Tce Consulting Engineers Limited: Checking Calibration of Theodolite
1. The document is a form for checking the calibration of a theodolite instrument. It includes fields to record the instrument details, temperature, date of checking, horizontal and vertical angle measurements taken in different positions with the left and right faces, and notes on calibration procedure.
2. Angle measurements taken with the left and right faces in different positions are recorded to check for consistency and any differences would signify instrument error.
3. The contractor is responsible for taking appropriate corrective action if errors are found to eliminate them.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
22 views1 page
Tce Consulting Engineers Limited: Checking Calibration of Theodolite
1. The document is a form for checking the calibration of a theodolite instrument. It includes fields to record the instrument details, temperature, date of checking, horizontal and vertical angle measurements taken in different positions with the left and right faces, and notes on calibration procedure.
2. Angle measurements taken with the left and right faces in different positions are recorded to check for consistency and any differences would signify instrument error.
3. The contractor is responsible for taking appropriate corrective action if errors are found to eliminate them.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1
TCE-M7-CV-QA-F-001
TCE CONSULTING ENGINEERS LIMITED
SH : 1 OF 1 CHECKING CALIBRATION OF THEODOLITE Proje! : S"#!e$ : C%&e'! ( )o* No+ : B,&%-&'. ( S!r+ : Co'!r/!or : Re0+ Do,$e'!# : 11 De#r&2!&o' : 31 Issue R1 FILE NAME: TCE-M7-CV-QA-F-001.doc Contractor TCE Remarks ( if any ) Name Designation Signature & Date Instrument : a) Make : ) Mode! No. : c) "er#a! No. : Tem$erature : %ate o& C'eck#n( : For Horizonta !nge
Instrument )os#t#on No. Face Le&t Face *#('t *emarks An(!e A Vern#er I An(!e A Vern#er II An(!e A Vern#er I An(!e A Vern#er II 1 + , - . / For "ertica !nge Instrument )os#t#on No. Face Le&t Face *#('t *emarks An(!e 0 Vern#er I An(!e 0 Vern#er II An(!e 0 Vern#er I An(!e 0 Vern#er II 1 + , - . / Notes :- 1. An(!e measured 1 Face Le&t 2 Face *#('t 3#t' ot' Vern#ers s'a!! e same. +. %#&&erence4s #n an(!e measurement s#(n#&#es Instrument Error and a$$ro$r#ate correct#5e act#on s'a!! e taken 1 t'e Contractor to e!#m#nate t'e error.