100% found this document useful (1 vote)
218 views

Supplier'S Corrective Action Plan Supplier's Name: Khosla Engineering PVT LTD

1) The supplier Khosla Engineering Pvt Ltd provided this corrective action plan to address an issue reported by their customer Uravi T & Wedge Lamps involving 8 kgs of broken 20/80 S-16 swg solder wire. 2) Root cause analysis identified the most likely causes as negligence of the transporter and not respecting control methods to detect non-conformities before supply. 3) The supplier's corrective action plan involves updating quality documents like the process flow chart, control plan and work instructions, and monitoring effectiveness over the next 3 months to prevent recurrence.

Uploaded by

anandelectricals
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
218 views

Supplier'S Corrective Action Plan Supplier's Name: Khosla Engineering PVT LTD

1) The supplier Khosla Engineering Pvt Ltd provided this corrective action plan to address an issue reported by their customer Uravi T & Wedge Lamps involving 8 kgs of broken 20/80 S-16 swg solder wire. 2) Root cause analysis identified the most likely causes as negligence of the transporter and not respecting control methods to detect non-conformities before supply. 3) The supplier's corrective action plan involves updating quality documents like the process flow chart, control plan and work instructions, and monitoring effectiveness over the next 3 months to prevent recurrence.

Uploaded by

anandelectricals
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

URAVI T & WEDGE LAMPS PVT. LTD.

SCAP NO:

SUPPLIER'S CORRECTIVE ACTION PLAN


Supplier's Name : Khosla Engineering Pvt Ltd

Date:-

Part Description:-20/80 S-16 swg Solder Wire

Part No.:-

When Observed ( Date / Period):- 19.02.14


A PROBLEM STATEMENTShould
:
Answer
What (is the problem? (Expression by customer)
Who is affected
Where Location
When Since

Lot Details: -2157 Dt- 11.02.14


ISSUE REPORTED : .

Why is the problem

Spools Found Broken


Customer (Uravi T Wedge Lamps)
Jammu Plant
time on 20.02.14

First
Due to
8 Kgs (16

negligence of Transporter
Swg)

How much Qty


( Problem statement should answer 5W 1H ie What, When,Who,Where, & How.
( Attach sketch / data for details where required )

B
REASON FOR NON DETECTION OF BAD PARTS :
5 WHY ANALYSIS (ANALYSIS FOR NOT DETECTING DEFECT BEFORE SUPPLY)
WHY
WHY
WHY

WHY

WHY

ACTION TAKEN TO DISPOSE NON -CONFORMING PARTS:

YES

ROOT CAUSE ANALYSIS OF PROBLEM:

Machine

Man

Is M/C in good condition ?


YES

NO

YES

Are instruments / gauges calibrated ?

NO

NO

YES

NO

NO

YES

YES

NO

NO

YES

YES

Is the specified Raw Matl./Tooling used ?


YES

NO

Is the Raw Matl./Tooling Supplier change ?


YES

NO

Is the defect part was detected


by operator / inspector & later
mixed with production ?

NO

YES

NO

Are Control Plan/ SOP respected ?

NO

Are specified Control Methods used

Are Control Plan/SOP Adequate?


YES

NO

Are Control Methods Capable to detect Non


conformity?

Is it due to Rework ?

Is Maintenance done as per Plan


YES

YES

Is operator is under training ?

Parameters are respected ?


YES

Measurement

Is operator trained ?

Are M/C parameters known ?


YES

NO

NO

Is their Significant Variation in Material Properties ?


YES

NO

Is the Gas setting Changed?

NO

YES

NO

Material Quality Not OK


YES

Method
***

Space provided for any other cause

NO

Material / Tooling

Any Other

SCAP NO:

SUPPLIER'S CORRECTIVE ACTION PLAN


Supplier's Name : Khosla Engineering Pvt Ltd

Date:-

Analysis Conclusion:-

F
CORRECTIVE ACTION PLAN: ( Actions planned to avoid recurrence )
Sr.
Major causes identified
Action Plan
No.

ACTION TAKEN TO PREVENT RECURRENCE

Following quality documents changed due to implemented action plan :


( mention doc. no.)
Process Flow Chart
PFMEA
Control Plan
Work instruction / SOP

Action By

Target Date Comp. On

Gauge Drawing
Fixture Drawing
Any other

EFFECTIVENESS MONITORING : - To be filled after 3 months


Are actions taken are sufficient to fix the problem

YES

NO

Are actions planed completed / implemented

YES

NO

Is problem repeated in lots received after SCAP issue Date

YES

NO

Representative:
Signature / Date

You might also like