Serial Page No. CA No CEUZ/UDH/ /2014-15 SCH 'A' (Contd) Part-I: List of Works and Prices For (Building Work)

This document appears to be a bid submission for building works that includes a list of works, unit rates, quantities, and total amounts. It includes the construction of blocks for medical rooms and storage accommodation, garbage bins, an incinerator, a septic tank, and a soakage well. The total amount carried over to the BOQ for all listed works is Rs. 17,146,500. Notes on several pages of the document provide additional specification details for the listed items.

Uploaded by

SandeepSharma
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views

Serial Page No. CA No CEUZ/UDH/ /2014-15 SCH 'A' (Contd) Part-I: List of Works and Prices For (Building Work)

This document appears to be a bid submission for building works that includes a list of works, unit rates, quantities, and total amounts. It includes the construction of blocks for medical rooms and storage accommodation, garbage bins, an incinerator, a septic tank, and a soakage well. The total amount carried over to the BOQ for all listed works is Rs. 17,146,500. Notes on several pages of the document provide additional specification details for the listed items.

Uploaded by

SandeepSharma
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CA No CEUZ/UDH/ /2014-15

Serial Page No.

SCH 'A' (CONTD)


PART-I : LIST OF WORKS AND PRICES FOR (BUILDING WORK)
Rate per unit

No of
Units
reqd

Amount in
Rs

Remarks

2430000.00
Each Block

01

2430000.00

14500000.00
Each Block

01

14500000.00

27000.00
Each

02

54,000.00

Ref schedule 'A' Notes no 7 on Srl Page No 15 for all items


under this sch.

48000.00
Each

01

48,000.00

Ref schedule 'A' Notes on Srl Page Nos 14 to 17 for all items.
under this sch.

60000.00
Each

1.00

60,000.00

54500.00
Each

1.00

54,500.00

1.

Construction of Block of MI
room, complete, all as
specified and shown on
drawings.

As applicable for all items as per list of drawings

Drg
No

Period of competion
of individual item
after handing over of
site.

Ser Description of items of works


No

Construction of Block of
Storage
accommodation,
storage accommodation (MT),
battery charging shop and
garages
(double
storey),
complete, all as specified and
shown on drawings.

Construction of Garbage bin,


complete, all as specified and
shown on drawings.
Construction of incinerator,
complete, all as specified and
shown on drawings.
Construction of Septic tank
for 50 users (single chamber)
with inlet chamber, complete,
all as specified and shown on
drawings.

Construction of Sokage Well


3.00 metre dia X 3.00 metre
deep (below inlet), complete,
all as specified and shown on
drawings.

Total of Sch'A' Part - I carried over to BOQ

(Signature of the Contractor)

Rs

17146500.00

AD (Contracts)
For Accepting Officer