0% found this document useful (0 votes)
90 views

Timetable

The document outlines work to be completed for a music video project, including definition analysis, production treatments, pre-production planning, filming, post-production, designs for packaging and advertising, feedback sessions, and an evaluation. Key deadlines include September 9th for an initial director study, September 23rd for draft proposals and edits, October 26th for filming, December 12th for first edits and feedback, February 20th for final edits, and March 27th for evaluation questions.

Uploaded by

gabydixon
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
90 views

Timetable

The document outlines work to be completed for a music video project, including definition analysis, production treatments, pre-production planning, filming, post-production, designs for packaging and advertising, feedback sessions, and an evaluation. Key deadlines include September 9th for an initial director study, September 23rd for draft proposals and edits, October 26th for filming, December 12th for first edits and feedback, February 20th for final edits, and March 27th for evaluation questions.

Uploaded by

gabydixon
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Work to be Completed

Date to be Completed

Transition Music Video Project, Director Study

9th September

Definition of A Music Video

11th September

Production Treatment of Music Tracks, First Draft of Music Video


Proposal, Door Sequence Editing Task
2 Music Video Analysis

23rd September

Target Audience for Music Video

30th September

Pre-Production Planning Story Board, Recce Documents, Risk


Assessment, Participant Release Form, Moodboard, Artists
Communication
Filming Music Video

10th October

Post production First Edit Uploaded to Blog and Analysed, Audience


Feedback
Digipak Analyses, Magazine Advert Analysis, Digipak Planning, Magazine
Advertisement Planning
First proof Design of Digipak and Analysis

12th December

Skills Development, Final Edit of Music Video

20th February

Target Audience Feedback, Focus Group

6th March

Final Digipak and Magazine Advertisment

10th March

Evaluation Questions

27th March

Complete
Near or entirely complete, but needs more work
Unfinished

26th September

26th October

23rd January
13th February