This document provides instructions for excluding materials from an MRP run in SAP. It instructs the user to select a plant, planning period, and materials or components to exclude from the MRP run. The user should then delete the selected items using the trash icon. The document also lists relevant transaction codes for MRP runs and stock requirement lists.
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
51 views
MD61: Place The Requirements For Product Group
This document provides instructions for excluding materials from an MRP run in SAP. It instructs the user to select a plant, planning period, and materials or components to exclude from the MRP run. The user should then delete the selected items using the trash icon. The document also lists relevant transaction codes for MRP runs and stock requirement lists.
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3
MD61: Place the Requirements for Product Group.
Exclusion of Material from MRP Run:
Select the Line item and Press Trash Icon l Product Group Selection Select the Plant Select the Planning Period Select the Materials and Components for whom MRP need not to be run and delete the same by using Trash Icon.