data sheet as-built.
Finally, data sheet along with its supporting vendor data are stored in library or document control and will be referred during
construction, operation and maintenance.
10
4. Hookup Drawing
Hook-up drawing is a detailed drawing showing typical installation of instrument in a correct manner so that instrument operates
properly (gives accurate indication and prevent any issued which could potentially affect the measurement such as liquid trap in
gas impulse line).
Hook-up drawing indicates tubing slopes, position of instrument in reference to process tapping point, scope break between
instrument vs piping.
Hook-up drawing also gives information the requirement of bulk material for each installation. It also details its specification (size,
type and material) and the quantity.
There are two types of hook-up drawing:
1. Process Hook-Up
This hook-up drawing contains typical installations for instrument which connects to the process
1. Pneumatic Hook-Up
This hook-up drawing contains typical installations for instrument which requires instrument air such as control valve, actuated
valve
Reference drawing: P&ID, Installation Detail Specification, Piping Specification
P&ID tells the designer which instrument requires a hook-up drawing. A good designer can also read whether the instrument
tapped in gas service or liquid service.
Battery limit between instrument and piping shall be made clear, this is stated in P&ID symbol and typical sheet or piping
documents.
Installation detail specification will also specify items that should be utilized and factor that should be considered in one installation
The purpose of Instrument Hook Up Drawing
As stated earlier, information of the requirement of bulk material is stated for installation on each sheet hence the bulk material
required for the whole drawings could be summarized and tabulated in a document named Material Take Off.
During project construction phase, this drawing is also referred as a guidance of how to install the instrument properly.
2012 QuEST Global Services Pte Ltd. Confidential
11
Hookup DrawingDrawing-Template
12
13
Instrument Terminal number. Most instrument could be assumed to use (+) and (-). Terminals. Instrument which needs
special arrangement such as smoke detector or instrument which in series loop, requires manufacturer connection detail to
make the cable is properly connected.
Junction box terminal number, this information could be obtained from JB wiring connection
Marshaling terminal number, this information could be obtained from marshaling wiring connection.
I/O point detail information. Obtain this information from I/O assignment which is produced by system integrator or control
system vendor.
The purpose of instrument loop diagram
It is used in checking of a correct installation and connection when tested during pre-commissioning, commissioning and also
for trouble shooting during operation.
14
15
16
17
18
19
8. Cable Schedule
Cable Schedule is a document containing list of instrument cable This document shows cable as well as gland required
by each instrument or connection.
The information of the cable schedule shall consists:
i.
ii.
iii.
iv.
v.
vi.
Cable Number
Cable Type / Specification
Cable Size
Cable Length
Source and destination termination description
Cable gland type and size for each incoming cable
20
Cable ScheduleSchedule-Template
The purpose of Cable Schedule
Cable schedule is a reference in preparing Material Take-Off of cable for procurement. However, cable length shown on
this document are approximate only. Therefore, there should be contingency for material procurement to allow spare for cable
cutting, unexpected barrier in the field, riser, etc.
Cable schedule will be referred also during construction phase, however it is not recommended to cut the cable based on
the length information stated on the cable schedule. For actual cutting during installation, the common practice is to pull the
cable from its drum and cut in the field.
21
Interconnection block diagram is a drawing showing interconnection between each device including instrument, junction
box, marshaling cabinet, panel, etc. This drawing can provide a glance view of overall connection of system. Some
interconnection block diagrams provide detail information start from every field instruments up to control system. In larger
project, this interconnection block diagram shows only from junction box / package system to main control system while the
connection from junction box to each instrument is shown in junction box wiring diagram. Interconnection block diagram
should also indicate cable number of each cable connecting two devices.
Reference drawing: Instrument and control architecture diagram, instrument cable layout
To prepare an interconnection block diagram, reference should be made to instrument architecture diagram and Instrument
cable layout.
Instrument and control architecture diagram shows overall instrument and control system within a plant. Hence by having
a look to architecture diagram, the preparation of interconnection block diagram is easier.
Instrument cable layout shows every instruments connection to its junction box.
The purpose of interconnection block diagram drawing
As a reference for preparing junction box wiring diagram/ connection list and marshaling cabinet wiring diagram which both
subsequently are required for preparing instrument loop diagram.
Together with instrument cable layout, this drawing is also used as a reference for preparing instrument cable schedule
22
23
2012 QuEST Global Services Pte Ltd. The information in this document is the property of QuEST Global Services Pte Ltd. and may not be copied or communicated to a
third party or used for any purpose other than that for which it is supplied without the written consent of QuEST Global Services Pte Ltd.