0% found this document useful (0 votes)
10 views

PVM - R S O S N A: Egional Upport Rganization Ystem Avigation ID

To create an Engineering Change Number (ECN) in the system: 1. Access the transaction using the provided menu path and enter the change number. 2. On the next screen, enter the change number description, valid from date, and change number status. 3. Click save. The change number can now be used to update BOM or other SAP objects.
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views

PVM - R S O S N A: Egional Upport Rganization Ystem Avigation ID

To create an Engineering Change Number (ECN) in the system: 1. Access the transaction using the provided menu path and enter the change number. 2. On the next screen, enter the change number description, valid from date, and change number status. 3. Click save. The change number can now be used to update BOM or other SAP objects.
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

PVM REGIONAL SUPPORT ORGANIZATION

SYSTEM NAVIGATION AID


Perfetti Van
Melle
Create Engineering Change Number (ECN)
Document Change Control
Release Description Created
by
Date Reviewed
by
Date Approved
by
Date
v.1 Create ECN Michelle 10-Jan-12
Purpose
To keep track of all changes to BOM, o!ting an" other #$% O&'ects.
Pre-requisites
None.
Menu Path
#$% Men!()ogistics(Central *!nctions(Engineering(Engineering Change
Manage+ent(Change N!+&er(Create
CC01
Work Instruction - Create Engineering Change Number (ECN)
1. $ccess the transaction !sing the +en! path.
2. On the initial screen, enter Change N!+&er then press ENTE or click O, &!tton.
Page 1 of 3
PVM REGIONAL SUPPORT ORGANIZATION
SYSTEM NAVIGATION AID
Perfetti Van
Melle
-. On the ne.t screen, enter Change N!+&er /escription, 0ali" *ro+ an" Change No. #tat!s.
1. %ress ENTE. Check $ctv, O&'ect, Mgtec !n"er Bill of Material ro2.
3. Click #ave.
es!lt
Change Number can now be used for updating !M or other "#P ob$ects%
Page 2 of 3
*iel" Na+e /escription 4O4C 5ser $ction an" 0al!es Co++ents
Change
N!+&er
$ n!+&er
6$lphaN!+eric7 that 2ill
i"entif8 a change +aster
recor"
6$lphaN!+eric7
*iel" Na+e /escription 4O4C 5ser $ction an" 0al!es Co++ents
ECN
/escription
Te.t that "escri&es the
Change N!+&er or
Change Master
Change N!+&er /escription
0ali" *ro+ 9n"icates the start of the
vali"it8 perio" of an o&'ect
6s!ch &ill of +aterial7.
/ate fro+ 2hich the !p"ate
2ill &e vali"
Change No.
#tat!s
,e8 2hich "escri&es the
c!rrent processing stat!s
of the change n!+&er.
01
*iel" Na+e /escription 4O4C 5ser $ction an" 0al!es Co++ents
$ctv. 9n"icates that this change
n!+&er can &e !se" to
process o&'ects of this
o&'ect t8pe 6s!ch as,
BOM7.
O checke"
O&'ect 9n"icates that o&'ects 2ith
this o&'ect t8pe that 8o!
process 2ith reference to
this change n!+&er, can
onl8 &e processe" 2ith
o&'ect +anage+ent
recor"s.
O checke"
Mgtec 9n"icates that
+anage+ent recor"s are
create" a!to+aticall8 for
all o&'ects 2ith this t8pe
6s!ch as, BOM7 that are
processe" !sing this
change n!+&er.
O checke"
PVM REGIONAL SUPPORT ORGANIZATION
SYSTEM NAVIGATION AID
Perfetti Van
Melle
Page 3 of 3

You might also like