CPM
CPM
BAHAGIAN PEMBANGUNAN
USAHAWAN NEGERI KELANTAN
12/08/2002 HINGGA 14/08/2002
MILESTONE
Rule No 1 :
All Points MUST start and Finish Together
Rule No 2 :
Milestone has a ZERO duration
ACTIVITY
The contents of the program
(Isi kandungan CPM)
Rule No 1 :
Must contain DURATION
Rule No 2 :
Must be linked IN and OUT
RELATIONSHIP
The Link between ACTIVITIES
(Perhubungan di antara AKTIVITI)
Rule No 1 :
Must be either Finish to Finish, Finish to Start, Start to
Finish and Start to Start
Rule No 2 :
Can have LAG or LEAD values
? Critical Path
A series of interconnected activities through the network diagram, with
each activity having zero free and total float time. The critical path
determines the minimum time to complete the project
LANGKAH-LANGKAH ASAS
UNTUK MENYEDIAKAN CPM
1.
2.
3.
4.
EF = ES + D (FORWARD PASS)
LS = EF D (BACKWARD PASS)
TF = LF EF = LS ES
KRITIKAL
?
TF = FF = 0
LEGEND
Backward Pass : LS = LF - D
LS
No
LF
Activity
Description
ES
EF
Forward Pass : EF = ES + D
Contoh Pengiraan
(Precedence Diagram)
3
10
B
3
LS
LF
10
D
5
13
13
F
9
14
H
12
12
13
14
17
A
0
ES
EF
14
2
C
2
10
10
E
7
12
12
G
10
10
14
I
12
12
14
17