This document summarizes the drilling mud systems and materials consumption for the PPCoN MAERSK GUARDIAN well EGDAR 2/7-30. It drilled to a total depth of 11410 feet using various mud types in different hole sizes. The document provides tables of materials used and costs for each drilled interval. The total materials cost for the well was over $300,000 USD.
This document summarizes the drilling mud systems and materials consumption for the PPCoN MAERSK GUARDIAN well EGDAR 2/7-30. It drilled to a total depth of 11410 feet using various mud types in different hole sizes. The document provides tables of materials used and costs for each drilled interval. The total materials cost for the well was over $300,000 USD.
WE11 EGDAR 2/7-30 OPERATOR WELL LOCATION SPUD DATE DATE TD TOTAL DEPTH MUD SYSTEMS Seawater/Bentonite Bentonite/Native Clay KCl/Pac/Glycol KCI/Pac/Glycol KCI/Pac/Glycol SYNOPSIS PPCoN Egdar 2/7-30 Egdar 27.02.95 03.04.95 11410 Ft. Drilling 36" Interval Drilling 26" Interval Drilling 17 1/2" Interval Drilling 12 1/4" Interval Drilling 8 1/2" Interval 36" Hole to 695 Ft. 26" Hole to 1540 Ft. 17 1/2" Hole to 5034 Ft. 12 1/4" Hole to 10302 Ft. 8 1/2" Hole to 11410 Ft. 30" Casing to 685 Ft. 20" Casing to 1517 Ft 13 3/8" Casing to 5014 Ft. 9 7/8" Casing to 10289 Ft. ENGINEERED BY: George H. Grant Ray Griffiths Paul van Laar Tu Tran Ivar Madland M-J Norge A.S. Page 2 PPCoN MAERSK GUARDIAN WEU EGDAR 2/7-30 SECTION 3 INTERVAL MATERIALS CONSUMPTION M-INorgeA.S. Page 15 PPCoN MAERSK GUARDIAN WE11 EGDAR 2/7-30 Well No Interval Holesize Mud Type Section length drilled Formation Volume Drilled Interval Materials Consumption EGDAR 2/7-30 370 - 685 ft 36.00" Seawater/Bent sweeps 315 ft 226.4BBL MATERIAL UNIT SIZE UNITS USED UNIT COST COST USD/ BBL BARITE CAUSTIC SODA ASH XCD POLYMER BENTONITE MT 25Kg 25 Kg 25 Kg MT 12 1 3 16 27 90.00 17.00 8.00 261.00 242.85 1080.00 17.00 24.00 4176.00 6556.95 0.56 0.01 0.01 2.17 3.40 INTERVAL MATERIAL COST 11853.95 USD Well No Interval Holesize Mud Type Section length drilled Formation Volume Drilled Interval Materials Consumption EGDAR 2/7-30 685 - 1540 ft 26.00" Seawater/Bentonite 855 ft 328.7BBL MATERIAL UNIT SIZE UNITS USED UNIT COST COST USD/ BBL BARITE BENTONITE SODA ASH XCD POLYMER BENTONITE MT 25 Kg 25 Kg 25 Kg MT 68 418 2 15 6 90.00 8.00 8.00 261.00 242.85 6120.00 3344.00 16.00 3915.00 1457.10 2.09 1.14 0.01 1.33 0.50 INTERVAL MATERIAL COST 14852.10 USD M-I N o r g e A.S. Page 16 PPCoN MAERSK GUARDIAN WEH EGDAR 2/7-30 Well No Interval Holesize Mud Type I n t e r v a l M a t e r i a l s Section length drilled Formation Volume MATERIAL BARITE KCL BRINE DRISPAC+ SL DRISPAC+REG GLYCOL XCD POLYMER SOD BICARB KC1 Drilled UNIT SIZE MT Bbl 50 Lb 50 Lb Bbl 25 Kg 25 Kg 25 kg INTERVAL MATERIAL COST : C o n s u m p t i o n EGDAR 2/7-30 1540 - 17.50" 5034 ft KCl/Pac/Glycol 3494 ft 1039.1BBL UNITS USED 248 3277 376 63 157 5 40 560 UNIT COST 90.00 10.66 94.00 94.00 242.00 261.00 10.00 5.50 COST 22320. 34932. 35344. 5922. 37994. 1305. 400. 3080. 141297. 00 82 00 00 00 00 00 00 82 USD/ BBL 5.09 7.97 8.06 1.35 8.67 0.30 0.09 0.70 USD Well No Interval Holesize Mud Type Section length drilled Formation Volume Drilled Interval Materials Consumption EGDAR 2/7-30 5034 - 10302 f t 12.25" KCL/Pac/Glycol 5268 f t 767.8BBL MATERIAL BARITE CAUSTIC KCL BRINE DRISPAC+ SL DRISPAC+REG GLYCOL SOD BICARB KC1 CITRIC ACID BRONNSAPE UNIT SIZE MT 25Kg Bbl 50 Lb 50 Lb Bbl 25 Kg 25 kg 25 Kg 200 Lt INTERVAL MATERIAL COST : UNITS USED 809 4 2473 247 20 241 36 920 23 1 UNIT COST 90.00 17.00 10.66 94.00 94.00 242.00 10.00 5.50 42.17 550.00 COST 72810.00 68.00 26362.18 23218.00 1880.00 58322.00 360.00 5060.00 969.91 550.00 189600.09 USD/ BBL 13.79 0.01 4.99 4.40 0.36 11.05 0.07 0.96 0.18 0.10 USD M-I Norge A.S. Page 17 PPCoN MAERSK GUARDIAN WE11 EGDAR 2/7-30 Interval Holesize Mud Type I n t e r v a l M a t e r i a l s Section length drilled Formation Volume MATERIAL BARITE KCL BRINE DRISPAC+ SL DRISPAC+REG GLYCOL XCD POLYMER SOD BICARB KCl CITRIC ACID DRILLTHIN Drilled UNIT SIZE MT Bbl 50 Lb 50 Lb Bbl 25 Kg 25 Kg 25 kg 25 Kg 25 Lb INTERVAL MATERIAL COST : : 10302 - : 8.50" C o n s u m p t i o n 11410 ft : KCL/Pac/Glycol : 1108 ft : 77.2BBL UNITS USED 20 220 70 23 20 12 30 264 100 10 UNIT COST 90.00 10.66 94.00 94.00 242.00 261.00 10.00 5.50 42.17 242.85 COST 1800.00 2345.20 6580.00 2162.00 4840.00 3132.00 300.00 1452.00 4217.00 2428.50 29256.70 USD/ BBL 4.37 5.69 15.97 5.25 11.75 7.60 0.73 3.53 10.24 5.90 USD M-I Norge A.S. Page 18