Question 1: Two Students Are Building A Robot To Participate in The Local

Two students are building a robot to compete in a local robot soccer competition. They have a series of tasks to complete with durations and dependencies listed. The tasks are: Student A designs and builds the base and motors in 5 days. Student B designs sensor circuits and microcontrollers in 4 days. Together they assemble the parts in 3 days after tasks A and B. Together they write software to control the robot in 7 days after assembly. Student A tests motion and speed in 2 days after software. Student B tests vision and response in 2 days after software. Together they test against other robots in 10 days after individual testing.

Uploaded by

Seham123123
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views2 pages

Question 1: Two Students Are Building A Robot To Participate in The Local

Two students are building a robot to compete in a local robot soccer competition. They have a series of tasks to complete with durations and dependencies listed. The tasks are: Student A designs and builds the base and motors in 5 days. Student B designs sensor circuits and microcontrollers in 4 days. Together they assemble the parts in 3 days after tasks A and B. Together they write software to control the robot in 7 days after assembly. Student A tests motion and speed in 2 days after software. Student B tests vision and response in 2 days after software. Together they test against other robots in 10 days after individual testing.

Uploaded by

Seham123123
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Cs305 SW Engineering

1
nd
Semester 1433/34 H
Assignment 1:Prject management
Shagra University
College of Sciences and Hmanities
Section:__________________ ID: Name:
Total(10): d(2) c(1) b(1) a(6):
!estion 1" Two students are building a robot to participate in the local
RoboCup soccer tournament, a programming and engineering-influenced
competition held every year in Saudi Arabia. The tasks to build the robot by
these students are listed in the table below
A
c
t
i
v
i
t
y
Description Required
Predecessor
Duration
(days)
A
Student ! designs and builds the base
and steering motors.
-- "
#
Student $ designs and builds the
sensor circuits and micro controllers.
-- !"
C
#oth students get together to assemble
the parts.
A,# %
&
#oth students write the software
program to control the robot to
respond to all sensors.
C $$
'
Student ! tests the robot(s motion,
speed and stability.
& !"
)
Student $ tests the robot(s vision,
perception and response to all stimuli.
& !$
*
#oth students test whether the robot is
robust enough to deal with challenges
from other robot players.
',) +

Answer the following questions (put your answer in the answer sheet):
a. Draw the corresponding actiity networ! in the answer sheet.
". Identify the critical path.
c. #hat is the shortest time required to "uild the ro"ot$
d. If the start of actiity A is delayed for % days& will the ro"ot "uilding actiity "e
delayed$
' S
'
(
' S
'
(
' S
'
(
' S
'
(
' S
'
(
' S
5 0 '
(
' S
'
(
S)A*
A (+)
, (-+)
. (/)
D (00)
1 (-0)' (-+) 2 (3)