0% found this document useful (0 votes)
22 views1 page

Tce Consulting Engineers Limited: Checking Calibration of Theodolite

1. The document is a form for checking the calibration of a theodolite instrument. It includes fields to record the instrument details, temperature, date of checking, horizontal and vertical angle measurements taken in different positions with the left and right faces, and notes on calibration procedure. 2. Angle measurements taken with the left and right faces in different positions are recorded to check for consistency and any differences would signify instrument error. 3. The contractor is responsible for taking appropriate corrective action if errors are found to eliminate them.

Uploaded by

kannagi198
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views1 page

Tce Consulting Engineers Limited: Checking Calibration of Theodolite

1. The document is a form for checking the calibration of a theodolite instrument. It includes fields to record the instrument details, temperature, date of checking, horizontal and vertical angle measurements taken in different positions with the left and right faces, and notes on calibration procedure. 2. Angle measurements taken with the left and right faces in different positions are recorded to check for consistency and any differences would signify instrument error. 3. The contractor is responsible for taking appropriate corrective action if errors are found to eliminate them.

Uploaded by

kannagi198
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

TCE-M7-CV-QA-F-001

TCE CONSULTING ENGINEERS LIMITED


SH : 1 OF 1
CHECKING CALIBRATION OF THEODOLITE
Proje! : S"#!e$ :
C%&e'! ( )o* No+ : B,&%-&'. ( S!r+ :
Co'!r/!or : Re0+ Do,$e'!# : 11
De#r&2!&o' : 31
Issue
R1
FILE NAME: TCE-M7-CV-QA-F-001.doc
Contractor TCE Remarks ( if any )
Name
Designation
Signature & Date
Instrument : a) Make : ) Mode! No. : c) "er#a! No. :
Tem$erature : %ate o& C'eck#n( :
For Horizonta !nge

Instrument
)os#t#on
No.
Face Le&t Face *#('t
*emarks
An(!e A
Vern#er I
An(!e A
Vern#er II
An(!e A
Vern#er I
An(!e A
Vern#er II
1
+
,
-
.
/
For "ertica !nge
Instrument
)os#t#on
No.
Face Le&t Face *#('t
*emarks
An(!e 0
Vern#er I
An(!e 0
Vern#er II
An(!e 0
Vern#er I
An(!e 0
Vern#er II
1
+
,
-
.
/
Notes :- 1. An(!e measured 1 Face Le&t 2 Face *#('t 3#t' ot' Vern#ers s'a!! e same.
+. %#&&erence4s #n an(!e measurement s#(n#&#es Instrument Error and a$$ro$r#ate
correct#5e act#on s'a!! e taken 1 t'e Contractor to e!#m#nate t'e error.

You might also like